33% found this document useful (3 votes)
2K views

1 - Training Activity Matrix

The document provides a training activity matrix for a dressmaking training program. Over 3 days, trainees will learn skills related to preparing materials, laying out and marking patterns, and cutting materials. Activities include orientation, presentations, demonstrations, practice, feedback, and assessments. Trainees will work individually and in groups. Facilities, tools, and equipment needed include computers, projectors, cutting tables, fabrics, patterns, tools, and work areas. The training will incorporate principles of competency-based training and be held in both classroom and practical work areas.

Uploaded by

Mashelet Valle
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
33% found this document useful (3 votes)
2K views

1 - Training Activity Matrix

The document provides a training activity matrix for a dressmaking training program. Over 3 days, trainees will learn skills related to preparing materials, laying out and marking patterns, and cutting materials. Activities include orientation, presentations, demonstrations, practice, feedback, and assessments. Trainees will work individually and in groups. Facilities, tools, and equipment needed include computers, projectors, cutting tables, fabrics, patterns, tools, and work areas. The training will incorporate principles of competency-based training and be held in both classroom and practical work areas.

Uploaded by

Mashelet Valle
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Training Activity Matrix

Dressmaking NC II

Facilities/T Venue Date


Training Activity Trainee ools and (Workstation & Remarks
Equipment / Area) Time
DAY 1

Prayer All E-media Contextual Day 1


Trainees Learning 8:00
Checking of attendance Attendance Area am –
sheet 08:30
Unfreezing activities am
RPL

1.Orientation Proper
a. Definition of CBT Laptop 8:30
b. 10 principles of CBT Projector Am-
c. Comparison between Amplifier 12:00
traditional and CBT Noon
d. Role of CBT trainer
e. Role of CBT trainee
f. Qualification overview
g. CBLM
H. workshop Tour
NOON BREAK
2. Pre-test All Pre- test Contextual 1:00
Trainees papers Learning Pm-
Area 1:30
pm
All Data Contextual 1:30
•Data Gathering and TNA trainees gathering Learning pm-
Instrument Area 2:00
pm

• Unfreezing activities All Training Contextual 2:00


•Rejoining?motivatio n trainees needs Learning Pm-
• Dressmaking NC II Analysis Area 3:30
overview pm

•Attendance/Groupings/
assignment of tools and
equipments
•Closing activities
•Wrap up/feedback
•Announcements
•Prayer
• 5’s All Cleaning Work Station 3:30-
trainees materials 4:00
pm
CORE Competencies: UC2 Prepare and cut pattern for casual apparel
LO1: Preparing materials(fabric)
DAY 2

All
•Prayer trainees Contextual 7:00
• Recap of Activities Learning Am-
motivation Area 7:10
1.Checking of Attendance Am
attendance Sheet 7:10
Am-
7:20
2. Distribution of CBLM Alagasi, am
W. 7:20
Apari, E. Am-
a.Read information sheet Broniola 8:55
2.1-1 Preparing the , R. am
fabric. Buac, C.
Cabuena
b. Answer self-check 2.1- s R.
1

c. Compare Answer with


answer key 2.1-1

3. Video presentation on Projector Contextual 8:55


preparing the fabric. Laptop Learning Am-
Amplifier Area 9:30
Speakers am
Microphone

All
Trainess

4. Perform the following Tape Practical 9:30


measure work area Am-
L-square 12:00
● Collect and check Calma,C Hip curve noon
fabric Cantiver French
● Standard fabric care os M. curve
●Prepare measuring tools Dolorica Pencil
and equipment for n,R. Pattern
cutting. Ebale,M. paper
Ebale,G. Cutting
tables
fabrics

LUNCH BREAK
12:00 nn - 1:00 pm
Prayer
All Contextual 1:00
1.checking attendance Trainees Attendance Learning pm
sheet Area 1:10
pm
2. validation of prior Gomid, Tape Institutional 1:10
Learning R. measure assessment Pm-
Jumamil L-square area 2:30
,K. Hip curve pm
Lauron, French
M. curve
Lumaya Pencil
g, C. Pattern
Manapo, paper
N. Cutting
tables
4. Feedbacking All Monitoring 2:30
Trainess tools Pm-
Achievemen 3:30
ts chart pm
Progress
chart
5. perform 5’s All Workshop 3:30
Trainess Station Pm-
4:00
pm
LO2: Lay out and mark pattern on materials
DAY 3

Prayer All E-media Practical


Trainees Work Area 7:00
Checking of attendance am -
9:00
Unfreezing activities am

Recap of Activities
Learning 9:00
●Set up cutting tables Calma,C Cutting Resource am -
●Prepare and check Cantiver tables Area 12:00
pattern os M. Tape nn
●Pattern layout on fabric Dolorica measure
●Markings on fabric. n,R. L-square
Ebale,M. Hip curve
Ebale,G French
curve
Pencil
Pattern
paper

LUNCH BREAK
12:00 nn - 1:00 pm
Prayer All
Trainees Attendance Contextual 1:00
1. checking of attendance sheet Learning pm -
Area 1:10
pm
2.Video Presentation Laptop 1:00
Projector Pm-
Amplifier 1:30
Pm

3. Perform Job sheet Tape


2.2-2 Prepare and check Gomid, measure Practical 1:30
pattern. R. L-square Work Area Pm-
Jumamil Hip curve 3:30
,K. French pm
Lauron, curve
M. Pencil
Lumaya Pattern
g, C. paper
Manapo, Procedure
N. manual
Tailors
chalk
Record
notebook

4. Perform 5’s All Workshop 3:30


Trainees Station pm -
4:00
pm
LO3: Cut Materials
Prayer
1. Checking of Attendance Contextual 8:00
Attendance sheet Learning Am-
Area 8:10
Gomid, R. Am
2. Read information Jumamil,K. CBLM
sheet# 2.3-1 Lauron, M. 8:10
Answer self check 2.3- Lumayag, Am
1 C. 8:45
Manapo, N. am
Compare answers with
answer key.
All Trainees Laptop Contextual 8:45
3. Video Presentation Projector Learning Am-
Amplifier Area 9:30
am
4. Perform Task sheet Calma,C Tape
on Cutting Ladies Cantiveros measure Practical 9:30
Blouse M. L-square work area Am-
Dolorican,R Hip curve 12:00
. French noon
Ebale,M. curve
Ebale,G Pencil
Pattern
paper
Procedure
manual
Tailors
chalk
Record
notebook

LUNCH BREAK
12:00-1:00
Prayer All trainees Contextual 1:00
1. checking of Attendance learning area pm-
attendance sheet 1:10
pm

Monitoring Practical 1:10


2. feedbacking tools work area pm –
3:30
pm
3. perform 5S All trainees Workshop 3:30
station pm-
4:00
pm

You might also like