Subjects: Check List of Quality Control of Damage Assessment Report of PEA

This document is a checklist for quality control of a damage assessment report for a university laboratory school and college building. It contains sections evaluating the reports, non-destructive test results, drawings, and identifies any contradictions or missing information. Key points of the evaluation include compatibility between reports and checklists, identification of lateral load resisting systems and building irregularities, reporting of short columns and material details, testing of an appropriate percentage of columns and compatibility of test results.

Uploaded by

salman arafat
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views4 pages

Subjects: Check List of Quality Control of Damage Assessment Report of PEA

This document is a checklist for quality control of a damage assessment report for a university laboratory school and college building. It contains sections evaluating the reports, non-destructive test results, drawings, and identifies any contradictions or missing information. Key points of the evaluation include compatibility between reports and checklists, identification of lateral load resisting systems and building irregularities, reporting of short columns and material details, testing of an appropriate percentage of columns and compatibility of test results.

Uploaded by

salman arafat
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Check List of Quality Control of Damage Assessment Report of PEA

Name [University Labratory School and College] [4677271930] [29.06.2020]

Assessment Results : (by QC JV) Flag Type

No. Subjects Type of Results Results


of of
Comments QC-Ausp. QC-JV Remarks
1 Reports

All folders are provided.


7-Reports of tests results
1-Checklists 8- Existing documents,
2-photos 9- of online Monitoring
1-1 Minor Not Available online monitoring video
3- Damage Assessment report,
4-sketches,
5 ,6- As built AR & ST drawings,

1-2 Structural and architectural drawings are presented in the report in the pdf format. Minor

1-3 The compatibility between the damage assessment report and checklist is admirable. Major

1-4 The lateral bearing system has been correctly identified. Major MRF

1-5 The irregularity identification of building is correctly identified. Minor Regular

1-6 The separation joint are clearly identified and presented in the report. Major N/A

1-7 The distance to the adjacent building is clearly reported Major N/A

1-8 Short columns are reported. Major Short columns observed

1-9 The material and detail (Common detail) of floor finishing are provided in the report. Major NCF, Tiles, Mosaic

1-10 Dimension and connection type of lintels are provided in the report. Major
Results Results
Type of
2 Results of NDT tests and Survey Comments
of of Remarks
QC-Ausp. QC-JV

2-1 It is confirmed that about 20% of columns have been tested. Minor N.O of tests: 6. Total N.O of columns:29

The compatibility between the results of UV and SH tests are proper .


2-2
When the difference between the results of SH and UPV are less than 20% the smaller one , the Major Ave SH=23.52 MPa , Ave UPV=22.94 MPa
answer is yes. Otherwise convincing justification should be mentioned in the report.
A <= 20% (B-A) --> Yes

2-3
The estimation mean and standard deviation results of compressive strength of concrete should be Minor Sd SH=7.4206 Sd UPV=1.3467
provided.

2-4 The locations and distribution of columns tested are clearly presented. Major Location Present at NDT test report

2-5 For the masonry cases, the shear strength of mortar is reported. Major Shear Strength: (N/A)

2-6
If the structure have ol irregularities such as geometric irregularities, soft story, weak story Major N/A
even the structure was constructed in different phases all floors shall be surveyed.
Type of Results Results
3 Drawings of of
Comments QC-Ausp. QC-JV Remarks

3-1 Architectural and Structural drawings are compatible.


Major
3-2 The lintel type and its connection to the columns are presented. Major

3-3
The type, thickness and connection of masonry walls are presented in the report and
drawings. Major
Interior walls:125 mm , Exterior walls= 125 mm

3-4 The arrangement of longitudinal reinforcements is correctly reported. Major


shape and dimensions shoub be compatible.

3-5 The tie arrangement along the height of column is clearly presented. Major

3-6 The separation joint are clearly identified and presented in drawings. N/A
Major

3-7 The distance to the adjacent building is clearly presented in site plan. N/A
Major
3-8 The locations of damages of columns and walls are presented. Major
3-9 The estimation of top of foundation level is presented. Major NA
3-10 The bottom and top of all windows and doors are presented in the drawings. Minor
3-11 All lintels are demonstrated in the drawings. Major
3-12 The common details of stair are presented in the drawings. Major
3-13 The Type of all ceilings is presented clearly in AR and ST drawings Major
Concrete ceiling

3-14 The number of bays and columns are compatible in AR and ST drawings Major
Number of bays should be written here .8

3-15
The height of floor is presented correctly in AR and ST drawings Major
In the AR drawings, the following items are
presented:
- Location of buildings
- Expansion Joint - Story Height
- Room Function - Wall type
3-16
- Slab Covering - Dimension of Windows and doors Major
- Any extraordinary equipment and heavy equipment - Stair
should be identified in furniture plans. - Any re-entrant and setback shall be presented
in the drawings.
-- If the functions (usage) of floors are different,
it shall be clarified in the drawings.

The AR drawings consists of :


- Site Plan
3-17 - Dimension and Furniture Plans of floors Major
- Two sections
- All facades
4 Contradictions (Filled by QC JV)
1

5 Missing Information (Filled by QC JV)