This document outlines three exercises for determining material requirements planning (MRP). The first exercise provides the product structure and lead times for final product A, with demand occurring in weeks 5 and 6. The second exercise fills out an MRP table for a product with a 2-week delivery time and order lot size of 100 pieces. The third exercise does the same for a product with a 2-week delivery time and minimum order quantity (MOQ) of 200 pieces.

Uploaded by

David Businelli
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
57 views

Jyväskylän Ammattikorkeakoulu JAMK University of Applied Sciences Postiosoite/ Address Puhelin/Tel. Faksi/Fax Internet

This document outlines three exercises for determining material requirements planning (MRP). The first exercise provides the product structure and lead times for final product A, with demand occurring in weeks 5 and 6. The second exercise fills out an MRP table for a product with a 2-week delivery time and order lot size of 100 pieces. The third exercise does the same for a product with a 2-week delivery time and minimum order quantity (MOQ) of 200 pieces.

Uploaded by

David Businelli
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

MRP 1 (2)

MRP

Exercise 1

A LT: 1 w

B LT: 2 w C LT: 1 w

D LT: 1 w E LT: 1 w

The product structure of the final product A with lead times (LT) is shown above. Complete the table
below to determine the need of components and when to place an order. Demand for final product A is
50 at week 5 and 100 at week 6.

Week
Item
1 2 3 4 5 6
Gross Requirements 50 100
A
Beginning of assembly
Gross Requirements
B
Planned order
Gross Requirements
C
Planned order
Gross Requirements
D
Planned order
Gross Requirements
E
Planned order

Jyväskylän Postiosoite/ Puhelin/Tel. Faksi/Fax Internet Y-tunnus 1006550-2


ammattikorkeakoulu Address 020 743 8100 (014) 449 9694 www.jamk.fi
JAMK University of PL 207 +358 20 743 8100 +358 14 449 9694
Applied Sciences FI-40101 Jyväskylä
FINLAND
MRP 2 (2)

Exercise 2
Fill the following MRP- table. Delivery time for this product is 2 weeks. The order lot size is
100 pieces.
Week 1 2 3 4
Gross Requirements 50 45 20
Available inventory 75
Net Requirements
Planned Order Receipt
Planned order

Exercise 3

Fill the following MRP- table. Delivery time for this product is 2 weeks and Minimum Order
Quantity (MOQ) is 200 pcs. How should we proceed?

week 1 2 3 4
Gross Requirements 50 250 100 50
Placed orders 200
Available inventory 150
Net Requirements
Planned Order Receipt
Planned order

Jyväskylän Postiosoite/ Puhelin/Tel. Faksi/Fax Internet Y-tunnus 1006550-2


ammattikorkeakoulu Address 020 743 8100 (014) 449 9694 www.jamk.fi
JAMK University of PL 207 +358 20 743 8100 +358 14 449 9694
Applied Sciences FI-40101 Jyväskylä
FINLAND

You might also like