This document provides guidance on: 1) Submission of certificates of completion and applications for occupation permits upon completion of building works. 2) Submission of record plans showing the completed building, including plans previously approved with amendments. 3) Submission of a schedule of building materials and products used to construction to confirm compliance with regulations.

Uploaded by

Jacky_LEOLEO
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
66 views

APP013

This document provides guidance on: 1) Submission of certificates of completion and applications for occupation permits upon completion of building works. 2) Submission of record plans showing the completed building, including plans previously approved with amendments. 3) Submission of a schedule of building materials and products used to construction to confirm compliance with regulations.

Uploaded by

Jacky_LEOLEO
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 13

Practice Note for Authorized Persons,

Buildings Department Registered Structural Engineers and APP-13


Registered Geotechnical Engineers

Submission of Certificate of Completion of Building Works,


Application for Occupation Permit
and Submission of Record Plans and Information

Submission of Certificate of Completion of Building Works

Upon the completion of building works, a certificate of completion of


building works not resulting in a new building (Form BA14/14A and/or Form MW02/04)
or resulting in a new building (Form BA12/13) should be submitted in accordance with
regulation 25 of the Building (Administration) Regulations (B(A)R). While there is no
statutory time limit under the Buildings Ordinance (BO) for processing such certificates,
the Buildings Department (BD) will generally provide a reply to Form BA14/14A within
28 days, advising the acceptance of the completed works or the outstanding issues to be
rectified. As a certificate of completion of new buildings and application for an
occupation permit (OP) are usually submitted together in Form BA12/13, they will be
processed together within 14 days in accordance with section 21 of the BO.

2. If the same contractor is employed for both the foundation works and the
superstructure works for a new building or in the alteration and addition (A&A) works to
an existing building, where spread footing foundation with excavation depth not
exceeding 4.5m is adopted, the certification of completion of both the spread footing and
superstructure works in such cases may be made in the Form BA12/13 or a single Form
BA14, as the case may be, and a separate Form BA14 for completion of the spread footing
works is not required.

Simultaneous Submission of Amended Building Plans and Application for OP

3. A Form BA12/13 is sometimes submitted at or about the same time as the


submission of amended plans for approval. This would complicate the processing of an
application for OP. In line with the declaration in the Form BA12/13 that the new
building has been erected in accordance with the plans approved, the Building Authority
(BA) takes the view that authorized persons (AP) / registered structural engineers (RSE) /
registered geotechnical engineers (RGE) should submit and secure approval of
amendment plans in advance of an application for OP. The exception is that minor
positional deviations from the approved plans which do not contravene the BO and its
subsidiary regulations may be acceptable.

Submission of Record Plans

4. Where several alterations have been made to the original design, the BA
may require, under regulation 46 of the B(A)R, the submission of “new plans” showing
the building as completed.

/5. …
-2-

5. For those projects (including A&A works) with amendments to the


original approved building plans have subsequently been approved, the AP should submit
a set of general building plans when applying for OP and submitting Form BA14 for A&A
works, amalgamating all the plans approved by the BA and thereby representing the
building/A&A works as completed. Each of those plans should bear either the signed
and dated approval chop applied by the BA or a chop giving the AP’s personal
certification of the plans being identical to those approved by the BA on the date specified.
To limit the volume of paper, the BA would accept plans photographically reduced to not
less than a ratio of 1:200.

6. Record plans should not contain any amendments which have not been
approved.

7. In addition, the Rating and Valuation Department (RVD) has requested


that for all newly completed buildings and completed A&A works, one set of record plans
be supplied to them for rating purposes. As record plans are now mostly produced from
computer software such as AutoCAD or Microstation which could effectively shorten the
processing time and assure the accuracy of the valuation work of RVD, AP are
encouraged to submit a CD-ROM containing the softcopy of the record plans in
AutoCAD or Microstation format and marked “CD-ROM containing plans for RVD” at
the front in addition to the required paper copy for onward transmission to RVD. RVD
has committed that the record plans will only be used for relevant rating purposes and
will not be released to other Departments or parties.

