This document provides specifications for high-temperature flexible reinforced air duct hoses. It outlines the scope, applicable documents, requirements, and classifications for hoses. Requirements include withstanding pressures and temperatures without leakage, rupture or deformation. Hoses must also meet interface, identification and environmental resistance specifications.

Uploaded by

jc
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
65 views

Source: Http://assist - Dla.mil - Downloaded: 2020-12-23T21:32Z Check The Source To Verify That This Is The Current Version Before Use

This document provides specifications for high-temperature flexible reinforced air duct hoses. It outlines the scope, applicable documents, requirements, and classifications for hoses. Requirements include withstanding pressures and temperatures without leakage, rupture or deformation. Hoses must also meet interface, identification and environmental resistance specifications.

Uploaded by

jc
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 12

INCH-POUND

MIL-PRF-62028D
14 December 2001
SUPERSEDING
MIL-PRF-62028C
26 August 1998

PERFORMANCE SPECIFICATION

HOSE, AIR DUCT: HIGH-TEMPERATURE


FLEXIBLE, REINFORCED

This specification is approved for use by all Departments and Agencies of the Department
of Defense.

1. SCOPE

1.1 Scope. This specification covers reinforced flexible hose used for transferring heat to
crew compartments and preheating engine compartments, oil pans, batteries, fuel and coolant
lines, and other components to assist in starting engines under extreme cold weather conditions
(see 6.1).

1.2 Classification. The hose is classified as follows (see 6.2 and 6.3).

1.2.1 Types. The types of hoses are as follows:

Type I Low working pressure


Type II Medium working pressure

1.2.2 Classes. The classes of hoses are as follows:

Class 1 Operating temperature range: -65 to +300 degrees Fahrenheit (°F).


Class 2 Operating temperature range: -65 to +450 °F.
Class 3 Operating temperature range: -65 to +600 °F.

Beneficial comments (recommendations, additions, deletions) and any pertinent data which may
be of use in improving this document should be addressed to: U.S. Army Tank-automotive and
Armaments Command, ATTN: AMSTA-TR-E/AEIT, Warren, MI 48397-5000, by using the
Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of this
document or by letter.
AMSC N/A FSC 4720
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

Source: http://assist.dla.mil -- Downloaded: 2020-12-23T21:32Z


Check the source to verify that this is the current version before use.
MIL-PRF-62028D

2. APPLICABLE DOCUMENTS

2.1 General. The documents listed in this section are specified in sections 3 and 4 of this
specification. This section does not include documents in other sections of this specification or
recommended for additional information or as examples. While every effort has been made to
ensure the completeness of this list, document users are cautioned that they must meet all
specified requirement documents cited in sections 3 and 4 of this specification, whether or not
they are listed.

2.2 Non-Government publications. The following document(s) form a part of this


document to the extent specified herein. Unless otherwise specified, the issues of the documents
which are DoD adopted are those listed in the issue of the DoDISS cited in the solicitation.
Unless otherwise specified, the issues of documents not listed in the DoDISS are the issue of the
documents cited in the solicitation (see 6.2).

AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)

ASTM D380 - Rubber Hose (DoD Adopted).


ASTM D1171 - Standard Test Method for Rubber Deterioration - Surface
Ozone Cracking Outdoors or Chamber (Triangular
Specimens) (DoD Adopted).
ASTM G21 - Standard Practice for Determining Resistance of Synthetic
Polymeric Materials to Fungi (DoD Adopted).

(Application for copies should be addressed to the American Society for Testing and
Materials, 100 Barr Harbor Drive, West Conshohocken, PA 19428-2959.)

2.3 Order of precedence. In the event of a conflict between the text of this document and
the references cited herein, the text of this document takes precedence. Nothing in this document,
however, supersedes applicable laws and regulations unless a specific exemption has been
obtained.

3. REQUIREMENTS

3.1 First article. When specified (see 6.2 and 6.4), a sample shall be subjected to first
article inspection in accordance with (IAW) 4.1.1.

