Dynamic Cone Penetration Test: (Astm D-6951)

The DCP test was conducted at a location 9km from Depalpur, Pakpattan Sharif to Vehari Road to determine the soil properties of the sub-grade layer. The soil was identified as an "other soil" with 10% moisture content. Testing involved dropping an 8kg hammer from a height of 5cm at increasing depths and recording the number of blows and penetration. The CBR values ranged from 17.25% to 24.65% with higher values occurring at shallower depths with fewer blows required for penetration. A graph shows an inverse relationship between penetration rate and CBR value.

Uploaded by

Usman Ali
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
526 views

Dynamic Cone Penetration Test: (Astm D-6951)

The DCP test was conducted at a location 9km from Depalpur, Pakpattan Sharif to Vehari Road to determine the soil properties of the sub-grade layer. The soil was identified as an "other soil" with 10% moisture content. Testing involved dropping an 8kg hammer from a height of 5cm at increasing depths and recording the number of blows and penetration. The CBR values ranged from 17.25% to 24.65% with higher values occurring at shallower depths with fewer blows required for penetration. A graph shows an inverse relationship between penetration rate and CBR value.

Uploaded by

Usman Ali
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

DYNAMIC CONE PENETRATION TEST

(Astm D-6951)

Project:- DEPALPUR, PAKPATTAN SHARIF TO VEHARI ROAD.

Location: 9 KM L/S Dated: 18-12-2020.

Bh/Tp/Test #: 1 Layer: Sub-Grade

Soil Type: Other Soil Other Soil M.C% 10

Hammer Wt: 8 Kg Hammer Factor: 1

Accumulative
Depth of Accumulative Depth of
Number of Depth of C.B.R Value
Penetration Number of Penetration
Blows Penetration (%)
(cm) Blows mm/blows
(cm)
5 4 5 4 12.50 17.25
5 6 10 10 10.00 22.15
5 5 15 15 10.00 22.15
5 8 20 23 8.70 25.90
5 7 25 30 8.33 27.17
5 6 30 36 8.33 27.17
5 6 35 42 8.33 27.17
5 5 40 47 8.51 26.54
5 4 45 51 8.82 25.48
5 4 50 55 9.09 24.65
5 5 55 60 9.17 24.42
5 5 60 65 9.23 24.23

C.B.R Value % Vs No of Blows


30.00

25.00
C.B.R Value %

20.00

15.00

10.00

5.00

0.00
8.00 8.50 9.00 9.50 10.00 10.50 11.00 11.50 12.00 12.50 13.00

Depth of Penetration (mm/blows)

Tested By:- Checked By:-


5.00

0.00
8.00 8.50 9.00 9.50 10.00 10.50 11.00 11.50 12.00 12.50 13.00

Depth of Penetration (mm/blows)

Tested By:- Checked By:-


Condition for soil types

1 Other Soil
2
3
CL Soil (C.B.R < 10
CH Soil 1

Tested By:- Checked By:-