Submission of Schedule of Building Materials and Products

8. Under the BO, the AP, RSE, RGE and registered contractor (RC) have
responsibilities to supervise building works including the selection and application of
building materials and to certify compliance with relevant provisions of the BO upon
completion of works. To expedite the processing of an application for OP, the BA
requires the submission of a schedule under regulation 44 of the B(A)R, confirming the
use of accepted building materials and products in construction.

9. The schedule should be submitted with an application for OP. The AP


should confirm and certify in the schedule that the application and performance of
building materials and products are in compliance with the relevant provisions of the BO
and its subsidiary regulations and the RC should confirm the use of those building
materials and products in construction. Except for regularly used building materials, the
schedule should cover all materials and products not specified on the approved plans, the
application of which would involve the structural integrity and fire safety of the building,
and the cast iron pipes and fittings as stipulated in Practice Note for Authorized Persons,
Registered Structural Engineers and Registered Geotechnical Engineers (PNAP) APP-
133. Where appropriate, a schedule should be submitted on completion of A&A works
not resulting in a new building or minor works. Sample schedules for building works
and minor works are provided at Appendices A and B respectively.

/10. …
-3-

10. Where the building works involve the installation of fire dampers, the
fire dampers may be installed by the registered general building contractor (RGBC) of
the project and a registered specialist contractor in the ventilation works category
(RSC(V)) appointed for such purpose. Furthermore, under the Minor Works Control
System, erection or alteration of a fire damper in a ventilation system of an existing
building is designated as minor works, which may be carried out under the simplified
requirements as an alternative to obtaining approval and consent under the BO.
Reference can be made to Schedule 1 of the Building (Minor Works) Regulation and
PNAP APP-147 respectively.

11. For fire dampers installed by RGBC/registered minor works contractor


(RMWC), a RSC(V) should be engaged to inspect and certify that the fire dampers are in
safe and efficient working order pursuant to Clause E8.3 of the Code of Practice for Fire
Safety in Buildings 2011. For fire dampers installed by RSC(V), the same RSC(V)
could inspect and certify the fire dampers. The AP/RMWC in submitting the
certification on fire dampers should include an inspection certificate on fire dampers by
RSC(V).

( YU Tak-cheung )
Building Authority

Ref. : BD GP/BORD/10 (VI)


BD GR/BORD/93 (II)
BD GR/OP/4/M
BD GR/OA/177

This PNAP is previously known as PNAP 53


First issue July 1978
Last revision November 2019
This revision October 2020 (AD/NB1) (Paragraphs 10 & 11, Appendix B and
Annex B.1 amended)
宸Քъ‫א‬澝孧⡉佖㵊ٖस㍃Ղ
孧⡉㇟֥ٖस㍃Ҁ㳰❹ি
PNAP

APP-13
宸Ք‫ݪࢢ䷨ڎ‬ո䟖ռ屴‫ރ‬㫜
Certificate of Accepted Building Materials and Products
ଡ଼捦Appendix A
•寶љ࠳ࠠ‫׊‬ㅶͫ◅֨惨䠞‫ࠀސ‬⡦ԆЇ澪ɰ 澫垹澞‫׊‬ㅶӹͫ寶伶旭澦ࡨ۞з柾澧澞
‡5HDGWKH³0DWWHUVWR1RWH´FRPSOHWHLQ%/2&./(77(56DQGWLFNWKHDSSURSULDWHER[HV

৩‫䷨ڎ‬ж⥍䥮इ To the Building Authority


䟣଑ ࣒宸Քъ‫ߟא‬屴
Part A To be Certified by Authorized Person
ं宸Օы‫׊ב‬ㅶ
7REHFRPSOHWHGE\WKHDXWKRUL]HGSHUVRQ

‫و‬؋০㸠垹%'5HI1R 朅慧֪֭ ҁ宸‫ݶ‬朅慧Фऀ朅‫׿‬ղс惨ऀ
 )RUDFNQRZOHGJHPHQWHPDLO HVXEPLVVLRQ 
(PDLO$GGUHVV
BD