3.2 Design, materials, and manufacturing processes. The design, materials, and
manufacturing process selection is the prerogative of the contractor as long as all articles
submitted to the Government fully meet the operating, interface, support and ownership, and
operating environment requirements specified.

Source: http://assist.dla.mil -- Downloaded: 2020-12-23T21:32Z


Check the source to verify that this is the current version before use.
MIL-PRF-62028D

3.2.1 Recycled, recovered, or environmentally preferable materials. Recycled, recovered,


or environmentally preferable materials should be used to the maximum extent possible provided
that the material meets or exceeds the operational and maintenance requirements, and promotes
economically advantageous life cycle costs.

3.3 Operating requirements. Each hose shall provide the following functional,
operational, and performance requirements as specified in 3.3.1 through 3.3.5.

3.3.1 Leakage. The hose shall not leak air at a rate of more than 0.02 cubic feet per
minute (ft3/min), per inch (in.) of inside diameter (ID), per foot (ft) of length, at the applicable
maximum positive working pressure specified in table I.

TABLE I. Working pressure requirements.


Working pressure,
pounds per square inch gage (psig)
Hose ID, in. Type I Type II
Minimum Maximum
(min.) (max.) Negative Positive Negative Positive
0.50 3.00 -5.0 5.0 -5.0 16.0
3.01 4.00 -2.0 4.0 -2.0 12.0
4.01 5.00 -1.0 3.0 -1.0 10.0
5.01 6.00 -0.5 2.5 -0.5 8.0

3.3.2 Proof and burst pressures. The hose shall withstand the applicable proof and burst
pressures specified in table II without rupturing.

TABLE II. Proof and burst pressure requirements.


Hose ID, in. Proof pressure, psig Burst pressure, psig
Min. Max. Type I Type II Type I Type II
0.50 3.00 10.0 32.0 20.0 64.0
3.01 4.00 8.0 24.0 16.0 48.0
4.01 5.00 6.0 20.0 12.0 40.0
5.01 6.00 5.0 16.0 10.0 32.0

3.3.3 Vacuum resistance. While curved to a radius equal to five times the outside
diameter (OD) of the hose, the hose shall withstand a vacuum of 10 in. of mercury without the
OD being reduced more than 5 percent (%), or without the ID collapsing or separating from the
balance of the hose structure.

Source: http://assist.dla.mil -- Downloaded: 2020-12-23T21:32Z


Check the source to verify that this is the current version before use.
MIL-PRF-62028D

3.3.4 Flexibility. The hose shall withstand a bending of 180 degrees (°) on four points
spaced 90° apart, around a rigid cylinder with a diameter equal to the ID of the hose, without
permanent kinking, flattening, fracture, or deformation in excess of 2%.

3.3.5 Collapsing resistance. The hose shall withstand a minimum load of 50 pounds (lb),
gradually administered within a time period of 15 seconds maximum. The 50-lb load shall be
applied perpendicular to the axis of the hose for a minimum of 5 minutes, without permanent
setting, distortion, or deformation in excess of 5%.

3.4 Interface requirements. Each hose shall accommodate the interface requirements as
specified in 3.4.1 and 3.4.2.

3.4.1 Envelope and interface dimensions. The overall envelope and interface dimensions
shall be as specified on the interface drawing(s) (see 6.2).

3.4.2 Interchangeability. All hoses shall be interchangeable with parts of other


manufacturers having the same military part number.

3.5 Support and ownership requirement. Unless otherwise specified (see 6.2),
identification marking shall be permanent, legible, and shall include as minimum the following:

a. Nomenclature “HOSE, AIR DUCT”.


b. Military part number.
c. Manufacturer’s brand or firm name, or CAGE number.
d. Manufacturer’s serial number.
e. Date of manufacture (month and year).
f. Contract or order number.
g. Symbol “US”.

