NCR Reported by NCR Issued To: Non-Conformance Report

This non-conformance report describes a failure to properly cure newly poured concrete at a desalination plant construction site. Photos show cracks in the base slab of a metering pit, likely caused by a lack of curing, which could affect the concrete's strength. The root cause is identified as a lack of planning to arrange for curing. Corrective actions will be proposed and verified by quality management.

Uploaded by

Rahul Sundar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
116 views2 pages

NCR Reported by NCR Issued To: Non-Conformance Report

This non-conformance report describes a failure to properly cure newly poured concrete at a desalination plant construction site. Photos show cracks in the base slab of a metering pit, likely caused by a lack of curing, which could affect the concrete's strength. The root cause is identified as a lack of planning to arrange for curing. Corrective actions will be proposed and verified by quality management.

Uploaded by

Rahul Sundar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

Description:

Non-Conformance Report

1. Report Details: (Internal Audits / Internal Surveillance Findings)


Dept. / Project Name: SWRO DESALINATION PLANT NCR No.
Audit No.: Date: 29-06-2020 Type of NCR: Major Minor

NCR REPORTED BY NCR ISSUED TO


Name Sundarapandi Mr. JAMSHITH
Designation QC Inspector SITE ENGINEER
Department Quality Control Department Construction
2. Description of Nonconformance (add attachments if necessary):

During site surveillance it has been found that Failed to arrange curing arrangements for the previous day
poured concrete. Knowing that it has cause a crack and affect the strength. See attached photos
Location : Export metering systems , base slab of metering pit.

3. Reference Document(s): 4. Root Cause analysis:

See attached photos Lack of planning.

5. Disposition:

6. Correction to be done (To be taken without undue delay):

Proposed completion date: …../……/…….


7. Corrective Action:

Actual completion date: ……./……./…….

Verification & Approval By IMS Department


1. Corrective Action Verification:

2. Approval of Disposition /
Disposition completed by (Auditee/
Originated by: Auditor / Disposition Accepted by:
department):
Regional Quality Manager & IMR
Name: ______________________ Name: ______________________
Name: ______________________
Sign: ______________________ Sign: ______________________
Sign: ______________________
Date: ______________ Date: ______________
Date: ______________

ISSUE: 03 F.R.D. 01.08.2017 REV.: 02 FORM NO.: SP-IMS-F-007


Description:

Non-Conformance Report

ISSUE: 03 F.R.D. 01.08.2017 REV.: 02 FORM NO.: SP-IMS-F-007