䤚‫֪ي‬䥰֪֭‫۪⥺ݷ‬Ԇ‫ٗڏ‬३ङѹ৥
$GGUHVVRI'HYHORSPHQW6LWH/RFDWLRQRI$OWHUDWLRQDQG$GGLWLRQ:RUNV






1 ߎы䎹宸Օы‫ͫב‬䛂䬢宸Їଚ‫ٗ䷨ڏ‬३ܶ‫ऀ҅ޢ‬宸Օङ‫މ࣒䷨ڏ‬չ䟗ս澞ߎы◅҉㤜澦‫࣒ͧ䷨ڏ‬঒ࣲͨ嫅҆澧আ㱃ङ嫅ؔͫ࠳‫܅ڔ‬乗۱ ⼋஍ङ‫䷨ڏ‬
࣒‫މ‬չ䟗ս‫ޢ‬伶੮ͧ஍ў'Ճ'ͨ澞
,DXWKRUL]HGSHUVRQFRQILUPWKDWDFFHSWHGEXLOGLQJPDWHULDOVDQGSURGXFWVKDYHEHHQVSHFLILHGLQWKHDERYHEXLOGLQJFRQVWUXFWLRQ3XUVXDQWWR
UHJXODWLRQRIWKH%XLOGLQJ $GPLQLVWUDWLRQ 5HJXODWLRQV,GXO\HQGRUVHWKHDWWDFKHG6FKHGXOHRI%XLOGLQJ0DWHULDOVDQG3URGXFWV $QQH[HV$ 
$ 

2 ߎы䛂屴‫ͫޢ‬۱ ⼋஍‫ޢ‬伶੮Иӧ‫ޢ‬ङ‫މ࣒䷨ڏ‬չ䟗սͫ߿㤜ब昘ङ‫࣒䷨ڏ‬嫅֮҆ͫ㇕宸Օ䟗սͫߎыㆎ实ঈ䟗սङ㚙ऀչ‫ݼ‬ਈ۟ӱ䈏۞澞
,KHUHE\FHUWLI\WKDWWKHEXLOGLQJPDWHULDOVDQGSURGXFWVOLVWHGLQWKHDWWDFKHG6FKHGXOHDUHDFFHSWDEOHSURGXFWVXQGHUUHOHYDQWEXLOGLQJUHJXODWLRQV
DQGWKDW,DPVDWLVILHGZLWKWKHDSSOLFDWLRQDQGSHUIRUPDQFHRIWKHVHSURGXFWV



宸Քъ‫א‬嶾‫ݪ‬ 
Details of the Authorized Person 
И‫׸ކ‬դ 1DPHLQ&KLQHVH  ‫ࡆ׸‬ү੧ 6XUQDPHILUVW 孧⡹屴‫ޢ‬㫮修垹&HUWLILFDWHRI5HJLVWUDWLRQ1XPEHU 
 

 AP( ) 
 
ਸ਼‫׸ކ‬դ 1DPHLQ(QJOLVK  ‫ࡆ׸‬ү੧ 6XUQDPHILUVW 孧⡹ㆶ䈏‫'ߊޙ‬DWHRI([SLU\RI5HJLVWUDWLRQ 
 
 
 ‫ޙ‬GG ߃PP ‫\\\\ٶ‬
宸Օы‫ב‬乗০
6LJQDWXUHRIWKH$XWKRUL]HG3HUVRQ 
ѠѾ‫ע‬ㅲ߾屴۪利‫ޢ‬Օ‫ږ‬ਚࡣ‫گ‬੧⥺澞
$Q\IDOVHFHUWLILFDWLRQRUGHFODUDWLRQ
PD\EHVXEMHFWWROHJDODFWLRQ

‫'ߊޙ‬DWH


‫ޙ‬GG ߃PP ‫\\\\ٶ‬

߿㤜孧⡹孄捦
,QDFFRUGDQFHZLWKWKHUHJLVWUDWLRQUHFRUG
宸Օы‫ב‬澝孧⡹佖㵜ٗ३㍳Ճ孧⡹㈏֦ٗ३㍳ҁ㴂➩ৰ$33஍捦$31$3$33 $SSHQGL[$   3
▲଑ ࣒孧⡉۩‫ߟ֋ڎ‬屴 
Part B To be Certified by the Registered Contractor
ं孧⡹‫׊֌ڏ܈‬ㅶ
7REHFRPSOHWHGE\WKHUHJLVWHUHGFRQWUDFWRU

