GIS - Switch Gears
GIS - Switch Gears
Ltd
2
Generation, Transmission and Distribution System
Power Evacuation
Substation
Electrical installation
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
Distribution System
Feb 24 ,2006
3
Sub-Station
§ Evacuation
Substation
§ Sub – Transmission
§ Transmission Substation
Substation
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
§ Distribution Substation
Feb 24 ,2006
4
Grid Network - Process
Transmission
Power Evacuation Distribution
Substation
Substation Substation
• Location is decided
• Located adjacent
based on to • Location is near the
the Power Plant Grid
Transmission load
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
• Preferred voltage
Network • Preferred voltage
level 765 kV, 400
• Preferred kV,
voltage level 132 kV, 66 kV, 33
245 kV
level 765 kV, 400 kV, kV
• Voltage
245Depends
kV, 132 kVon • Voltage Depends on
Quantum of Power,
• Voltage Depends on Power Demand
Distance of
Length of
Transmission
Transmission Line
Feb 24 ,2006
5
Equipment Description
Incoming line
Ground
wire Outgoing
line
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
Transformer
CVT
CVT
BPI
CB
DS
DS
DS
DS
CT
SA
CB
SA
SA
SA
CT
6
Bus – Bar Configuration
Single Bus Bar
n Application
n Industrial stations with
With Sectionaliser voltage level generally up to
220 kV
n Features
n Simple system
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
7
Bus – Bar Configuration
Double Bus Bar
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
8
Bus – Bar Configuration
Two main and Transfer bus
Transfer
§ Application
Main-2
§ Power evacuation station
and Interconnecting
Main-1 substation for transmission
lines
§ Features
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
Protection system
Transfer
9
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
Feb 24 ,2006
1
Three Bus Bar
Bus – Bar Configuration
Main-1
Main-2
Transfer
Bus – Bar Configuration
One and a Half Breaker
§ Application
§ Adopted where high reliability is
required
§ Power evacuation station for big
power plant and Interconnecting
transmission substations with 765
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
/ 400 kV level
§ Features
§ Very high reliability
§ Costly because of increased no. of
Main-1 Circuit Breaker
Main-2 § Complex Control & Protection
philosophy
Feb 24 ,2006
1
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
Feb 24 ,2006
1
Main-1
One and a Half Breaker
Bus – Bar Configuration
Main-2
Substation
Main Equipment Testing
1
Substation
Main Equipment Testing
1
Substation
Engineered Items
1
Substation
Auxiliary Equipment
1. LVAC Switchgear panel
2. AC Distribution board
3. Battery & Battery Charger
4. DC Distribution board
5. Auxiliary LT transformer
6. Lighting Transformer
7. Main Lighting Distribution board
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
1
Substation
Auxiliary System
n Illumination system
n Indoor (Control Room Building, DG, FFPH Building.)
n Outdoor switchyard
n Fire fighting and fire detection system
n Air conditioning and ventilation system
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
Feb 24 ,2006
1
Substation
Transformer Checklist
n Check oil level and Oil leakages from tank, conservator, radiator, joints etc.
n Check Silica gel in the Main & OLTC breather is active/blue in colour
n Unused secondary cores of Bushing CT have been shorted, if provided
n Check CT star point is formed correctly and earthed at one end only as per scheme
n Check cooling fan operation in Manual/Auto mode & direction of rotation
n For off load tap changer, the tap switch is locked properly in desired tap position
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
Feb 24 ,2006
1
Substation
CT Checklist
n Check the primary terminals P1& P2 are connected to the bus as shown in the
drawing
n Secondary connections are completed properly as per the drawing And terminals are
tightened
n The tan delta terminal is connected properly to Earth
n Unused secondary cores, if any are shorted and earthed in the JB/ TB
n The star point has been formed and earthed at one end only
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
Feb 24 ,2006
1
Substation
PT / CVT Checklist
n Check for oil marks/oil leakage, oil level
n Check the HF terminal is earthed properly (if not used for PLCC)
n The star point has been formed and earthed
n Links and connections are tightened properly
n No secondary cores are shorted and all secondary fuses are healthy in the Junction
Box
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
Feb 24 ,2006
2
Substation
Isolator Checklist
full load current & O/L relay is set for full load current given on
motor nameplate
n All moving parts of drive mechanism are periodically lubricated
n Check for Changeover of Aux. Contacts during open & close
operation
n Electrical Interlock as per the approved schematics
Feb 24 ,2006
2
Substation
CB and LA Checklist
n SF6 gas is filled up to the required pressure (with temperature
compensation)
n Check that there is no SF6 gas leakage in pipes, valves, joints
etc.
n Close & trip coil resistance checked
n Check the operation of CB for following:
n Closing & tripping through CB Control switch in
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
Local/Remote mode
n Close & trip block for low SF6 gas pressure
n Tripping through emergency trip unit (if provided)
n Check Anti pumping feature of CB
n Check that one end of surge counter is connected to bottom of
LA stack & One end has been earthed
n Check Surge counter operations
n Check on charging, the surge counter pointer is in green zone
Feb 24 ,2006
2
Contents
n The Structure of 145kV GIS
n Erection On site
n Commissioning On site
n Operation on local and routine check
n GIS Maintenance
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
Note: we reserve all copyrights, and subject to technical modifications without notification .
