0% found this document useful (0 votes)
244 views

See Clause 2.1

The document outlines the project facilities that must be constructed for a six-lane highway project in Andhra Pradesh, India. The facilities include toll plazas, roadside furniture, operation and maintenance centers, wayside amenities, truck parking areas, pedestrian facilities, lighting, landscaping, and more. Specific requirements are provided for toll plazas, road signs, markings, and delineators. Two wayside amenities totaling 2 hectares must be developed along the highway.

Uploaded by

nandu523
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
244 views

See Clause 2.1

The document outlines the project facilities that must be constructed for a six-lane highway project in Andhra Pradesh, India. The facilities include toll plazas, roadside furniture, operation and maintenance centers, wayside amenities, truck parking areas, pedestrian facilities, lighting, landscaping, and more. Specific requirements are provided for toll plazas, road signs, markings, and delineators. Two wayside amenities totaling 2 hectares must be developed along the highway.

Uploaded by

nandu523
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 10

Construction of Six laning from Naidupeta (Green field) to Turpu Kanupur Ch: 57+046 to Ch:91+910 in the State of

Andhra Pradesh on EPC mode under Sagarmala Scheme

SCHEDULE –C
(See Clause 2.1)
PROJECT FACILITIES

1 Project Facilities

The Concessionaire shall construct the project facilities in accordance with the provisions
of this agreement. Such Project facilities shall include:

a) Toll Plaza
b) Road side furniture
c) Operation and Maintenance Centers
d) Way side amenities / Rest Areas
e) Smaller Parking Places with Toilet Facilities Service Area
f) Truck Parking Areas
g) Pedestrian Facilities / Cattle Crossings
h) Lighting
i) Environmental Management Plan
j) Landscaping and Tree Plantation
k) Advanced Traffic Management System (ATMS)
l) Utilities
m) Rain water harvesting

1.2 Project Facilities to be completed on or before project completion date have been
described in Annex-I of this Schedule-C.

National Highways Authority of India Page-1


ANNEX – I
(Schedule-C)
PROJECT FACILITIES

1 Project Facilities

The Concessionaire shall construct the Project Facilities described in this Annex-I to form
part of the Project Highway. The Project Facilities shall include:

a) Toll Plaza
b) Road side furniture
c) Operation and Maintenance Centers
d) Way side amenities / Rest Areas
e) Smaller Parking Places with Toilet Facilities Service Area
f) Truck Parking Areas
g) Pedestrian Facilities/ Cattle Crossings
h) Lighting
i) Environmental Management Plan
j) Landscaping and Tree Plantation
k) Advanced Traffic Management System (ATMS)
l) Utilities
m) Rain water harvesting

2 Description of Project Facilities

2.1 Toll Plaza

The Toll Plaza with Booths shall be provided on main carriageway as per Schedule D and
minimum lane requirement in the opening year are as follows.
Toll Plaza location and Minimum Lane Requirement in the Opening Year

Toll
S. Tolling Plaza From – Tolling Toll Lanes
Side
No Section Locatio To Section
n Length ,Km

57+046 to 84+800 L.H.S 7+1(wide lane)


1 85+200
91+910 85+600 34.846 R.H.S 7+1(wide lane)

Note:
1. Entry approach to each toll Booth shall be having Weigh in Motion
equipment and tunnel shall be constructed for connecting toll booths
and toll office for collection of toll fees as per Schedule D.
2. Based on the minimum toll lane requirement as given above, toll booths,
toll Booth complex, weigh bridges, electrical systems, toll Booth and all
other facilities required/mentioned in manual shall be provided as per
Schedule D with approval from IE and NHAI. All the structures shall be
RCC framed structure as per schedule D.
3. RE wall/Retaining wall shall be provided at toll Booth locations to
restrict the embankment slope within the right of way.
4. No. of toll lane specified above are minimum indicative. The
Concessionaire shall design and provide toll lane as per IRC: SP:99
subject to minimum specified above. Any increase in no. of toll lane
shall not be treated as change of scope, save and except any variations
in the length arising out of a Change of Scope expressly undertaken in
accordance with the provisions of Article 16.
5. Solar panels shall be erected over the Toll Plaza Canopy to generate the
green energy. Same shall be utilized for Toll Plaza lighting with LED
lights and other energy requirement within toll plaza area. In addition to
solar panels conventional lighting shall be provided by Concessionaire.
6. All Toll Lanes to be equipped with Hybrid ETC equipments as per NHAI
circular No. NHAI/13013/2016-17/CO/Hybrid ETC/112716 dated 08-02-
2018. 2 lanes on each side shall be full ETC lanes.
7. A separate toilet facility for road users shall be provided near toll plaza
location along with parking facility. One toilet block on each direction
shall be provided as per drawing at Annex-I of Schedule-C. These toilet
facilities shall follow CPWD specifications for sanitary ware items and
fittings such as EWC, wash basin, Wash basin-Under counter, Urinal flat
back, PVC Cistern, IWC Orissa Pan, Flush Value –CP, Wash Basin pillar
cock-CP, Bib Cock—CP, Health Faucet, W/c Bib cock, Wash Basin angle
cock.
8. Point of Sale (POS) with card swapping machines shall be provided.