3.6 Operating environment requirements. Each hose shall operate under the following
environmental conditions as specified in 3.6.1 through 3.6.5, and with the exception of 3.6.5, shall
subsequently meet the performance requirements of 3.3.1 and 3.3.2.

3.6.1 High temperature resistance. The hose shall not crack, break or become brittle
when subjected to the applicable maximum temperature for its class (see 1.2.2).

3.6.2 Low temperature resistance. The hose shall not crack, break or delaminate when
subjected to temperatures down to -65°F.

3.6.3 Vibration resistance. The hose shall not crack, break or delaminate when subjected
to a constant 0.060-in. double-amplitude vibration, at a frequency cycled between 10 and 55 hertz
(Hz) in one-minute cycles, applied both parallel and perpendicular to the hose axis for a minimum
of 50 hours in each direction.

Source: http://assist.dla.mil -- Downloaded: 2020-12-23T21:32Z


Check the source to verify that this is the current version before use.
MIL-PRF-62028D

3.6.4 Fungus resistance. The hose shall show no evidence of fungal growth when
subjected to environments conducive to spore germination and growth (air temperature between
35 and 100°F and relative humidity between 60 and 100%).

3.6.5 Ozone resistance. The hose shall not crack or break when subjected to a minimum
of 72 hours of ozone exposure at 104 ± 2°F, with a partial ozone pressure of 50 ± 5 millipascals
(mPa).

4. VERIFICATION

4.1 Classification of inspection. The inspection conditions specified herein are classified
as follows:

a. First article inspection (see 4.1.1).


b. Conformance inspection (see 4.1.2).

4.1.1 First article inspection. First article inspection shall be performed on the first nine
production-representative units of an order when a first article sample is required (see 3.1).
Inspection shall include all the verifications listed in table III and shall be in the order as specified
in table IV.

TABLE III Verification methods.


Title Requirement Verification
Operating requirements 3.3 4.3.3
Leakage 3.3.1 4.3.3.1
Proof & burst pressures 3.3.2 4.3.3.2
Vacuum resistance 3.3.3 4.3.3.3
Flexibility 3.3.4 4.3.3.4
Collapsing resistance 3.3.5 4.3.3.5
Interface requirements 3.4 4.3.4
Envelope and interface dimensions 3.4.1 4.3.4.1
Interchangeability 3.4.2 4.3.4.2
Support and ownership requirement 3.5 4.3.5
Operating environment requirements 3.6 4.3.6
High temperature resistance 3.6.1 4.3.6.1
Low temperature resistance 3.6.2 4.3.6.2
Vibration resistance 3.6.3 4.3.6.3
Fungus resistance 3.6.4 4.3.6.4
Ozone resistance 3.6.5 4.3.6.5

Source: http://assist.dla.mil -- Downloaded: 2020-12-23T21:32Z


Check the source to verify that this is the current version before use.
MIL-PRF-62028D

4.1.2 Conformance inspection. Conformance inspection shall include the verifications as


specified in table III as defined in the contractual sampling plan (see 6.2 and 6.5).

4.2 Order of inspection. First article inspection sequence shall be as specified in table IV.
Other testing may be in any order except that the environmental requirements verifications
(see 4.3.6) shall precede the leakage test (see 4.3.3.1) and the proof and burst pressure tests
(see 4.3.3.2).

TABLE IV. Order of first article inspection.


Sample number Title
1 Flexibility
Collapsing resistance

2 Low temperature resistance


Leakage
Proof & burst pressures

3 High temperature resistance


Leakage
Proof & burst pressures

4 Envelope and interface dimensions


Interchangeability
Support and ownership
Vacuum resistance

5 Vibration resistance
Leakage
Proof & burst pressures

6, 7, 8 Fungus resistance
Leakage
Proof & burst pressures

9 Ozone resistance

4.3 Verification methods. The types of verification methods included in this section are
visual, inspection, measurement, sample tests, full-scale demonstration tests, simulation,
modeling, engineering evaluation, component properties analysis, and similarity to previously
approved or previously qualified designs.

