Orange County Utilities Standards and Construction Specifications Manual
Orange County Utilities Standards and Construction Specifications Manual
TABLE OF CONTENTS
February 11, 2011
PREFACE
CHAPTER 1 GENERAL INFORMATION
1110 ...........Introduction
1111 ...........Policies and Procedures
1112 ........... Definitions
1113 ........... Abbreviations
CHAPTER 2 GENERAL REQUIREMENTS AND DESIGN STANDARDS
2100 General
2110 ........... General Design Requirements
2111 ...........Project Documents and Submittals
2112 ........... Aerial Crossings
2113 ........... Directional Drilling
2114 ...........Jack and Bore
2200 Water
2210 ........... Water Main Design Standard
2300 Wastewater Collection
2310 .......... Gravity Main Design Standard
2311 ........... Wastewater Force Main Design Standard
2400 Wastewater Pump Stations
2410 ........... Wastewater Pump Station Design Standard
2500 Reclaimed Water
2510 ........... Reclaimed Water Main Design Standard
CHAPTER 3 CONSTRUCTION SPECIFICATIONS
3100 General
3110 ........... General Construction Requirements
3111 ........... Project Record Documents and Submittals
3112 ........... Site Preparations, Surface Removal, and Restoration
3113 ........... Excavations, Backfill, Compaction and Grading
3114 ........... Installation of Pipe
3115 ........... Directional Drilling
3116 ........... Jack and Bore
3117 ........... System Connections
3118 ........... Aerial Crossings
3119 ........... Coatings and Linings
3200 Water
3210 ........... Water Pipes, Valves, and Appurtenances
3300 Wastewater Collection
3310 ........... Wastewater Pipes, Valves, and Appurtenances
3311 ........... Wastewater Manholes
3312 ........... Collection System Bypass
Table of Contents
i of iii
Orange County Utilities
STANDARDS AND CONSTRUCTION SPECIFICATIONS MANUAL
TABLE OF CONTENTS
February 11, 2011
APPENDIX B FORMS
Pump Station Start-Up ........................................................................................................ B101
Water Main Disinfection Certification ............................................................................ B102
System Connection.......................................................................................................... B103
Pressure Test ....................................................................................................................... B104
Conveyance of Easement and Fee Simple Property .......................................................... B105
Bill of Sale (Water and Water Reclamation) ...................................................................... B106
Digital Data Submission .................................................................................................... B108
Table of Contents
ii of iii
Orange County Utilities
STANDARDS AND CONSTRUCTION SPECIFICATIONS MANUAL
TABLE OF CONTENTS
February 11, 2011
Table of Contents
iii of iii