Feb 24 ,2006
ABB GIS Product Range
Sub-Transmission
n The GIS type consists of a number of different modules. These individual modules
are interconnected by means of bolted flange of identical dimensions connections.
That allow a very flexible arrangement of the different modules to fit mostly all
applications.
n All individual modules can perform ideally by means of rationalization design, careful
Feb 24 ,2006
Fast acting
Earthing
1 7 Switch (FES)
2 7
Cable Champer
Feb 24 ,2006
Circuit Breaker
2
GIS Double Busbar Configuration
Gas Insulated Switchgear- Technology
Perfect Modules result in Perfect Systems
Circuit Diagram ELK-04
3 Double bus-bar
Double bus-bar
bay
5 bay
Legend 1
4
2 1
6
3
4 7
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
2
5
6 ELK-04
Substation with
7 7 bays
Double bus-bar
1 Disconnecting and Earthing switch
2 Circuit Breaker
3 Current Transformer
4 Disconnecting and Earthing switch
5 Voltage Transformer
Feb 24 ,2006
= Heat chamber
It is used for opening the large load
(15 KA to 40 KA)
= Blast chamber
It is used for opening normal load. (<
15KA)
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
Feb 24 ,2006
Hydraulic Spring Operating Mechanism HMB-1
n This drive combines the advantages of the hydraulic operated mechanism with
spring energy storage. The energy is stored in a disk spring.
n HMB-1
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
Feb 24 ,2006
HMB-1 Mechanism
Hydraulic Spring Operating Mechanism HMB-1
n The primary and the secondary windings are galvanically separated and they are
insulated by the insulated material.
Feb 24 ,2006
FES Design
n The earthing switch consists of the
switching device and a fixed
contact which is mounted to the
earthed unit.
n SF6 gas is used for insulation and arc extinguishing. GIS is insulated by
barriers to the different gas compartments, such as CB compartment,
DES compartment etc. and there is a density relay in each compartment
monitoring the gas density.
n During the installation, each compartment shall be filled comply with a
guiding sequence.
n Each gas compartment is configured a gas valve and it’s convenient to
check the gas, for example gas refilling and gas measurement.
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
Feb 24 ,2006
Gas System
Gas compartment figure Barrier insulator
Bus bar
PT
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
Feeder
Disconnector
Feb 24 ,2006
© ABB Huadian High Voltage Switchgear (Xiamen) Co.,Ltd
Feb24,2006
n The enclosure of the GIS is made of non corrosive aluminium,the GIS is small
dimension and low weight.In manufacture,one and more modules are assemblied as
a derivery unit for testing and quality controling,thus the installation working on site
will be saved.
n It does not have special request in delivery road.
n According to constract, ABB will give support and service which is needed in GIS
installation and commissioning.
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
Feb 24 ,2006
Inspect Before Erection
n Goods must be check in according to packing list and its packing status must be
check.
n ABB site engineer must be in site while goods checking. all of parts must be checked
according to list, in order to avoiding mistake.
n Don’t release any pressure of compartment before installation.
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
Feb 24 ,2006
Safety onsite
n Make sure to strictly comply with safe working regulations and rules which is issued
by relational organization.
n Make sure to strictly comply with ABB product manual GIS, please pay attention for
note and warning.
q connector.
q links.
q O-Ring.
q Insulators.
Feb 24 ,2006
Caution of Installation
n SF6 can loose its arc quenching and insulating properties when contaminated. for
this reason, all surfaces and components that will be in contact with SF6 have been
thoroughly cleaned in our factory and have been installed under conditions of utmost
cleanliness. when on open devices or gas compartments, avoid the entry of or
contact with dirt, sweat and humidity at any time.
n Once the transport covers have been removed, the installation of the flange must be
completed without interruptions. If interruption can’t be avoided, open flanges must
be covered with a clean plastic foil.
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
n
Bay and bay Connecting
Module Installation
Compartment Evacuation
n Normally, gas compartment must be
evacuated immediately after modules was
installed.
n Vacuum requirement: continue to evacuate
1 hour when compartment pressure is
100Kpa below and shut off vacuum device,
check its pressure in 5 hour’s.
n Continue to evacuate about 1-2 hours and
then SF6 gas can be filled into the gas
compartment.
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
Feb 24 ,2006
Compartment Filling
n After the vacuum of compartment, the gas compart-ments are initially filled up to a
pressure of 150KPa only, it could not be filled up to its rated filling pressure before all
installation work have been completed.
n Its rated filling pressure must be changed to the ambient temperature.