Source: http://assist.dla.mil -- Downloaded: 2020-12-23T21:32Z


Check the source to verify that this is the current version before use.
MIL-PRF-62028D

4.3.1 Verification alternatives. The manufacturer may propose alternative test methods,
techniques, or equipment, including the application of statistical process control, tool control, or
cost-effective sampling procedures, to verify performance. See the contract for alternatives that
replace verifications required by this specification.

4.3.2 Inspection conditions. Unless otherwise specified (see 6.2), all inspections shall be
conducted under the following conditions:

a. Air temperature: 77 + 10°F


b. Barometric pressure: 28.5 (+2,-3) in. mercury.
c. Relative humidity: 50 + 30%.

4.3.3 Operating requirements verifications. Complete each verification under 4.3.3.

4.3.3.1 Leakage. The hose shall be pressurized with air to the maximum working
pressure as specified in table I for a period of 1 minute. A leakage rate greater than 0.02 ft3/min,
per in. of inside diameter (ID), per ft of length shall constitute failure of this test.

4.3.3.2 Proof and burst pressures. The hose shall be tested IAW ASTM D380 at the
proof and burst pressures specified in table II. A rupture of the hose shall constitute failure of this
test.

4.3.3.3 Vacuum resistance. A 36-in. length of hose shall be assembled with end
couplings. One end shall be closed in such a manner as to prevent leakage of air, and the other
end shall be connected to a vacuum pump. The hose shall then be subjected to a vacuum of 10 in.
of mercury while curved to a radius equal to five times the OD of the hose for a period of
5 minutes. Subsequent to testing, a reduction of the hose OD greater than 5%, or a collapsed or
separated hose ID, shall constitute failure of this test.

4.3.3.4 Flexibility. The hose shall be marked at four points spaced 90° apart around the
external perimeter. The hose shall then be bent successively on each of the four marked points at
180° around a rigid cylinder with a diameter equal to the ID of the hose. Subsequent to testing,
evidence of permanent kinking, flattening, fracturing, or deformation in excess of 2% shall
constitute failure of this test.

4.3.3.5 Collapsing resistance. A 6-in. longitudinal section of a 36-in. test specimen shall
be subjected to a load of 50 lb minimum, applied within 15 seconds. The load shall be applied
perpendicular to the hose axis for a period of at least 5 minutes. When the load is removed,
evidence of permanent setting, distortion, or deformation in excess of 5% shall constitute failure
of this test.

Source: http://assist.dla.mil -- Downloaded: 2020-12-23T21:32Z


Check the source to verify that this is the current version before use.
MIL-PRF-62028D

4.3.4 Interface requirements verification. Complete each verification under 4.3.4.

4.3.4.1 Envelope and interface dimensions. Use one or more of the methods outlined in
4.3.1 to verify that the envelope and interface dimensions are IAW applicable drawings (see 6.2).

4.3.4.2 Interchangeability. Use one or more of the methods outlined in 4.3.1 to verify
that interchangeability between different assemblies having the same military part number is
assured.

4.3.5 Support and ownership requirements verification. Unless otherwise specified


(see 6.2), visually verify that the hose is permanently and legibly marked with the following
information:

a. Nomenclature “HOSE, AIR DUCT”.


b. Military part number.
c. Manufacturer’s brand or firm name, or CAGE number.
d. Manufacturer’s serial number.
e. Date of manufacture (month and year).
f. Contract or order number.
g. Symbol “US”.

4.3.6 Operating environment requirements verification. Complete each verification under


4.3.6.

4.3.6.1 High temperature resistance. The hose shall be subjected to an internal flow of air
at the applicable maximum temperature for its class (see 1.2.2). The air flow shall be maintained
for a period of 72 hours with the ambient temperature at room temperature. Subsequent to
testing, evidence of brittle material, cracks, or breaks shall constitute failure of this test.

