1. Culvert C19 of the Second Trunk Road A5 project has a design discharge of 2.75 m3/s and tailwater elevation of 2.46 m RL for a 50-year ARI design storm.
2. Culvert C19 is a twin box culvert with a size of 1.5 m width and 1.77 m2 area, and a headwall square edge entrance.
3. Hydraulic computations show the allowable headwater is 1.29 m, controlled by the outlet control condition.
Download as XLS, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
49 views
Culvert Calculation
1. Culvert C19 of the Second Trunk Road A5 project has a design discharge of 2.75 m3/s and tailwater elevation of 2.46 m RL for a 50-year ARI design storm.
2. Culvert C19 is a twin box culvert with a size of 1.5 m width and 1.77 m2 area, and a headwall square edge entrance.
3. Hydraulic computations show the allowable headwater is 1.29 m, controlled by the outlet control condition.
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 5
PROJECT : Second Trunk Road A5
JOB NO : 21801
CULVERT NO. : C19
HYDROLOGICAL AND CHANNEL INFORMATION SKETCH
HW allowable = 3.68 m RL Tailwater = Design Storm Return Period = 50 -Year ARI Design Discharge, Qd = 2.75 m3/s HWallowable = 1.92 m Tailwater, TW = 2.46 m RL IL = 1.76 m Allowable Headwater, HW = 3.68 m RL Mean Stream Velocity, Vmean = m/s Max Stream Velocity, Vmax = m/s Check Discharge, Qc = m3/s So = 0.0033 L= 15.00 Headwater Computation Controlling Culvert Description Q Q/n Size Size Area Inlet Control Outlet Control HWo = H + ho - LSo HW n (Entrance Type) (m3/s) (m3/s) (m) B (m) D (m2) A HW Hwi/D i Ke H hc (hc+D)/2 TW ho LSo HWo (m) Twin Box Culvert 2.75 1.00 2.75 1.50 1.77 0.84 1.26 0.50 0.20 0.78 1.14 0.75 1.14 0.05 1.29 1.29 (Headwall with square edge)
Summary and Recommendations :
Designed by : Date : TW = 0.75 m Tailwater = 2.46 m RL