0% found this document useful (0 votes)
105 views

Projects by Techworx Industrial Services

The document lists several projects completed or ongoing by TECHWORX Industrial Services for various clients in Saudi Arabia. The projects involve installation, testing, commissioning, upgrading, and repair work of substation equipment including switchgear, protection systems, transformers and circuit breakers. TECHWORX provides services for power utilities, industrial plants, and other clients to maintain and improve electric power infrastructure.

Uploaded by

ashraf
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
105 views

Projects by Techworx Industrial Services

The document lists several projects completed or ongoing by TECHWORX Industrial Services for various clients in Saudi Arabia. The projects involve installation, testing, commissioning, upgrading, and repair work of substation equipment including switchgear, protection systems, transformers and circuit breakers. TECHWORX provides services for power utilities, industrial plants, and other clients to maintain and improve electric power infrastructure.

Uploaded by

ashraf
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

1

Projects by TECHWORX Industrial Services


Project Client Contact Person Status Detail
Installation of Two (2) Saudi Edrak -- Completed - Testing of O/C Relays (Mfr: ABB, Model: REF615)
MetalClad Switchgear Contracting 2015 - Testing of Power Meter (Mfr: Integra, Model:
13.8kV 1250V in SEC Co. Ltd. 1530)
SANG S/S - Testing of Trasducers, TRIAD2
- Mark-up Drawings of Two Metalclad Switchgear
13.8kV 1250A in SANG S/S

Upgrading of 115Kv Power Flow Mohammed Awny Completed - Upgrading and Testing of SCADA System
Protection at SEC Jisha & Contracting +966 569 27 82 80 2015 - Installation of 115Kv Protection Panels
Idwa Substations - Testing and Commissioning of 115Kv Surge
Arrestor and accessories.

Upgrading of Busbar Power Flow Mohammed Awny Completed - Upgrading and Testing of SCADA System
Protection and Contracting +966 569 278 280 2016 - Installation 380Kv Busbar Protection and
Transformer Protection 380/230Kv Transformer Protection panels.
at SEC Faras and
Shedgum Power Plant

Resolve the Frequent Saudi Murtadha Al-Sultan Completed - Re-engineering and design the station electrical
Electrical Interruptions at Irrigation +966 504 978 495 2017 scheme.
Station 25 in Al-Ahsa Organization - Re-habilitation of existing circuit breakers

Testing of Four (4) TAQQAT Khamis Shehata Completed To perform onsite testing of 4 nos. 13/20 MVA,
Transformers (13/20 A member of +966 581 064 442 2018 33/13.SKV Transformers (2 in RIYADH PP4, 1 in
MVA, 33/13.SKV) in Abdullah ALKHARJ, and 1 in ALQASSIM), that include
Central Area, Saudi Fouad Group Sweep Frequency Response Analysis (Finger print
Arabia test), Calibration of Transformer winding & oil
temperature gauges, Excitation Current Test, and
Record all the Test report of the Transformer.
2

Projects by TECHWORX Industrial Services


Project Client Contact Person Status Detail
Installation, Testing & FAST LINX Ali Al-Khalaf Completed - Complete Engineering & Design for new eight
Commissioning of Eight Trading & +966 504 837 715 2018 (4) Line protection panels.
(4) Line Protection Industrial - Dismantling of existing eight (4) protection
Panels for Mahasen - Supplies panels at four substations.
Hajer 115kV Line - Erection & installation of eight (4) new
protection panels and two (2) communication
converter panels (wall-mounted)
- Laying & termination of cables from new
installed panels to CTs, SCADA RTU, SOE, Ann.,
DFR, and DC panels.
- Testing & Commissioning (complete functional
tests) of installed equipment
Replacement of Three Saudi Murtadha Al-Sultan Completed - Dismantling of existing three (3) transformers
Transformers at Saudi Irrigation +966 504 978 495 2018 - Erection & installation of three (3) new
Irrigation Organization in Organization transformers (1000KVA, 13.8/400-270)
Al-Ahsa (Southern Area) - Installation of three (3) Manual Transfer Switch
- Laying and termination of 630MM2 cables
- Testing & Commissioning.
Installation, Testing & FAST LINX Ali Al-Khalaf Ongoing - Complete Engineering & Design for new eight
Commissioning of Eight Trading & +966 504 837 715 (4) Line protection panels.
(4) Line Protection Industrial - Dismantling of existing eight (4) protection
Panels Uthmaiyah – Supplies panels at four substations.
RWPS # 4 115kV Line - Erection & installation of eight (4) new
protection panels and two (2) communication
converter panels (wall-mounted)
- Laying & termination of cables from new
installed panels to CTs, SCADA RTU, SOE, Ann.,
DFR, and DC panels.
- Testing & Commissioning.
3

Projects by TECHWORX Industrial Services


Project Client Contact Person Status Detail
Major PM of Four (4) KAFOU Hussain Al-Shaikh Ongoing - Take oil samples and perform DGA and oil test
Main 13.8 KV/230KV Technical +966 504 974 048 as per ASTM standard.
133MVA Generators Services - Test and calibrate temperature indicators,
Transformers at Bucholz relays, sudden pressure relays, pressure
Shedgum Power Plant relief device etc and replace if defective.
- Inspect Conservator level gauges for Main tank
and OLTC. Inspect On-Load and Off –Load tap
changer parts, test tap changer by manual and
electrical operation, and replace any defective
parts. Test OLTC oil for healthiness. Replace oil
if required.
- perform the electrical test of the transformer
for Insulation resistance and PI of HV and LV
winding, Excitation current test, Resistance
measurement of HV and LV winding , Turns ratio
test at all tap positions, Insulation power factor
test for transformer windings and associated
bushings. Grounding Transformer, Neutral
grounding Resistors, Reactors.
Replacement of Three Saudi Murtadha Al-Sultan Ongoing - Dismantling of existing three (3) transformers
Transformers at Saudi Irrigation +966 504 978 495 - Erection & installation of three (3) new
Irrigation Organization in Organization transformers (1000KVA, 13.8/400-270)
Al-Ahsa (Northern Area) - Installation of three (3) Manual Transfer Switch
- Laying and termination of 630MM2 cables
- Testing & Commissioning.
4

Projects by TECHWORX Industrial Services


Project Client Contact Person Status Detail
Repair work for the KAFOU Hussain Al-Shaikh Ongoing - Remove the existing air circuit breaker (01) and
burned Air Circuit Technical +966 504 974 048 replace with brand new air circuit breaker (with
Breaker in MCC-2D at Services overcurrent relay) from SEC approved OEM’s.
SEC Qurayyah Power - All components in the Incomer ACB’s cubicle,
Plant Incomer ACB’s Protection cubical, Turning Oil
Pump ACB’s Cubicle, and Air Extraction
Vacuum Pump ACB’s cubical shall be replaced
by brand new components.
- Minor T&I shall be performed on all air circuit
breakers except the new replaced air circuit
breaker (total 5 breakers).
- Minor T&I shall be performed on all MCCB.

Corrective Maintenance KAFOU Hussain Al-Shaikh Ongoing - Pressure relief devices and OLTC main buchloz
(CM) Activities at SEC Technical +966 504 974 048 relay not operate the lock out relay for GSU #
Faras Power Plant Services 16
- Mechanical devices not operate the lock out
relay for GSU # 17
- Standing alarm in hydrant device for GSU # 17