Labor Production Rates: Concrete Works

The document outlines labor productivity rates for various construction items over an 8 hour period. It provides productivity quantities for tasks like concrete works with formwork, reinforcement, and pouring. Masonry rates are also included for tasks like solid and hollow blockwork at different thicknesses with pointing. Miscellaneous tasks like cutting, chasing, and block shifting are also listed with expected daily outputs.

Uploaded by

Raif
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
189 views

Labor Production Rates: Concrete Works

The document outlines labor productivity rates for various construction items over an 8 hour period. It provides productivity quantities for tasks like concrete works with formwork, reinforcement, and pouring. Masonry rates are also included for tasks like solid and hollow blockwork at different thicknesses with pointing. Miscellaneous tasks like cutting, chasing, and block shifting are also listed with expected daily outputs.

Uploaded by

Raif
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

LABOR PRODUCTION RATES

8 HRS
Sr. No. ITEM PRODUCTIVITY LABOR
Unit Qty
CONCRETE WORKS Carpenter Steel Fixer Con Mason Helper

1 PCC below footings


a Formwork m2 40 1 1

b Concrete m 3
20 2 3
2 PCC below slab on grade

a Formwork m2 25 1 1

b Concrete m 3
40 2 3
3 Column footings / Pile Caps

a Formwork m2 30 2 2
b Reinforcement (fabrication & fix) kg 170 1

c Concrete m 3
55 2 2

4 Strip footings
a Formwork m2 25 2 2

b Reinforcement (fabrication & fix) kg 170 1


c Concrete m 3
55 2 2

5 Pedestals (Neck Columns)

a Formwork m2 25 2 1
b Reinforcement (fabrication & fix) kg 160 1

c Concrete m3 20 1 2
6 Tie Beams

a Formwork m2 30 2 1

b Reinforcement (fabrication & fix) kg 180 1


c Concrete m3 20 2 2

7 Slab on grade
a Formwork & Joints m2 of slab 200 2 1

b Mesh Reinforcement m 2
300 2

c Bar Reinforcement (fabrication & fix) kg 250 1


d Concrete - Trowel finished m3 40 2 3

8 Retaining Walls
a Formwork m2 30 3 1

b Reinforcement (fabrication & fix) kg 160 1

c Concrete m3 18 1 2
d De-Shuttering m 2

9 Shear Walls
a Formwork m2
b Reinforcement (fabrication & fix) kg

c Concrete m3
d De-Shuttering m2

10 Columns upto 0.5 sqm in area (using fabricated forms)


a Formwork m2 14 2 1

b Reinforcement (fabrication & fix) kg 160 1

c Concrete m3 9 1 2
d De-Shuttering m 2

Page 1 of 5
LABOR PRODUCTION RATES

8 HRS
Sr. No. ITEM PRODUCTIVITY LABOR
Unit Qty
CONCRETE WORKS Carpenter Steel Fixer Con Mason Helper
11 Beams

a Formwork m2 20 2 2
b Reinforcement (fabrication & fix) kg 160 1
c Concrete m3 15 1 2

d De-Shuttering m 2

12 Slabs (Solid)

a Formwork m2 15 1 1
b Reinforcement (fabrication & fix) kg 200 1
c Concrete m 3
75 3 3

d De-Shuttering m2
13 Slabs (Hourdy)

a Formwork m2
b Reinforcement (fabrication & fix) kg
c Concrete m3
d De-Shuttering m2
14 Parapets

a Formwork m2 20 2 2
b Reinforcement (fabrication & fix) kg 175 1
c Concrete m 3
12 1 1

15 Cantilevers
a Formwork m2 12 1 1

b Reinforcement (fabrication & fix) kg 180 1


c Concrete m3 50 3 3
16 Stairs

a Formwork m2 15 1 1
b Reinforcement (fabrication & fix) kg 170 1

c Concrete m3 20 1 1
17 Ramps
a Formwork m2
b Reinforcement (fabrication & fix) kg
c Concrete m3
18 Lintels
a Formwork m2 8 1 1
b Reinforcement (fabrication & fix) kg 180 1

c Concrete m 3
5 1 1

Page 2 of 5
LABOR PRODUCTION RATES

8 HRS
Sr. No. ITEM PRODUCTIVITY LABOR
Unit Qty
BLOCK WORK Block Mason Helper
Sub-Structure - Solid Blocks

1 200 mm Blockwork m2 12 1 1
Super-Structure (upto 3m height) - Solid Blocks
1 100 mm Blockwork with pointing m2 15 1 2

2 150 mm Blockwork with pointing m 2

3 200 mm Blockwork with pointing m2 10 1 2

4 250 mm Blockwork with pointing m2


Super-Structure (upto 3m height) - Hollow Blocks
1 250 mm Blockwork with pointing m2
2 200 mm Blockwork with pointing m2 16 1 2
3 200 mm blockwork in non-straight walls with pointing m2 12 1 2

