Inspection and Test Plan (Reinforced Concrete Column Construction)

This document outlines the inspection and test plan for reinforced concrete column construction in Phase IV of the Jabal Omar Development project. It details the approvals required prior to work commencement, including shop drawings, material submittals, method statements, and permits. It also lists the inspections and tests to be conducted during construction, such as setting out, reinforcement installation, formwork fixation, concrete ordering and casting, and formwork removal. The main consultant, EHAF, and main contractor, RUWAD Civil Construction, are responsible for reviewing, approving, inspecting and randomly checking various stages of the work.

Uploaded by

ray
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
1K views

Inspection and Test Plan (Reinforced Concrete Column Construction)

This document outlines the inspection and test plan for reinforced concrete column construction in Phase IV of the Jabal Omar Development project. It details the approvals required prior to work commencement, including shop drawings, material submittals, method statements, and permits. It also lists the inspections and tests to be conducted during construction, such as setting out, reinforcement installation, formwork fixation, concrete ordering and casting, and formwork removal. The main consultant, EHAF, and main contractor, RUWAD Civil Construction, are responsible for reviewing, approving, inspecting and randomly checking various stages of the work.

Uploaded by

ray
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

JABAL OMAR DEVELOPMENT

INSPECTION AND TEST PLAN


PROJECT- PHASE IV
ZONE S09, S10 AND S11 (REINFORCED CONCRETE COLUMN CONSTRUCTION)

WORK SCOPE Fixing of reinforcement, supply and installation of formwork, pouring for CONCRETE COLUMN
MAIN CONSULTANT EHAF
MAIN CONTRACTOR RUWAD CIVIL CONSTRUCTION

PART 1- APPROVALS REQUIRED PRIOR TO COMMENCEMEN OF THE WORKS

Item Frequency of Hold, or Witness Point


Description of Operation/Inspection, Test and Approval Records Generated
No. Inspection & Test Plan Subcont. RCC EHAF
Approved Shop
1 Shop Drawings- Civil & Structural, MEP Once Sub* R R&A
Drawings
Materials Submittals- Concrete Mix, Reinforcement, Mill Certificate, Mix
2 Embedded Pipes, Curing Compound, Concrete Repair Once Design, Data Sheets, Sub R R&A
Materials, PVC Spacers, Couplers Batch Certificates
3 Method Statement, Inspection & Test Plan, Check List Once MS, ITP, CL Sub R R&A
Approved Drawings,
4 Survey reference and Bench Marks (drawings) Once Sub** R R&A
Control Point
Permits, Licenses, NOC’s and Authority Approvals if
5 Once Approval of work Sub** R R&A
required
Note*- All deviation from the approved drawings/documents to be recorded and discussed with the Main Consultant prior to
proceeding. * Other subcontractor/sub consultant engaged by RCC. ** By RCC

Page 1 of 2
JABAL OMAR DEVELOPMENT
INSPECTION AND TEST PLAN
PROJECT- PHASE IV
ZONE S09, S10 AND S11 (REINFORCED CONCRETE COLUMN CONSTRUCTION)

PART 2- INSPECTION AND TEST DURING CONSTRUCTION OF WORKS- CONCRETE COLUMN

Item Frequency of Hold, or Witness Point


Description of Operation/Inspection, Test and Approval Records Generated
No. Inspection & Test Plan Subcont. RCC EHAF
Prior to start the
1 Setting out- Alignment, Orientation, level IR, Survey Report H H RC
Rebar & Formwork
Steel Reinforcement Installation- Overlap, coupler, bar
2 By Area/Layout IR/CL H H S
sizes, bar marks, bars position/arrangement
3 Embedded MEP items installation By Area/Layout IR/CL H H S
Formwork Fixation- Form Release Agent Application,
4 By Area/Layout IR/CL H H S
Setting out, Verticality, Dimension, Supports
Consultant Inspection and Approval for
5 By Area/Layout IR H H I&A
Reinforcement, MEP and Formworks prior to casting
Concrete Order and Casting- Sampling: Slump/Flow, Delivery notes, Pour
6 By Area/Layout H H RC
Temperature, Compressive Strength Record
Shutter/Formwork Removal- Release and removal of
7 shutter and props are as per required in the By Area/Layout Deshuttering record H H S
specification.
Abbreviations: Sub- SUBMIT, H- HOLD, R&A- REVIEW & APPROVE, RC- RANDOM CHECK, I&A- INSPECT & APPROVE, S- SURVEILANCE,
CL= CHECKLIST, IR- INSPECTION REQUEST