 
‫و‬؋০㸠垹(*8KL4U      䤚‫֪ي‬䥰֪֭‫۪⥺ݷ‬Ԇ‫ٗڏ‬३ङѹ৥
BD  'JJXKYYUL*K\KRUVSKTZ9OZK2UIGZOUTUL'RZKXGZOUTGTJ
 'JJOZOUT=UXQY
 
 
 
 
孧⡉۩‫֋ڎ‬嶾‫ݪ‬

Details of the Registered Contractor 
䙃݉㺖乗০ы‫׸‬դИ‫ކ‬1DPHRI$XWKRUL]HG6LJQDWRU\ &KLQHVH 
И‫ކ‬դ䱺 1DPHLQ&KLQHVH 

 
 

䙃݉㺖乗০ы‫׸‬դਸ਼‫ކ‬1DPHRI$XWKRUL]HG6LJQDWRU\ (QJOLVK 
ਸ਼‫ކ‬դ䱺 1DPHLQ(QJOLVK 



 孧⡹‫֌ڏ܈‬桗⣫ 7\SHRI5HJLVWHUHG&RQWUDFWRU
孧⡹屴‫ޢ‬㫮修垹 &HUWLILFDWHRI5HJLVWUDWLRQ1XPEHU  孧⡹▲ਢ‫֌ڏ܈䷨ڏ‬
 5HJLVWHUHG*HQHUDO%XLOGLQJ&RQWUDFWRU
 孧⡹ㆋ於‫ͫ֌ڏ܈‬桗⣫͹
 5HJLVWHUHG6SHFLDOLVW&RQWUDFWRUFDWHJRU\
孧⡹ㆶ䈏‫' ߊޙ‬DWHRI([SLU\RI5HJLVWUDWLRQ 


‫ޙ‬GG ߃PP ‫\\\\ٶ‬


ߎы۩✰䎹孧⡹‫ͫ֌ڏ܈‬䛂䬢宸۱⼋஍‫ޢ‬伶੮Иӧ‫ޢ‬ङ宸Օ‫މ࣒䷨ڏ‬չ䟗սͫٝ֨Їଚ‫ٗ䷨ڏ‬३И҅ऀՃ惨䠞㚙ऀ澞
,:HUHJLVWHUHGFRQWUDFWRUKHUHE\FRQILUPWKDWWKHDFFHSWHGEXLOGLQJPDWHULDOVDQGSURGXFWVOLVWHGLQWKHDWWDFKHG6FKHGXOHKDYHEHHQXVHGDQG
SURSHUO\DSSOLHGLQWKHDERYHEXLOGLQJFRQVWUXFWLRQ


孧⡹‫֌ڏ܈‬乗০
6LJQDWXUHRIWKH5HJLVWHUHG&RQWUDFWRU 


ѠѾ‫ע‬ㅲ߾屴۪利‫ޢ‬Օ‫ږ‬ਚࡣ‫گ‬੧⥺澞
$Q\IDOVHFHUWLILFDWLRQRUGHFODUDWLRQ
PD\EHVXEMHFWWROHJDODFWLRQ

‫'ߊޙ‬DWH


‫ޙ‬GG ߃PP ‫\\\\ٶ‬

߿㤜孧⡹孄捦
,QDFFRUGDQFHZLWKWKHUHJLVWUDWLRQUHFRUG
宸Օы‫ב‬澝孧⡹佖㵜ٗ३㍳Ճ孧⡹㈏֦ٗ३㍳ҁ㴂➩ৰ$33஍捦$31$3$33 $SSHQGL[$   3
▏଑ ࣒孧⡉ㅛ於۩‫ૹͣ֋ڎ‬梏ॸ佷ٖस桗⢻ͤߟ屴
Part C To be Certified by Registered Specialist Contractor in the Ventilation Works Category
ं孧⡹ㆋ於‫ͧ֌ڏ܈‬ପ梏঩佷ٗ३桗⣫ͨ‫׊‬ㅶ
7REHFRPSOHWHGE\WKHUHJLVWHUHGVSHFLDOLVWFRQWUDFWRULQWKHYHQWLODWLRQZRUNVFDWHJRU\