4.3.6.2 Low temperature resistance. The hose shall be tested IAW ASTM D380 at a
temperature of -65°F. Subsequent to testing, evidence of delamination, cracks, or breaks shall
constitute failure of this test.

4.3.6.3 Vibration resistance. The hose shall be subjected to a constantly-applied


vibration, with a double amplitude of 0.060 in. and a frequency cycled between 10 and 55 Hz in
one-minute cycles. The vibration shall be parallel to the hose axis for 50 hours, and then
perpendicular to the hose axis for another 50 hours. Subsequent to testing, evidence of
delamination, cracks, or breaks shall constitute failure of this test.

4.3.6.4 Fungus resistance. The hose shall be tested IAW ASTM G21. Evidence of
fungal growth shall constitute failure of this test. For first article testing, sample number 6 shall
be tested for 30 days, number 7 for 60 days, and number 8 for 90 days. At the completion of the

Source: http://assist.dla.mil -- Downloaded: 2020-12-23T21:32Z


Check the source to verify that this is the current version before use.
MIL-PRF-62028D

90-day test, sample number 8 shall be subjected to, and pass, the tests as specified in 4.3.3.1 and
4.3.3.2.

4.3.6.5 Ozone resistance. The hose shall be subjected to the applicable test as specified in
ASTM D1171. Subsequent to testing, evidence of cracks or breaks shall constitute failure of this
test.

5. PACKAGING

5.1 Packaging. For acquisition purposes, the packaging requirements shall be as specified
in the contract or order (see 6.2). When actual packaging of material is to be performed by DoD
personnel, these personnel need to contact the responsible packaging activity to ascertain requisite
packaging requirements. Packaging requirements are maintained by the Inventory Control Point’s
packaging activity within the Military Department of Defense Agency, or within the Military
Department’s System Command. Packaging data retrieval is available from the managing Military
Department’s or Defense Agency’s automated packaging files, CD-ROM products, or by
contacting the responsible packaging activity.

6. NOTES

(This section contains information of a general or explanatory nature that may be helpful,
but is not mandatory.)

6.1 Intended use. The hose covered by this specification is intended for use in
heat-transfer applications in military vehicles. The hoses covered by this specification are military
unique because they must be able to operate satisfactorily at ambient temperatures ranging from -
65oF to +600oF. Commercial components are not designed to withstand such extreme
environmental conditions and would experience failure.

6.2 Acquisition requirements. Acquisition documents should specify the following:

a. Title, number, and date of this specification.


b. Type and class of the hose required (see 1.2).
c. Issue of DoDISS to be cited in the solicitation, and if required, the specific issue of
individual documents referenced (see 2.2).
d. If first article inspection is required (see 3.1 and 6.4).
e. Specification of interface drawing(s) (see 3.4.1 and 4.3.4).
f. If identification marking is other than as specified (see 3.5 and 4.3.5).
g. Specification of contractual sampling plan (see 4.1.2 and 6.5).
h. If inspection conditions are other than as specified (see 4.3.2).
i. Packaging requirements (see 5.1).
j. Part or identifying number (see 6.3).

Source: http://assist.dla.mil -- Downloaded: 2020-12-23T21:32Z


Check the source to verify that this is the current version before use.
MIL-PRF-62028D

6.3 Part or Identifying Number (PIN). The PINs to be used for hoses acquired to this
specification are created as follows:

M 62028 X X XX XX XX

Length in inches
OD in 1/16 of an inch
ID in 1/16 of an inch
Class (see 1.2.2)
Type (see 1.2.1)
Specification number
Prefix

Example: M6202823010572

Signifies: Type II, class 3, ID = 1/16 in., OD = 5/16 in., length = 72 in.

