Detail of Clean Out: Vertical To Horizontal Cleanout Floor Cleanout Ceiling Cleanout
Detail of Clean Out: Vertical To Horizontal Cleanout Floor Cleanout Ceiling Cleanout
55
0.55
MANHOLE
5-10 mm ∅ RSB
4" Ø uPVC PIPE
EQUALLY SPACED
DETAIL OF CLEAN OUT BOTHWAYS
CEMENT PLASTER FIN.
D DIGESTIVE LEACHING
D
CHAMBER CHAMBER
SLUDGE 3-12mmØ CONT. BARS
SPACED AS SHOWN
10mmØ RSB @
200mm ON CENTER
PEA GRAVEL
SECTION
D
PROVIDE ANGULAR
PLAN PLAN CB 01= 400 MM EDGINGS C
L R.C. COVER WITH
LIFTING HANDLE
100 100
25mmØ TERMITE
SUPPLY LINE
C CAST IRON GRATING
L
450mm MIN.(VARIES)
COVER
100
DETAIL OF HORIZONTAL PIPE HANGER 50mmØ
CB 01= 400 MM
DS
DP
50
100
200
80
CAST IRON GRATING
COVER MODEL PLAN
SECTION
GENERAL NOTES:
1. ALL WORKS SLOPES AND SIZES HEREIN MUST CONFORM WITH THE
PLUMBING LEGEND: PROVISIONS OF THE LATEST EDITION OF THE NATIONAL PLUMBING CODE,
THE EXISTING LOCAL ORDINANCE, THE RULES AND REGUALTIONS OF THE
SYMBOL DESCRIPTION SYMBOL DESCRIPTION
LOCAL ENFORCING AUTHORITIES AND REQUIREMENT OF THE LOCAL WATER
F FAUCET SD SHOWER DRAIN AND SEWAGE COMPANY.
LF LAVATORY FAUCET VSTR VENT STACK THRU ROOF
SECTION KSF KITCHEN SINK FAUCET WC WATER CLOSET 2. ALL WATER SUPPLY PIPES SHOULD BE OF STANDARD GAUGE.
FD FLOOR DRAIN CB CATCH BASIN GALVANIZED IRON OR STANDARD PB OR PVC MATERIAL.
WCV WATER CLOSET VENTILATION CHECK VALVE 4. ALL VENTILATION PIPES SHALL BE EXTENDED AT
LEAST 0.10m (4") ABOVE THE ROOF.
REPUBLIC ACT 9266 SANITARY ENGINEER PROJECT TITLE OWNER revisions SHEET CONTENT SHEET NUMBER