‫و‬؋০㸠垹%'5HI1R      䤚‫֪ي‬䥰֪֭‫۪⥺ݷ‬Ԇ‫ٗڏ‬३ङѹ৥
BD 'JJXKYYUL*K\KRUVSKTZ9OZK2UIGZOUTUL'RZKXGZOUTGTJ
'JJOZOUT=UXQY





孧⡉ㅛ於۩‫ૹͣ֋ڎ‬梏ॸ佷ٖस桗⢻ͤ嶾‫ݪ‬
Details of the Registered Specialist Contractor in the Ventilation Works Category
И‫ކ‬դ䱺 1DPHLQ&KLQHVH  䙃݉㺖乗০ы‫׸‬դИ‫ކ‬1DPHRI$XWKRUL]HG6LJQDWRU\ &KLQHVH 
 
 
 
ਸ਼‫ކ‬դ䱺 1DPHLQ(QJOLVK  䙃݉㺖乗০ы‫׸‬դਸ਼‫ކ‬1DPHRI$XWKRUL]HG6LJQDWRU\ (QJOLVK 





孧⡹屴‫ޢ‬㫮修垹 &HUWLILFDWHRI5HJLVWUDWLRQ1XPEHU 




孧⡹ㆶ䈏‫' ߊޙ‬DWHRI([SLU\RI5HJLVWUDWLRQ 


‫ޙ‬GG ߃PP ‫\\\\ٶ‬

ߎы۩✰䎹孧⡹ㆋ於‫ͧ֌ڏ܈‬ପ梏঩佷ٗ३桗⣫ͨͫ㧠Јଚ؏ۨ㸮߲‫ߊޙ‬ٝ‫؍ؼ‬娙֨Їଚ‫ٗ䷨ڏ‬३Иङ࠿▲✫அࢮ㤏ߡ悹੧㸮߲澞ߎы۩✰䛂屴‫ޢ‬
߿㤜澦‫ࢃ࣒䷨ڏ‬அ‫؍‬Ҷ،⤄澧আ+㱃ͫ۱߄悤пஅࢮ㤏ߡ֮垰㧠‫؍‬
Ҷչ߄‫ݼ‬ङ‫ݱ‬ҁ䖚㘟澞
,:HUHJLVWHUHGVSHFLDOLVWFRQWUDFWRULQWKHYHQWLODWLRQZRUNVFDWHJRU\KDYHLQVSHFWHGHYHU\ILUHGDPSHULQVWDOOHGLQWKHDERYHEXLOGLQJ
FRQVWUXFWLRQRQWKHIROORZLQJFRPSOHWLRQGDWHRILQVSHFWLRQDQGKHUHE\FHUWLI\WKDWDOOWKHILUHGDPSHUVDUHLQVDIHDQGHIILFLHQWZRUNLQJRUGHU
SXUVXDQWWR&ODXVH(RIWKH&RGHRI3UDFWLFHIRU)LUH6DIHW\LQ%XLOGLQJV

