1. The document contains station-wise volume calculations for earthwork operations like fill and cut over a total station length of 1800. 2. It shows that the net volume of cut is 26042.3575 cubic meters. 3. The cost estimate for excavation, fill, sub-base, base course and surface works is presented which comes to a total of 434,722 Jordanian Dinars.

Uploaded by

Salah
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views

Excel Sheet For Cut & Fill

1. The document contains station-wise volume calculations for earthwork operations like fill and cut over a total station length of 1800. 2. It shows that the net volume of cut is 26042.3575 cubic meters. 3. The cost estimate for excavation, fill, sub-base, base course and surface works is presented which comes to a total of 434,722 Jordanian Dinars.

Uploaded by

Salah
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Station Area of Fill Area of Cut Volume of Fill Volume of 1.

15(Fill) Volume of Cut Comulative Fill Comulative Cut


0 357.91 0 0 0 0 0 0
180 153.625 0 46038.15 52944 0 52944 0
240 0.145 0 4613.1 5305 0 58249 0
420 0 1.215 13.05 15 109.35 58264 109
560 4.64 214.83 324.8 374 15123.15 58637 15233
640 59.76 0 2576 2962 8593.2 61600 23826
710 0 1.131 2091.6 2405 39.585 64005 23865
820 0 204.16 0 0 11291.005 64005 35156
980 0 20.93 0 0 18007.2 64005 53163
1150 1.15 0.613 97.75 112 1831.155 64118 54995
1400 104.23 0 13172.5 15148 76.625 79266 55071
1540 0.76 0.693 7349.3 8452 48.51 87718 55120
1640 0 37.5 38 44 1909.65 87761 57029
1800 0 21.12 0 0 4689.6 87761 61719
net volume= -26042.3575

Item unit quantity price (JD/Unit) Total Price (JD)


Fill m³ 87761 3 JD/m³ 263,284
cut m³ 61719 2 JD/m³ 123,438
sub base (15cm) m³ 3000 2 JD/m³ 6,000
base (10cm) m³ 2000 3 JD/m³ 6,000
prim coat Kg 30000 1 JD/Kg 30,000
surface HMA (5cm) m³ 1000 6 JD/m³ 6,000

Sum Of Total Price (JD) 434,722