4 150 mm Blockwork with pointing m 2

5 150 mm blockwork in non-straight walls with pointing m2


6 100 mm blockwork in straight walls with pointing m2 18 1 2

7 100 mm blockwork in non-straight walls with pointing m 2


14 1 2
Miscellaneous

1 Cover Block m2 9 1 1
2 Cutting & Chasing m 2

2 Block shifting GF to 3rd Floor No 240 1

PLASTER Plaster Mason Helper


1 Plastering Accessories fixing m2 60 1 1

2 Internal Plaster 12mm thick on walls m 2


16 1 1
3 Internal Plaster 12mm thick on ceilings m2 12 1 1
4 External Plaster 16mm thick (upto 3m high) m 2

5 External Plaster 16mm thick (over 3m high) m2


6 External Plaster 19mm thick (upto 3m high) m2 20 1 1

7 External Plaster 19mm thick (over 3m high) m2 18 1 1


8 External plaster -Rush coat m 2
100 1 1
9 Compressed Plaster m 2
60 1 1

10 Sub frame fixing No 5 1 1


11 Tyroline over plastered or fare face concrete surface m 2
175 1 1

Page 3 of 5
LABOR PRODUCTION RATES

8 HRS
Sr. No. ITEM PRODUCTIVITY LABOR
Unit Qty
TILING WORK Tiler Helper
1 Ceramic Floor Tiles m2 20 1 1

2 Ceramic Wall Tiles m 2


18 1 1
3 Ceramic Tile Skirting LM 40 1 1
4 Ceramic floor / wall tiles grouting m2 32 1 1

5 Ceramic claustra work m 2


6 1 1
6 Granite/Marble threshold No 10 1 1

7 Granite/Marble Floor Tiles m2 10 1 1


8 Granite/Marble Wall Tiles m 2

9 Terrazzo Tiles m2 20 1 1

10 Terrazzo Skirting LM 40 1 1
11 Terrazzo Treads & Risers LM 30 1 1

12 Floor Screed 50mm thick m 2


27 1 1
13 Interlocking Pavers m2 48 1 1
14 Kerbstone m 56 1 1

FALSE CEILING Ceiler Helper


1 Suspension System m 2
35 1 1

2 Ceiling Tiles m2 60 1 1
3 Gypsum Ceiling & Cornish (i/c Suspension System) m 2
2.5 1 1
4 Dry wall partition m 2
20 1 1

PAINT WORK Painter Helper


1 Prime Coat m2 200 1 1

2 Surface preparation for paint m 2


80 1
3 Paint 1st Coat - brush application (Emulsion Paint) m2 100 1 1
4 Paint 2nd Coat - brush application (Emulsion Paint) m 2
100 1 1

5 Paint 1st Coat - roller application (Emulsion paint) m 2


125 1 1
6 Paint 2nd Coat - roller application (Emulsion Paint) m2 125 1 1

7 Paint 1st Coat - brush application (Enamel Paint) m2 60 1 1


8 Paint 2nd Coat - brush application (Enamel Paint) m 2
60 1 1
9 Paint 1st Coat - roller application (Enamel Paint) m 2
95 1 1

10 Paint 2nd Coat - roller application (Enamel Paint) m2 70 1 1


11 Epoxy Paint on Floors per coat m 2
50 1 1

12 Bitumen paint for waterpoofing single coat m 2


50 1
13 Stucco Paint m2

Page 4 of 5
LABOR PRODUCTION RATES

8 HRS
Sr. No. ITEM PRODUCTIVITY LABOR
Unit Qty
WOOD WORKS Joiner Helper
1 Wooden frames fixing for openings upto 5 m 2 nos 8 2 1

2 Wooden door shutters fixing (incl hardware) nos 5 2 1


3 Wooden Pergola m 2

4 Wooden Vanities nos

5 Kitchen Cabinets nos


6 Wardrobes nos

7 Handrail LM

METAL WORKS Metal Workers Helper


1 Steel Frames fixing for openings upto 5 m 2
nos 8 1 1

2 Steel Shutter fixing nos 5 1 2


3 Handrail and Balustrade LM 8

4 Glazed Balustrade with Stainless steel handrail LM 6


5 Structural Steel Columns and Beams kg
6 Wardrobes nos

7 Passanger Lifts nos

ALUMINIUM WORKS Aluminium Workers

1 Aluminium doors for openings upto 5 m 2 nos 8 2


2 Aluminium windows (glazed) nos 6 2
3 Glazed Curtain Walling m 2

4 Aluminium Louvers nos


5 Aluminium Cladding m2
6 Skylights m2