User - Manual - Service Purchase Order PDF
User - Manual - Service Purchase Order PDF
Material Management
Date: 10-10-2014
User Manual
Table of Contents
1.0 Overview ................................................................................................................................4
2.0 How to Access Transaction - Creation of Purchase order in ME21N ............................................5
Service Purchase order - Domestic ................................................................................................ 10
EUP Category:
Release: ECC6.0
1.0 Overview
This document is prepared show how to create, change and approve Purchase order in SAP.
Gives details of document types to be used, Plant, Purchase organization, Purchase group
which are used as authorization objects and to control the approval process using Release
strategies.
Apart from standard controls and validations, Customized validation are shown in this document
which are applicable to all sectors.
1. Material Purchase
a. Domestic purchase
b. Import of goods
2. Service procurement
a. Domestic service
1. By adopting the approved Purchase requisition, assuming vendor selection and finalization is
outside SAP, vendor selected after negotiation has been created in SAP
2. By adopting RFQ after price comparison in SAP where vendor is selected for Purchasing
3. By adopting the Contract, PR for quantity requirement, Contract is long term agreement with
vendor already selected in enquiry process.
Via Menu Path Logistics -> Material Management -> Purchasing ->
Purchase order
Via Transaction Code ME21N
Following document types are available for use depending on the business scenario.
GCAP DOMESTIC ASSET PO ALL sector Asset procurement with Account assignment
ZCAP IMPORT ASSET PO ALL sector 'A'
GDOM DOMESTIC MATERIAL PO ALL sector Only Material procurement is allowed, where
material will be received to stock and issued
GIMP IMPORT MATERIAL PO ALL sector on need basis
GEME EMERGENCY PUR.ORDER ALL sector PO less than 20000 allowed in this document
GFRO Order-Rate Contract GIL EPC To monitor rate contract and control
authorization this document type is created
for GIL EPC team
GWOD DOMESTIC WORK ORDER ALL sector Composite Purchase order handle both
material and services, for Material account
assignment is mandatory
GIWD IMPORT WORK ORDER ALL sector With facility to change the Heading of
Purchase order in print out using selection in
Customer data tab in header of PO
GSER DOMESTIC SERVICE PO ALL sector This document type is used to capture
Services, Item category 'D' Service is
mandatory, For services with item category
GISV IMPORT SERVICE PO ALL sector D, Account assignment is mandatory
GPIT IT PURCHASE ORDER ALL sector, GDOM is used inplace of this doc type
GSTO STOCK TRANSPORT PO Stock transfer Used where stock needs to be transferred
between plant from plant to another plant within Company
code
User Manual
Linking of PR document type to PO document type and allowed Valuation type in PO document type
PO document type
summary.xlsx
User Manual
For Services and Non stock material without material number account assignment listed below is used
depending on where cost needs to be booked. In some case, for material procurement account
assignment is used to book directly to cost object.
14 Requistioner MV-Civil Input field Free field - width 12 character e.g. Name of person requested
16 Valuation price Will be based on Input field / Estimated 'Unit' price of the material.
copied from Note:- If Material is already received in SAP, system will
list of service in material propose 'Moving average' price of the material as unit rate, so
service item tab master in case that user creating requirement will be aware of the unit price
material from earlier transaction in SAP
number is
entered is
updated with
Moving
average price
User Manual
17 Storage location Not mandatory Input field In case of Account assigned PR, storage location is not
required as the material/service is received at department. In
SAP when Goods Receipt is made materia l will be directly
issued to Asset as in PR/PO
18 Purchase group AC1 Input Purchase group related to plant should be used / data will be
field/copied copied from Material master if data is maintained
from Material
Master
19 Tracking number MV-SRV Free field - width 10 character e.g. Name of person requested
Purchase order can be created adopting, Purchase requisition, RFQ which are approved (Release
strategy in SAP)
Adopting Purchase requisition will reduce the data entry time, only vendor code, Rates, taxes (tax code)
needs to be maintained as per negotiation with vendor and statutory guide lines.
Adopting RFQ to PO will copy PR, Vendor and rates maintained in RFQ – vendor chosen.
In case, RFQ is not created, PR needs to be adopted to with further data like vendor, payment terms,
taxes needs to be maintained in PO as per negotiation.
Adopting the PR to PO will copy all the data maintained in PR, In PO, Vendor code, Payment terms, tax
code, Unit price (in case of material, for service price from PR will be copied to PO), and delivery
conditions to be maintained as per negotiation with vendor.
Under Item details ‘Services’ List of activities (Package) for ‘Earth Work’ to be maintained.
User Manual
List of services from above table is copied to services screen, assumption the ‘Gross price’ (Unit price) is
agreed price with vendor.
Press enter key to enter details of account assignment, Here, Cost center (K) and G/L account as per
business requirement. For demo following cost center and G/L is used
User Manual
G/L account
5500006001
Cost center 1600000000
Click on ‘Rpt AA on’ and ‘Auto Repeat AA’ to copy account assignment to all services.
Note: Request to confirm the G/L and Account assingment (here Cost center) with Finance, account
assigment used here is for demo only.
User Manual
Account assignment copied to all services any change in account assignment to be made as follows
User Manual
In the window above change of G/L and Cost center (here in this demo) can be made, sometime
account assignment screen may appear as below
User Manual
In above screen, G/L and Cost center can be changed, from this screen to go to PO, click Back button
User Manual
Enter tax code, based on discussion with vendor tax code as applicable should chosen, for service
there may to service tax applicable, choose relevant tax code and assign in line item under ‘Invoice’ tab
(item details). Tax code is mandatory in PO, if tax is not applicable use Zero tax code. Here in demo tax
code I0 – Zero rated tax code is used.