6.4 First article. When requiring a first article inspection, contracting documents should
provide specific guidance to offerors. This guidance should cover whether the first article is a
first article sample, a first production item, or the number of test items. These documents should
also include specific instructions regarding arrangements for examinations, approval of first article
test results, and disposition of first articles. Pre-solicitation documents should provide
Government waiver rights for samples for first article inspection to bidders offering a previously
acquired or tested product. Bidders offering such products who wish to rely on such production
testing must furnish evidence with the bid that prior Government approval is appropriate for the
pending contract.

6.5 Conformance inspection. Affordable conformance inspection with confidence varies


depending upon a number of procurement risk factors. Some of these factors include: Contractor
past performance, government schedules and budget, product material and design maturity,
manufacturing capital equipment and processes applied, the controlled uniformity of those
processes applied, labor skill and training, and the uniformity of measuring processes and
techniques. During the solicitation, contracting documents should indicate those tests desired
from table III and their designated frequency based on a risk assessment for the procurement.

10

Source: http://assist.dla.mil -- Downloaded: 2020-12-23T21:32Z


Check the source to verify that this is the current version before use.
MIL-PRF-62028D

6.6 Subject term (key word) listing.

Crew compartments
Engine compartments
Heat transfer
Preheating

6.7 Changes from previous issue. Marginal notations are not used in this revision to
identify changes with respect to the previous issue due to the extent of the changes.

Custodians: Preparing Activity:


Army - AT Army - AT
DLA - CC
(Project 4720-0317)

11

Source: http://assist.dla.mil -- Downloaded: 2020-12-23T21:32Z


Check the source to verify that this is the current version before use.
STANDARDIZATION DOCUMENT IMPROVEMENT PROPOSAL

INSTRUCTIONS
1. The preparing activity must complete blocks 1, 2, 3, and 8. In block 1, both the document number and revision letter
should be given.
2. The submitter of this form must complete blocks 4, 5, 6, and 7, and send to preparing activity.
3. The preparing activity must provide a reply within 30 days from receipt of the form.
NOTE: This form may not be used to request copies of documents, nor to request waivers, or clarification of
requirements on current contracts. Comments submitted on this form do not constitute or imply authorization to waive
any portion of the referenced document(s) or to amend contractual requirements.

1. DOCUMENT NUMBER 2. DOCUMENT DATE (YYYYMMDD)


I RECOMMEND A CHANGE: MIL-PRF-62068D 20011214
3. DOCUMENT TITLE
HOSE, AIR DUCT: HIGH-TEMPERATURE FLEXIBLE, REINFORCED
4. NATURE OF CHANGE (Identify paragraph number and include proposed rewrite, if possible. Attach extra sheets as needed.)

HOSE, AIR DUCT: HI HOSE, AIR DUCT: HIGH-TEMPERATURE

5. REASON FOR RECOMMENDATION

6. SUBMITTER
a. NAME (Last, First, Middle Initial) b. ORGANIZATION

c. ADDRESS (Include Zip Code) d. TELEPHONE (Include Area Code) 7. DATE SUBMITTED
(1) Commercial (YYYYMMDD)
(2) DSN
(If applicable)
8. PREPARING ACTIVITY
a. NAME b. TELEPHONE (Include Area Code)
(1) Commercial (2) DSN
(586) 574-8745 786-8745
c. ADDRESS (Include Zip Code) IF YOU DO NOT RECEIVE A REPLY WITHIN 45 DAYS, CONTACT:
Commander Defense Standardization Program Office (DLSC-LM)
U.S. Army Tank-automotive and Armaments Command 8725 John J. Kingman Road, Suite 2533
ATTN: AMSTA-TR-E/AEIT Fort Belvoir, Virginia 22060-6221
6501 E. 11 MILE ROAD Telephone (703) 767-6888 DSN 427-6888
Warren, MI 48397-5000
DD FORM 1426, FEB 1999 (EG) Source: http://assist.dla.mil
PREVIOUS--EDITION
Downloaded: 2020-12-23T21:32Z
IS OBSOLETE. WHS/DIOR, Feb 99
Check the source to verify that this is the current version before use.

You might also like