UPS Failure

This work instruction provides guidance for safely shutting down a unit in the event of a Stage II 240V UPS supply failure at a power plant. It outlines the consequences of such a failure, including the tripping of the turbine, generator, and other equipment. It assigns responsibility for following the procedure to unit controllers and desk engineers. The procedure details actions to be taken like ensuring the start of backup equipment and informing other departments to restore the UPS power as soon as possible.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
116 views

UPS Failure

This work instruction provides guidance for safely shutting down a unit in the event of a Stage II 240V UPS supply failure at a power plant. It outlines the consequences of such a failure, including the tripping of the turbine, generator, and other equipment. It assigns responsibility for following the procedure to unit controllers and desk engineers. The procedure details actions to be taken like ensuring the start of backup equipment and informing other departments to restore the UPS power as soon as possible.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

NTPC WORK INSTRUCTION VSTPS

Title : Work Instruction for handling Stage II (U#7 & U#8)


Total 240V UPS supply failure
Ref. No. : OPN / UNIT / WI Page 2 of 2
Issue No. : 01 Revision No. : 00 Date : 28-12-2014

1.0 PURPOSE: This work instruction is applicable to stage II (2x500) units.


2.0 SCOPE: It covers the safe shut down of the unit.
3.0 RESPONSIBILITY: Unit controller and desk engineers are responsible for the compliance of
this work instruction. The concerned executives execute the work as per the procedure laid down
in consultation with SCE, CSCE and General Shift executives.

4.0 PROCEDURE DETAILS:

CONSEQUENCES OF 240 VOLT UPS SUPPLY FAILURE:-

1.0 All HMI supplies from main UPS will not be available but from battery supply will be available
for around 2 hours.
2.0 Scanner panel power supply will trip and immediately scanner will sense no Flame in the Boiler.
3.0 Unit will trip on flame failure protection. Turbine trips on MFT & Generator will trip on Low Forward
Power protection.
4.0 ID fans VFDs air flow relays and its control supply will be Lost and VFD will trip.
5.0 APH Air Motor will take auto start.
6.0 MDBFP scoop will become inoperative from remote.
7.0 All Drives vibration including the Turbine vibration data will not be available.
8.0 O2 analyzer data will not be available.

ACTIONS TO BE TAKEN DURING 240V UPS SUPPLY FAILURE:-

1.0 Ensure start of Turbine AOP at 2850 RPM.


2.0 Ensure start of JOP at 510 RPM.
3.0 Ensure opening of barring Gear at 210 rpm.
4.0 If possible Maintain Drum Level by operating MDBFP Scoop from local otherwise stop MDBFP
and BCWP pumps if its DP <0.9ksc.
5.0 H2 pressure seal oil system parameters to be monitored from local.
6.0 Inform C&I and EMD for restoration of UPS at the earliest.

Prepared by Reviewed by Approved by

Signature:

Name:

Designation :