User Manual
Check
With message ‘No messages issued during check’ PO can be saved. Any changes can be made in ME22N
before start of approval process
User Manual
PO number 4800107427
Approval process will be automatically triggered based on plant, pur org, pur grp, document type and
total value of the PO
User Manual
Plant : 1600, Pur org 1600, Scope list : ALV, Pur grp : AC1 (e.g)
User Manual
PO created above will be listed with 1 line item with quantity as 1 AU as this is a service Purchase order,
Services will be available under ‘Services’ tab
User Manual
There is custom validation built in Purchaser order approval process that attachment is mandatory for
start of release of Purchase order in ME29N. Hence, steps to attach DMS - Document management
system in PO line item is shown here, Refer list of document type used for attachi ng the documents
below
Transaction code: CV01N transaction will be called from PO change mode to attach the DMS documents
with document type, authorization group = Plant, Necessary authorization for CV01N, DMS document
type and authorization group needs to be taken by Procurement user.
Process of attaching DMS document is same for all types of Purchase order as shown below.
ME22N
User Manual
Select line item 10 (any one of the line of PO should contain attachment)
In the DMS document window click on ‘Create’ - for this user should have authorization for CV01N,
contact DL_SAP_SECURITY (Group email id) for authorization
User Manual
Choose DMS document type , here A36 – NFA document is choosen for attachment
Click on to attach the file which already scanned / softcopy is kept in local folder, for demo here a
pdf file is attached. Request to attach relevant document / softcopy / file in DMS
User Manual
File attached,
Continue to save
Now Save the PO, If PO is not saved DMS attachment will not be linked to PO
User Manual
User Manual
Via Menu Path Logistics -> Material Management -> Purchasing ->
Purchase order -> Release
Via Transaction Code ME29N
Collective Release ME28 is given to user after second level onwards as PO created in plant will be going
higher authority, and volume of release is huge.
User Manual
PO Without attachment
With attach in PO
PO 4500052918; is assigned with 4 level approval process, based on, authorization for Relese group
and Release code user will be able to approve in ME29N
If user sees icon under ‘Release options’ at any level of the approval based on current status of
approval user will be authorized to approve at respective level
If user sees icon unser ‘Release options’ user is not authorized for release (Note that ‘Release
option’ column can be seen in ME29N in Change mode, in display mode this will not be shown)
User Manual
Click on
Caution: Release / approval will effect only upon ‘Saving’ PO after Releasing and saving PO in ME29N
For other level approval User will login to system and use ME29N to approve.
Before
User Manual
After
Before
User Manual
After
Via Menu Path Logistics -> Material Management -> Purchasing ->
Purchase order-> ME23N -> Print preview -> print
Via Transaction Code ME9F
In ME23N / ME22N / ME29N / ME2M report select PO and click on ‘Print Preview’
User Manual
Caution : ME9F -> Output Message -> print should be used only after finalization of the Purchase order
as this will trigger versions in subsequent changes in Purchase order and may lead to wrong Print, Only
changed item will be printed in subsequent verisons, if line item is not changed, item will be blank.
Refer User manual “User Manual PO amendment steps.doc” for steps to generate version using ME9F
and Changes in ME22N
Following screen shows Printing of Contract using ME9K, Process is same for ME9F;
For Contract Version management is not activated, For purchase order Version management is
activated and subsequent prints after ‘ME9F –output message will be with changed items i.e. changes
only will be printed and these changes can be forwarded to vendor by converting the spool generated
into pdf file.
User Manual
User needs to have authorization for respective plant, pur org, pur grp used in contract,
To take print out select the contract and click on ‘Output message’ button on top of the s creen (above
screen)
User Manual
A window with print set up will appear with default values, if values are not assigned, Fill Output device
as ‘Front End’
Deselect – Delete After Output (This will delete the spool generated while taking print out, hence to be
deselected to keep the spool), if already selected
Select – New Spool Request (this will create separate spool for each print taken, otherwise, all the print
out spool for user will be appended to single PDF file as number of pages)
User Manual
Here for demo, Printer is selected as ‘One note’ application where contract will be displayed, instead of
printing
User Manual
User Manual
To convert the Spool generated in above print process following steps to be followed, Note : user
should have necessary authorization for reading / downloading spool for conversion, contact
DL_SAP_SECURITY (group mail id) for necessary authorization, Use transaction code SU53 to display
missing authorization and forward screen shot to this team for authorization
User Manual
In the Menu path Find System -> Own Spool Requests and navigate to spool list, if System menu is not
available in transaction screen go to main SAP menu to choose ‘System’ Menu
Following screen listing Spool number (all print out taken by user, if spool is not deleted after output/
print)
Latest spool no will be print generated for contract in this case / demo
User Manual
Click on icon marked to veiw and check the document whether it is the same
document
To convert the spool to pdf note down spool number here it is 832178 and for saving file use Contract
number 5600000126, so that tracking will easy
Click on execute to save the file in desired path in local desktop / laptop
Here File name is given as Contract number and file path in local drive is choosen for demo
5600000126.pdf
Note : Print layout in the PDF is at the time of testing, layout may be different in Production client as
the changes may requested