2.2 Road side furniture

2.2.1 Kilometer and Hectometer Stones

Kilometer and Hectometer stones shall be provided in accordance with Schedule -


D.

2.2.2 Road Signs

The Road Signs on Highway shall be provided in accordance with Schedule - D.


Gantry Mounted Advance Direction Sign
The Gantry sign boards shall be placed ahead of a traffic diverging point on main
highway where grade separated movement has been facilitated for main highway
traffic. Minimum of 12 sign boards shall be placed as per site requirement.

2.2.3 Road Marking

The Road Marking on Highway shall be provided in accordance with Schedule - D.


2.2.4 Road Delineators

The Road Delineators on Highway shall be provided in accordance with Schedule -


D.

2.2.5 Reflective Pavement Markers & Solar Studs

The Reflective Pavement Markers & Solar Studs on Highway shall be provided in
accordance with Schedule - D.

2.2.6 Traffic Impact Attenuators

The Traffic Impact Attenuators on Highway shall be provided in accordance with


Schedule - D.

2.2.7 Crash Barriers

Thrie-beam crash barrier and Concrete barriers shall be provided as specified in


Schedule B.

1.1.1 Boundary wall and Fencing

As the Highway is Partially access controlled facility, boundary wall is its integral
part to help enforcing of the acquired access rights.
Access control extends to the limits of the legal access control on the ramps i.e.,
along the ramps to the beginning of the taper on the local road.
RCC boundary wall shall be provided along the entire length on either side
(including transverse requirements at structure locations) in accordance with
Schedule B and Schedule D.

2.3 Operation and Maintenance centers

Dedicated operation and maintenance center shall be provided in accordance to Schedule


D.

2.4 Way side Amenities / Rest Areas

2.4.1 Facilities

2.4.1.1 Way side Amenities / Service Areas

Wayside amenities shall be a part of the Highway and shall be constructed with the
minimum facilities such as Parking areas (Trucks, Buses, Cars, Mini Buses), Fuel Station
and garage for minor repair, Hotel/Motel, Trauma Center, Rest Areas, Fast Food Centre,
Travel Information Facilities, Toilets and Bath Facilities, space for Maintenance staff &
Vehicle Service Station, Dormitory, Helipad, Generator room/ solar system area, Play
Area & security personnel.
Separate area Truck Parking facilities to be provided in this way side amenity for truck
parker. Truck parker to have separate Dhaba, Water Kiosk, Weighing bridge, Motel, Toilet
facility, Garage/Workshop/service centre as per schedule D.
Wayside amenities of 2 Hectares on LHS side shall be developed at the following location
in accordance to Schedule – D. The layout with minimum number of units per facility and
the minimum area per facility to be developed is given in Drawings folder Uploaded along
with the bid documents. However, the provisions given in above referred drawings shall
be minimum.

Rest Area
Design
S. No Side Area(Ha) Remarks
Chainage
Naidupeta to Turpu Kanupur (57+046 to 91+910)
Chendodu
1 79+100 LHS 2.00
Village

2.4.1.2 Truck lay-byes:

The truck lay-bye shall be provided at below given location.


Sr. No. Design Chainage Side Remarks
1 87+050 LHS Kakuvari
2 87+200 RHS palem/Karlapudi

2.4.1.3 Bus-bays:

The Bus-bays with Shelters shall be provided at below given location.

