Checklist For Stone Works

1) This document is a checklist for stone works that outlines inspection items at different stages of installation. 2) It lists items to check before installation such as construction documents, substrate preparation, and material readiness. 3) During installation, it specifies checking alignment, pattern, fixing, cutting, joint width and continuity, stone firmness, and grout application and curing times. Post-installation checks include cleaning, finishing, and completion verification.

Uploaded by

harikrishna
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (3 votes)
3K views1 page

Checklist For Stone Works

1) This document is a checklist for stone works that outlines inspection items at different stages of installation. 2) It lists items to check before installation such as construction documents, substrate preparation, and material readiness. 3) During installation, it specifies checking alignment, pattern, fixing, cutting, joint width and continuity, stone firmness, and grout application and curing times. Post-installation checks include cleaning, finishing, and completion verification.

Uploaded by

harikrishna
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

Project Name

Form No.

CHECK SHEET FOR: STONE WORKS Rev. 0


Date :
Page : 1 of 1
Date:
SECTION OF WORK : LOCATION :

CHECKED BY
STAGE ITEM
Cont. Cons. DATE
PRE-INSTALLATION All the related construction documents Material approval and
shop drawings in place and approved.
Work of other trades to be completed and accepted
Necessary MEP clearance obtained
Store marble tile near each area
Concrete substrate clean, free of dirt, dust, debris and loose
particles that could affect mortar bond
Mortar bonding material ready at work area.
Setting out as per approved lay out.
Check mix proportion of bedding mortar/adhesive if any
INSTALLATION Check alignment and pattern
Check the dry fixing done as per the approved layout and
using approved bracketry and accessories
Check stone cutting at openings, pipe angle points etc
Check straightness and width of joint
Check mixing of grout
Check the continuity of the joint & grout
Check the firmness of cut stone on the bed
Check grouting is done after 24 hrs
CLEANING AND Check surplus grout is removed from the joint
FINISHING
Check all visible marks and strains are removed
check debris from the work removed from site after completion
Check approved sealer finish applied as per consultant
direction.
Check stone work completion.
Check stone work protection

Project Engineer QCE consultant Rep.:


DATE DATE: Date

Sign. Sign. Sign.