(100Kpa=1bar)
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
Feb 24 ,2006
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
Feb 24 ,2006
Filling pressure
Cable lay and wiring
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
According to the difference of designed layout, cable lay and wiring have difference
steps on site.
n 1)Combination: cable was lie and wired in workshop, so that will be a little work on
site, the cable working can be saved.
n 2)Separation: the cable which connect from LCC to module will be lie and wired on
site.
Feb 24 ,2006
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
Feb 24 ,2006
Cable Plug
Earthing
Testing Scene
Check of Density relays and Gas tightness
n Earthing Check
Check the earthing connections according to the primary layout. Measurement
of PT,CT and SA.
Check the characters of these equipment and compare with the routine reports
of manufactory.
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
Feb 24 ,2006
Mechanical Testing
1. Test purpose: Measure the open and close times of circuit breaker and the
continuous currents of the motor, check the operating sequence, measure the
motor running time from zero to rating power etc.
2. Testing instrument: C.B. analyzer, DC ammeter, stopwatch etc.
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
Feb 24 ,2006
Measurement Methods
3. Measurement methods
3.1 Measure the characters of C.B. mechanical function by means of the
conductor of FES and ES both sides of the C.B.
3.2 Adding a DC ammeter into the power circuit and operating the switch, then
the continuous currents of motor can be measured
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
Feb 24 ,2006
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
Feb 24 ,2006
According to the drawings, checking that the secondary circuit must be followed
to designs and could be worked well, such as operating circuit, signal circuit,
inter-blocked circuit etc.
n This test of one minute duration has been proven over many years of practical
application. The subsequent successful energizing of the tested GIS shows that this
test guarantees a safe and reliable operation of the GIS.
n The high voltage test of the main circuits will be performed after all installation works
have been completed. The AC test voltage is usually 80% of the power frequency
voltage used for the routine test in the factory and is applied for one minute.
n During the HV test, the following sections must be disconnected:
Voltage transformer
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
Surge arrester
High-voltage cable
Feb 24 ,2006
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
Feb 24 ,2006
Testing Figures
Site and after-sales Service Operation on local
© ABB Huadian High Voltage Switchgear (Xiamen) Co.,Ltd
n In the interest of operational safety for personnel and equipment, the following
general safety instructions have to be strictly observed. If local safety regulations are
applicable more extensive or more protective, they have the priority over these
instructions. all applicable national regulations must observed with regard to:
electrical safety
accident prevention handing of
Waste and disposal
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
Feb 24 ,2006
Normal Operation
n Remote operartion
Change-over switch is turned to
REMOTE and local operation is
blocked.
n Local operation
Change-over switch is turned to
LOCAL and then remote
operation is blocked, but the
protection trip isn’t blocked.
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
n OFF position
When the switch is turned to OFF
position and then remote and
local blocked, but it doesn’t block
protection trip.
Feb 24 ,2006
Emergency Operation
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
n During emergency operation, circuit breaker can be manually switched directly at the
device by actuating the control valves.
n Note: If the alarm “C.B. trip blocked” is triggered, CB may be switched off manually
by means of the control valves only if the relevant feeder is de-energized. If the
alarm “C.B. close blocked” is triggered, CB may be switched on manually by means
of the control valves only if the relevant feeder is de-energized.
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
Feb 24 ,2006
Manual Operation (DES)
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
n Check and record the leakage current and surged number of SA.
SA(surge arrester)。
n Leakage current are listed as below
Isa<1.15mA
or Isa<0.7mA
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
Feb 24 ,2006
Routine Service-counter
n Pump counter records the number of hydraulic pump starts and it can’t be reset
manually. There may be a leakages in the hydraulic system if pump counter shows a
great number.
n up to 10 pump starts per day are permissible up to more then 10 pump stats per
day, the mechanism shall be monitored. up to more then 20 pump starts per
day, please contact with ABB.
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
Feb 24 ,2006
© ABB Huadian High Voltage Switchgear (Xiamen) Co.,Ltd
Feb24,2006
q The operational safety of gas insulated switchgear is not affected by any external
impacts such as dirt, humidity etc. For this reason, our sf6-gas insulated switchgear,
type EXK-0 requires virtually no maintenance.
q The GIS operations and monitoring in service are performed in the control center, so
it is easy to find out some change of the GIS characters, such as density, fault
signal, the condition of mechanism etc.
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
Feb 24 ,2006
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
Feb 24 ,2006
Maintenance
Note
n Inspection
Function and visual inspections are carried out at 8-year intervals. The gas
compartments are not opened during these checks.
n Maintenance
We recommend calling in our service for all work involving the interior parts of the
switchgear, please contact our service.
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
Feb 24 ,2006
Maintenance of the Control Devices
7. This function check include devices operated circuit, manual operation circuit, alarm
circuit check, mechanism operation, remote control etc.
8. Mechanical functional test of Circuit breaker
9. Main circuit voltage drop measurement.
10. Earthing check
n More maintenance detail information, refer to the service of ABB products manual
GIS type EXK-0.
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
Feb 24 ,2006
© ABB Huadian High Voltage Switchgear (Xiamen) Co.Ltd
Feb 24 ,2006