An eddy current inspection report was generated for Transocean regarding two fast line sheaves on a crown block. The inspection found no defective indications on the inner and outer welds of the sheaves or support bracket welds using two probes at different frequencies and gains, with compensations made for paint thickness. The sheaves passed inspection and were deemed acceptable according to specifications.

Uploaded by

haoues23
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
191 views

ECI - (Report Example 2)

An eddy current inspection report was generated for Transocean regarding two fast line sheaves on a crown block. The inspection found no defective indications on the inner and outer welds of the sheaves or support bracket welds using two probes at different frequencies and gains, with compensations made for paint thickness. The sheaves passed inspection and were deemed acceptable according to specifications.

Uploaded by

haoues23
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

Rbg Ltd

Eddy Current Inspection Report

Customer : Transocean Location : J.W.McLean


P.O. No : W.I. No : 51-20-01276 Report No : ECI-MS2164-004
Procedure : QCP-EC-161 Surface : Painted
Equipment : Hocking Locator 2s Serial No : 524751-09

Client : Transocean Item: Crown Block Fast Line Sheaves


Drawing No : N/A Specification : AWS D1.1
Material : Carbon Steel Size : N/A Quantity : 2 Off
Identification / Serial No : Fast Line Sheaves

Probes Freq. Gain Phase Calibration Serial No.


Absolute 10kHz 18dB 308 Add 3dB Per 0.5mm of coating 524673-04
Bridge 100kHz 57dB 308 1mm to 6 screen divisions 546422-03

NOTE: Compensations made for variable geometry and paint thickness.

100% Eddy Current Inspection was carried out on all accessible areas on the fast line sheaves, inner & outer
welds on sheaves & support bracket welds.

Results: No defective indications evident at the time of inspection.

Acceptable to specification

Continuation attached : Yes

Inspector : S.Emery Signature : Date : 22/01/07


Qual : PCN

For Client use : For Certifying Auth. use :