Pre Pour Safety Inspection Checklist AR1/2020/TEC/031 - FR 01

The document is a pre-pour safety inspection checklist for an upcoming concrete pour. It lists safety checks to perform below the floor, above the floor, and in the surrounding area. Checks include ensuring shuttering support and props are secure, fall protection barriers and safety equipment are provided, walkways are clear, and communication equipment is available. Upon completion, the checklist must be signed off by the site engineer and environmental health and safety officer.

Uploaded by

Vikas Yamagar
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
136 views

Pre Pour Safety Inspection Checklist AR1/2020/TEC/031 - FR 01

The document is a pre-pour safety inspection checklist for an upcoming concrete pour. It lists safety checks to perform below the floor, above the floor, and in the surrounding area. Checks include ensuring shuttering support and props are secure, fall protection barriers and safety equipment are provided, walkways are clear, and communication equipment is available. Upon completion, the checklist must be signed off by the site engineer and environmental health and safety officer.

Uploaded by

Vikas Yamagar
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

Pre Pour Safety Inspection Checklist

AR1/2020/TEC/031 – FR 01

Area/Location: Date:-
Pour Card No:-
Casting of: - Slab / Wall / Column / …….

Sr. Description Yes No NA Remarks


No
A BELOW THE FLOOR
1. Are all support given to the shuttering for slab of adequate
strength and properly fixed and braced
2. Are all Props rests on the ground firmly?
3. Are all Props pin in place
4. Are all props straight?
5. Are edges of the slab properly barricaded?
6. Are an Adequate illumination has been ensured?
B ABOVE THE FLOOR
1 Are edges of the slab properly barricaded?
2 Has vertical Rebar (20mm) been inserted at every 2mtrs
minimum for edge protection?
3 Are the safety belt, Gumboot, etc available for the workers
engaged in the casting?
4 Is lighting arrangement proper?
C SURROUNDING AREA
1 Is approach to the Slab unobstructed and proper?
2 Is width of working platform properly maintained according
to usage?
3 Are opening in working platform kept safely covered/
fenced?
4 Is there provision of handrails?
5 Is there a provision of anchoring full body harness?
6 Are ladder providing access to the Slab securely fixed top
and bottom?
7 Are walkway/ aisles and workplaces cleared of loose
materials
8 Are route of the Concrete Pipe line clear, Is it supported at
enough places using proper stands, and Is it properly
clamped?
9 Is Walky-Talky available for the communication between
Pump Operator and person on the Slab?
10 Is ball catcher available to clear the blocked line?
11 Are safety nets provided wherever required?

Checked by Confirmed by

(Site Engineer) (EHSO)