S.NO Design Chainage Side

1 58+000 L.H.S

2 58+120 R.H.S

3 60+000 L.H.S

4 60+120 R.H.S

5 61+530 L.H.S

6 61+620 R.H.S

7 67+400 L.H.S

8 67+420 R.H.S

9 72+000 L.H.S

10 72+100 R.H.S
11 75+180 L.H.S

12 75+280 R.H.S

13 79+900 L.H.S

14 80+000 R.H.S

15 81+100 L.H.S

16 81+130 R.H.S

17 83+380 L.H.S

18 83+420 R.H.S

19 87+770 L.H.S

20 87+830 R.H.S

21 90+610 L.H.S

22 90+770 R.H.S

Note: Minimum, additional 20 number of Bus bays should be developed as per site
conditions. Any increase in number of Bus bays may not be treated as Change of
Scope.

2.4.2 Specifications and Standards for above facilities

The Project shall be constructed in conformity with the Specifications and Standards
specified in this schedule and Schedule-D.

2.5 Pedestrian Facilities / Cattle Crossings

NIL

2.6 Lighting

The Concessionaire shall provide lighting as per Schedule - D at following locations of the
Project Highway.

(i) Toll Plaza area


(ii) Operation and maintenance centers
(iii) Way side amenities / Rest Areas
(iv) Bus Bays /Truck Parking Areas
(v) Underpasses
(vi) Flyover
(vii) Traffic aid posts, vehicle rescue posts, medical aid posts and all other facility
& service buildings.
(viii) Yellow flashing lights to alert drivers
(ix) Urban areas
In addition to the above locations the following locations shall have continuous Highway
Lighting.

Sr.
Locations Stretches Remarks
No.
Stretches along Highway from Minimum 300
start to end of approaches of all number of
Service Areas (Way side Locations as given in this two arm
1
amenities, Truck Parking and Schedule C electrical
Smaller parking places with toilet poles shall be
facilities) provided
Minimum level of illumination on locations of the Project Highway where exterior
lighting is provided shall be 40 lux. In general, ‘code of practice for lighting of
public thoroughfare IS:1944 shall be followed. All facility buildings shall be
illuminated adequately.

The lighting fittings (with LED features) shall be powered by solar system with
back up facilities (power and battery both) at all locations.

The solar system will be used for the entire highway. The solar panel at
interchange toll Booths and bridges shall be grid connected whereas the other
places shall be battery backup. The electrical connection with all its
infrastructures shall be done by the Concessionaire/ Concessionaire. Additional
battery backup shall be provided.

2.7 Environmental Management Plan Nil

2.8 Land Scaping and Tree Plantation

The Concessionaire shall plant trees and shrubs of required numbers and types at the
appropriate locations within Right of Way and in the land earmarked by the Authority for
afforestation as per Schedule D at the following areas.
Sl. Types of
Location (Km) Remarks
No. Plantation
In median except
1 Shrubs Ornamental type plantation shall be provided
Structures
All interchanges/
Land Service Areas / Toll
2 Ornamental type plantation shall be provided
Scaping Booths / O & M
Centers
Minimum 35000 nos. of trees of desired type
in two rows @5 m c/c near edge of ROW on
Available open land both side and three rows @5 m c/c on central
3 Plantations
within ROW median (As per Schedule D) preferably local
varieties like mango, Neem, Sheesham, Babul,
Peepal etc. shall be planted
Drip irrigation system for median plantation by gravity/pressure sources with all
necessary components / systems and emitting devices at plants shall be provided.
The Concessionaire shall maintain the trees and shrubs in good condition during
maintenance period as per the maintenance schedule.

2.9 Advanced Traffic Management System (ATMS)

Advanced Traffic Management System (ATMS) shall be provided as per Schedule D and
NHAI policy circular technical 214/2016 Dt. 15.09.2016.

2.10 Rain Water Harvesting

As per Ministry of Environment and Forests Notification, New Delhi dated 14.01.1997 (as
amended on 13.01.1998, 05.01.1999 & 6.11.2000), the construction of rain water
harvesting structure is mandatory in and around Water Crisis area, notified by the Central
Ground Water Board. The provision of rain water harvesting shall be provided at every
500m in the entire project length and shall be executed as per requirement of IRC SP: 42-
2014 and IRC SP: 50-2013.

1.2 Utilities

Provision of accommodating utilities shall be made within utility corridor on either side of
Project Highway. Provision for crossing of Utility duct shall be provided as per manual.