This document provides specifications for plumbing plans and installations. It states that all plumbing work must meet national, local building and plumbing codes. Shop drawings must be submitted for approval before fabrication. Pipes must be installed as indicated on plans and relocations require prior approval. Slope for sewer branches must maintain a minimum 2% slope unless otherwise specified. Pipe sizes for fixtures must follow manufacturer's instructions. Minimum earth cover of 300mm is required for all plumbing pipes.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
116 views

Plumb 1 A

This document provides specifications for plumbing plans and installations. It states that all plumbing work must meet national, local building and plumbing codes. Shop drawings must be submitted for approval before fabrication. Pipes must be installed as indicated on plans and relocations require prior approval. Slope for sewer branches must maintain a minimum 2% slope unless otherwise specified. Pipe sizes for fixtures must follow manufacturer's instructions. Minimum earth cover of 300mm is required for all plumbing pipes.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1. ALL PLUMBING PLAN SPECIFICATIONS AND SHOP DRAWINGS SHALL MEET ALL REQUIREMENTS SET BY THE 3.

00m
NATIONAL BUILDING CODE,NATIONAL PLUMBING CODE, AND THE LOCAL CODE OF THE CITY. 0.75m 0.75m 1.50m
INLET
2. CONSTRUCTION NOTES AND TYPICAL DETAILS APPLY TO ALL DRAWINGS UNLESS OTHERWISE SHOWN OR NOTED,
MODIFY TYPICAL DETAILS AS DIRECTED TO MEET SPECIAL CONDITIONS. 0.10M THICK CONCRETE SLAB WITH
0.50m 0.50m 0.50m 10MMØ BARS SPACE AT O.25M.O.C
3. SHOP DRAWINGS WITH THE ERECTION AND PLACING OF PLUMBING MEMBERS SHALL BE SUBMITTED FOR THE
ENGINEER/DESIGNER'S APPROVAL BEFORE FABRICATION. BOTHWAYS
4. ALL PIPES SHALL BE INSTALLED AS INDICATED ON PLANS, ANY RELOCATIONS REQUIRED PROPER EXECUTION OF
OTHER TRADES SHALL BE WITH PRIOR APPROVAL OF THE ARCHITECT OR ENGINEER.
5.PROPOSED PLUMBING UTILITIES SHALL CONFORM TO THE ACTUAL LOCATION, DEPTH AND INVERT ELEVATION OF
ALL EXISTING PIPES AND STRUCTURES AS VERIFIED BY THE CONTRACTOR. MANHOLE MANHOLE MANHOLE
6. PLUMBING INSTALLATION SHALL NOT IMPAIR THE STRENGTH OF ANY STRUCTURAL MEMBER, COORDINATE WITH
STRUCTURAL PLANS AND DETAILS.
7. MATERIALS USED IN INSTALLATIONS SHALL BE OF APPROVED BRAND, FREE FROM ANY DEFECTS AND PASSED
THE QUALITY SET FORTH BY THE BUREAU OF PHIL. STANDARDS.
8. ALL PIPES AND UTILITIES SHALL BE ANCHORED TO A FIXED SUPPORT.
M
9. ALL SLOPE FOR SEWER HORIZONTAL BRANCHES SHALL MAINTAIN A 2% SLOPE MINIMUM UNLESS OTHERWISE
SPECIFIED.
10. SIZE OF WATER SUPPLY PIPES TO FIXTURES SHALL BE IN ACCORDANCE WITH THE MANUFACTURERS
INSTRUCTIONS.
OUTLET
1
11. THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES AT SITE AND COORDINATE THE WORKS WITH THE
SEWER LINE EFFLUENT DISPOSAL POINT AND WATER LINE SERVICE CONNECTION POINT.
2
3.00m
12. CONNECT ALL SEWER INSTALLATION TO A STANDARD SEPTIC TANK IN THE ABSENCE OF SEWER SYSTEM.
3W 0.75m 0.75m 1.50m
13. MINIMUM EARTH COVER OF 300MM SHALL BE OBSERVED FOR ALL PLUMBING PIPES.
0.10M THICK CONCRETE SLAB WITH
14. CONNECT ALL PLUMBING INSTALLATIONS WITH THE APPROPRIATE FITTINGS USING PROCEDURES. SEE 10MMØ BARS SPACE AT O.25M.O.C
MANUFACTURERS SPECIFICATIONS. BOTHWAYS
MANHOLE MANHOLE MANHOLE
15. CONDUCT PROPER ROUGHING-INS AND/OR WATER TEST PRIOR TO POURING TO ENSURE AGAINST LEAKAGE.
16. ALL PLUMBING FIXTURES SHALL BE AS PER ARCHITECTS SPECIFICATIONS.
AIRSPACE
17. ALL PLUMBING INSTALLATIONS AS INDICTED HEREIN SHALL BE DONE AS PER PLANS AND SPECIFICATIONS; NO
ALTERNATIONS SHALL BE DONE WITHOUT THE APPROVAL OF THE DESIGNER; CONSULT DESIGNER AND/OR HIS
REPRESENTATIVE ON THIS REGARD.
OUTLET
18. ALL WATER SUPPLY PIPES SHALL BE POLYPROPYLENE RANDOM (PPR) PN 20.
4"THICK CHB WALL PLASTER
19. ALL SOIL AND WASTE PIPES AND FITTINGS SHALL BE PVC SERIES 1000. FINISHED
10MMØ VERTICAL BAR SPACE LEACHING LEACHING DIGESTIVE CHAMBER
AT 0.60M. O.C. CHAMBER CHAMBER
10MMØ HORIZONTAL BAR
SPACE AT 0.60M. O.C.
0.10M THICK CONCRETE SLAB WITH
10MMØ BARS SPACE AT O.30M.O.C
BOTHWAYS
VICINITY MAP