Projects by Techworx Industrial Services
Projects by Techworx Industrial Services
Upgrading of 115Kv Power Flow Mohammed Awny Completed - Upgrading and Testing of SCADA System
Protection at SEC Jisha & Contracting +966 569 27 82 80 2015 - Installation of 115Kv Protection Panels
Idwa Substations - Testing and Commissioning of 115Kv Surge
Arrestor and accessories.
Upgrading of Busbar Power Flow Mohammed Awny Completed - Upgrading and Testing of SCADA System
Protection and Contracting +966 569 278 280 2016 - Installation 380Kv Busbar Protection and
Transformer Protection 380/230Kv Transformer Protection panels.
at SEC Faras and
Shedgum Power Plant
Resolve the Frequent Saudi Murtadha Al-Sultan Completed - Re-engineering and design the station electrical
Electrical Interruptions at Irrigation +966 504 978 495 2017 scheme.
Station 25 in Al-Ahsa Organization - Re-habilitation of existing circuit breakers
Testing of Four (4) TAQQAT Khamis Shehata Completed To perform onsite testing of 4 nos. 13/20 MVA,
Transformers (13/20 A member of +966 581 064 442 2018 33/13.SKV Transformers (2 in RIYADH PP4, 1 in
MVA, 33/13.SKV) in Abdullah ALKHARJ, and 1 in ALQASSIM), that include
Central Area, Saudi Fouad Group Sweep Frequency Response Analysis (Finger print
Arabia test), Calibration of Transformer winding & oil
temperature gauges, Excitation Current Test, and
Record all the Test report of the Transformer.
2
Corrective Maintenance KAFOU Hussain Al-Shaikh Ongoing - Pressure relief devices and OLTC main buchloz
(CM) Activities at SEC Technical +966 504 974 048 relay not operate the lock out relay for GSU #
Faras Power Plant Services 16
- Mechanical devices not operate the lock out
relay for GSU # 17
- Standing alarm in hydrant device for GSU # 17