An eddy current inspection report was generated for Transocean regarding two fast line sheaves on a crown block. The inspection found no defective indications on the inner and outer welds of the sheaves or support bracket welds using two probes at different frequencies and gains, with compensations made for paint thickness. The sheaves passed inspection and were deemed acceptable according to specifications.
Download as DOC, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
191 views
ECI - (Report Example 2)
An eddy current inspection report was generated for Transocean regarding two fast line sheaves on a crown block. The inspection found no defective indications on the inner and outer welds of the sheaves or support bracket welds using two probes at different frequencies and gains, with compensations made for paint thickness. The sheaves passed inspection and were deemed acceptable according to specifications.