Azspu Major Projects Geotechnical Investigation For Foundations and Civil Works
Azspu Major Projects Geotechnical Investigation For Foundations and Civil Works
Total pages: 6
TABLE OF CONTENTS
1.0 SCOPE
This specification covers but not limited to, soil investigation and foundations
recommendation for the following onshore structures:
a) Site Preparations
b) Equipment
i) Compressors (Centrifugal and Reciprocating)
ii) Separators
iii) Heat Exchangers
iv) Pumps
v) Vessels
vi) Tanks, etc.
c) Piperacks and Steel Structures
d) Process Units
e) Platforms and Walkways
f) Underground Piping
g) Bund Walls
h) Sump Pits
i) Roads, Embankments and Paving Areas
j) Buildings
2.0 DOCUMENTS
a) Sketch approximate location showing number and depths of CPT tests and
borings to be conducted for AzSPU MAJOR PROJECTS.
b) Overall Site Plan
c) Project Geotechnical Reports
i) FUGRO Engineers B.V.
Geotechnical Engineering
Sangachal Terminal and Waste Disposal Facilities
Chirag1 Early Oil Development Project, Republic of Azerbaijan
July 11, 1996
ii) URS Dames & Moore
Factual Report
Geotechnical Investigation-Sangachal Onshore Terminal Expansion
27-Aug-2001
iii) Tractebel Development Engineering
ACG 2nd Produced Water Tank Geotechnical Report
TR-1QOUZZ-CV-REP-0001 Revision C1
October 11, 2006
iv) GIBB Ltd.
Doc No: BR-CDOAZZ-CV-SPE-0005 Rev C1 Page 3 of 6
GEOTECHNICAL INVESTIGATION FOR AzSPU MAJOR PROJECTS
FOUNDATIONS AND CIVIL WORKS Doc No: BR-CDOAZZ-CV-SPE-0005 Rev C1
Part I of the Soil Investigation shall be consist of all necessary field work required
for borings along with Laboratory testing of samples obtained from field, based on
Specification K20-2C.
Part II of Soil investigation shall consist of Engineering analysis and preparation of
a report based on section 2.4 and 3.4 of Specification K20-2C.
Based on economics, the Company may split Part 1 and Part 11 of work between
two different GSO’s.
In this case the designated GSO for Part 1 of the work shall provide all necessary
boring data and testing results in form a report in English to the Company.
This is to ensure that designated GSO for part 11 of soil investigation has all
necessary information to perform engineering calculations and prepare a Report
which can be used for design of foundation for ACG Produced water system.
GSO to provide list of field tests to be conducted as per section 2.2 of KBR
specification K20-2C.
GSO for Part 1 of the work shall provide list of field tests to be conducted as per
section 2.3 of KBR specification K20-2C.
GSO for Part 1 of the work to provide information about laboratory sample
handling and the results of the laboratory tests and general information on test
procedures respectively.
The general guidelines for the laboratory test program shall be as follows:
The water table at site shall be recorded on 15 meter deep boring if it is within this
zone.
Below this, the water table can be assumed to be deep enough so as not to cause
any effect on foundation.
Reduction in strength of soils during saturated conditions due to rains, spills, etc.
shall be addressed in the report.
GSO for Part 1 of the work to conduct a limited number of tests (at least 1 at the
tank location) to determine the soil permeability at 0.5 meter, 1 meter, 1.5 meter
using triaxial permeability test on sample compacted to 95% of maximum dry
density.
GSO for Part 11 of the work shall provide comprehensive soils report showing
results of laboratory testing, foundation recommendation and perform all
necessary calculations.
The following soil design parameter shall be provided as a “minimum” in the final
soil report
If the results vary, a minimum, maximum and mean values shall be recommended.
TITLE DESCRIPTION
Soil condition at Terminal Site – with respect to geology & soil
General
stratification – general description
Atterbergs-- limits-Liquid
Soil Plasticity and Classification
limit, Plastic limit, and PI (%)
Water content (%) Degree of Saturation
3
Unit weight of soil (KN/m ),
Cohesion © KN/m2 and This shall be provided for drained and undrained condition
(Ф)angle of shear resistance
Soil Shear Strength profile Curve showing variation of shear strength with depth based on
with depth in-situ and laboratory testing
Net Ultimate Bearing Capacity & Net Allowable Bearing
Bearing Capacity Capacity with F.O.S.
and F.O.S. (rectangular & square spread footing, mats, slab at grade, etc.)
Reduction in bearing capacity for saturated soil
Mean Load settlement curve @ various contact pressures for
Settlements
mats & spread footing.
Modulus of Elasticity, Shear
At surface and at various depths.
Modulus and Poison’s Ratio
(Static and Dynamic)
(μ) of Soil
Electrical Conductivity Values for Electrical Conductivity of soil(ms/m).
Engineering properties of soil include compressibility, shear
strength, Proctor density, CBR, permeability, liquefaction and
dynamic characteristics. Soil S-Values (UBC Code) shall be
presented. P and S wave velocities (seismic shear velocities
(m/sec).
Characteristics associated with these properties, which must be
General Engineering known for derivation of engineering parameters, such as swell
Properties of Soil potential, liquefaction potential, compaction characteristics, rock
quality designation (RQD) including grain size, texture hardness
and degree of weathering.
pH and chemical content shall be measured during testing shall
be provided in order to obtain accurate input to the geotechnical
analyses.
CPT test results of all hole pit shall be included on logs.
Horizontal & Vertical
Modulus sub-grade Average value for KV and KN (KN/m3).
reactions
Permeability values Values of soil permeability (m/sec).