2. Tools/Tackles/Consumables required:
I. Area isolation officer will request to SSL shift engineer on a printed “Permit To Work” for
power Isolation by filling permit no., equipment tag no., reason for isolation., requested
by(name), signature, date and time in section-1.
Request for II. Take electrical isolation permit/ work order and isolation tag from SSL shift engineer duly
Isolation of filled and signed.
Electrical III. Isolate equipment following process mention below and inform to SSL shift engineer after
Equipment isolation.
IV. SSL shift engineer will confirm isolation to area isolation officer by filling section-2 of
‘Permit To Work.’
By removal of fuses
Ensure the equipment is not in running condition.
Put the Isolator in the OFF position and remove control and power fuses.
Tie duly filled - in electrical isolation Tag on the Isolator / Panel Section.
By Rackin Rack out
Procedure for 1. MCC Module
Isolation of I. Ensure the equipment is not in running condition from ammeter reading and
Power Supply electrical ON / OFF indication.
of Electrical II. Press the emergency stop push button in MCC module (if available) and keep it
Equipment locked.
III. Put the Isolator to OFF position.
IV. Rack out the module / breaker from its compartment.
Tie duly filled -in electrical isolation Tag on the Isolator.
SMP FOR DISCHARGING
2. Tools/Tackles/Consumables required:
3. Manpower Required:
Responsibility Initiator: 1 Area-in-charge (SSL), 1 supervisor (Associate partner)
I. For job(s) on process equipment Process engineer is responsible for initiating
the electrical isolations / restoration.
II. For job(s) on non-process equipment Area engineer is responsible for initiating
the electrical isolations / restoration.
III. Planning, supervision, record maintaining & briefing safety aspects will be done
by area engineer.
Executer: 1 Electrical Technician (Associate partner )
Authorized electrical person is responsible for safe operations.
Loose connections
Adequate tension on bolted joints
Eroded contact surfaces
Contaminated or corroded contacts
Procedure
Red and Black probes to be connected as per color coding.(Marked as V+,I+ and
V-,I-)
The subject under test had to be connected in below pictorial method.
SMP FOR CONTACT RESISTANCE CHECKING OF VCB
Point to be Ensure that the connections are tightly secured and micro ohm meter disconnected.
ensured Equipment under test is restored to its normal state and ready to be charged.
before
cancelling
permit
1. Isolation will be done only with properly filled “ELECTRICAL ISOLATION TAG”.
2. Restoration will be done only if energisation permit is received duly filled up by
authorized person.
3. While restoring the power, ensure the isolation tag no. printed on the stub and tag tied on
the panel is matching.
Precautions to 4. Under no circumstances, shall the "Electrical Isolation Tag" be removed from the
be taken care Equipment at any time while the maintenance work is in process.
5. If the electrical lock out tag is found obliterated, mutilated or removed, the Manager /
other authorized persons of Process Department shall recheck to ensure that the
equipment is isolated and a fresh Electrical Lock out tag is re-fixed in accordance with
this procedure. He will record the reasons for issuing the fresh Electrical Lock out tag.
8. Bibliography: Kindly refer the Annexure attached with Master list of SMP.
2. Tools/Tackles/Consumables required:
3. Manpower Required:
Responsibility Initiator: 1 Area-in-charge (SSL), 1 supervisor (Associate partner)
I. For job(s) on process equipment Process engineer is responsible for initiating
the electrical isolations / restoration.
II. Planning, supervision, record maintaining & briefing safety aspects will be done
by area engineer.
Executer: 1 Electrical Technician ,1 Helper(Associate partner )
I. Authorized electrical person is responsible for safe electrical isolation /
restoration, filling up, sign on “electrical isolation tag”.
II. Authorized persons to work on HT equipment are responsible for carrying out
earthing operation for HT equipment.
Introduction Mechanical interlocks are checked for proper functioning of mechanism of breaker and to
ensure that as per mechanical operation all interlocks are intact for safe operation.
Hole
SOP FOR CHECKING MECHANICAL INTERLOCK OF BREAKER
If the plug is not fit in then breaker is unable to be racked in so this has
to be ensured that its working properly and plunger fits in the hole
when plug is removed.
Check for its smooth operation and lubricate if necessary.
VCB has a slot to insert rack-in handle with operating free-lock switch
along with push to trip button arrangement.
Lock-Free
Switch
Push to Trip PB
Slot closed
Slot
open
For rack in rack out purpose switch has to be put in free mode and only then
the slot will be open to put the rack-in-out handle.
The mechanism has to be properly lubricated and positions of all movable parts
to be checked for any variations in position or occurrence of any jamming.
Service limit
switch Test limit switch
During rack in rack out breaker gets locked in two positions that
is service and test positions.
Breaker mechanism is checked at test position by putting lock-
free
to lock mode and free mode.
Check if the test limit switch gets activated and deactivated
properly by free movement of the side bar which pushes it.
Rod Moves up
when
unlocked
Door Interlock
TAMCO BREAKERS
Interlock lever
Racking hole
SOP FOR CHECKING MECHANICAL INTERLOCK OF BREAKER
Lever is lifted up
Point to be Equipment under maintenance to be restored to its normal state and ready to be
ensured before energized.
cancelling Remove general shift tag after job completion.
permit
1. Isolation will be done only with properly filled “ELECTRICAL ISOLATION TAG”.
2. Restoration will be done only if energisation permit is received duly filled up by
authorized person.
3. While restoring the power, ensure the isolation tag no. printed on the stub and tag tied
on the panel is matching.
Precautions to 4. Under no circumstances, shall the "Electrical Isolation Tag" be removed from the
be taken care Equipment at any time while the maintenance work is in process.
5. If the electrical lock out tag is found obliterated, mutilated or removed, the Manager /
other authorized persons of Process Department shall recheck to ensure that the
equipment is isolated and a fresh Electrical Lock out tag is re-fixed in accordance with
this procedure. He will record the reasons for issuing the fresh Electrical Lock out tag.