ߎы۩✰䎹孧⡹ㆋ於‫ͧ֌ڏ܈‬ପ梏঩佷ٗ३桗⣫ͨͫ䛂䬢宸۱⼋஍‫ޢ‬伶੮ӧ‫ޢ‬ङஅࢮ㤏ߡͫٝ֨Їଚ‫ٗ䷨ڏ‬३И‫״‬䠞‫؍‬娙澞ߎы۩✰㧠Јଚ؏ۨ㸮
߲‫ߊޙ‬ٝ‫؍ؼ‬娙֨Їଚ‫ٗ䷨ڏ‬३Иङ࠿▲✫அࢮ㤏ߡ悹੧㸮߲澞ߎы۩✰䛂屴‫߿ޢ‬㤜澦‫ࢃ࣒䷨ڏ‬அ‫؍‬Ҷ
،⤄澧আ+㱃ͫ۱߄悤пஅࢮ㤏ߡ֮垰㧠
‫؍‬Ҷչ߄‫ݼ‬ङ‫ݱ‬ҁ䖚㘟澞
,:HUHJLVWHUHGVSHFLDOLVWFRQWUDFWRULQWKHYHQWLODWLRQZRUNVFDWHJRU\KHUHE\FRQILUPWKDWWKHILUHGDPSHUVOLVWHGLQWKHDWWDFKHG6FKHGXOHKDYH
EHHQSURSHUO\LQVWDOOHGLQWKHDERYHEXLOGLQJFRQVWUXFWLRQ,:HKDYHLQVSHFWHGHYHU\ILUHGDPSHUVLQVWDOOHGLQWKHDERYHSUHPLVHVRQWKHIROORZLQJ
FRPSOHWLRQGDWHRILQVSHFWLRQDQGKHUHE\FHUWLI\WKDWDOOWKHILUHGDPSHUVDUHLQVDIHDQGHIILFLHQWZRUNLQJRUGHUSXUVXDQWWR&ODXVH(RIWKH
&RGHRI3UDFWLFHIRU)LUH6DIHW\LQ%XLOGLQJV

؏ۨ㸮߲‫ߊޙ‬
&RPSOHWLRQ'DWHRI,QVSHFWLRQ


‫ޙ‬GG ߃PP ‫\\\\ٶ‬

孧⡹ㆋ於‫ͧ֌ڏ܈‬ପ梏঩佷ٗ३桗⣫ͨ乗০
6LJQDWXUHRIWKH5HJLVWHUHG6SHFLDOLVW&RQWUDFWRULQWKH
9HQWLODWLRQ:RUNV&DWHJRU\ 


ѠѾ‫ע‬ㅲ߾屴۪利‫ޢ‬Օ‫ږ‬ਚࡣ‫گ‬੧⥺澞
$Q\IDOVHFHUWLILFDWLRQRUGHFODUDWLRQ
PD\EHVXEMHFWWROHJDODFWLRQ

‫'ߊޙ‬DWH

 

‫ޙ‬GG ߃PP ‫\\\\ٶ‬

߿㤜孧⡹孄捦
,QDFFRUGDQFHZLWKWKHUHJLVWUDWLRQUHFRUG
宸Օы‫ב‬澝孧⡹佖㵜ٗ३㍳Ճ孧⡹㈏֦ٗ३㍳ҁ㴂➩ৰ$33஍捦$31$3$33 $SSHQGL[$   3
ࡉ‫ڿ‬ж柾 Matters to Note

 ѠѾы‫ײ‬ҁӟ垵ҝ利‫੽୍ؼ۪ޢ‬з柾ҁӟ‫ע‬ㅲ暒ଚԯ㇕嬥ࣘӥз৤੧ͫ $Q\SHUVRQPDNLQJDIDOVHGHFODUDWLRQRUPLVUHSUHVHQWLQJDPDWHULDOIDFW
Օਈ㫵ੴ㸮‫ݏ‬澞 VKDOOEHJXLOW\RIDFULPLQDORIIHQFHDQGVXEMHFWWRSURVHFXWLRQ

䟣⛻ъ嶾‫ݪ‬ A. Personal Data

‫ࣩࣹࣩ୳ݗ‬ Purposes of Collection
 ‫و‬؋০㫵҅ऀଥ惐ߎ੮ࠀ۱䙃‫ڱ‬ङ✫ы嶾‫މ‬ҁЈӧऀନ͹ 7KHSHUVRQDOGDWDSURYLGHGE\PHDQVRIWKLVIRUPZLOOEHXVHGE\WKH
G垰ࣲ҂֨ߎ੮ࠀИ۱ղсङ‫ކ‬ўङब昘з⥽ͺ %XLOGLQJV'HSDUWPHQWIRUWKHIROORZLQJSXUSRVHV
H垰ࣲ߄昘Їଚ㤭悹੧ٗ३澝澦‫࣒䷨ڏ‬㱃҆澧Ճ߄昘ࡣ҆ङब昘з⥽ͺ D DFWLYLWLHVUHODWLQJWRWKHSURFHVVLQJRI\RXUVXEPLVVLRQLQWKLVIRUP
E DFWLYLWLHVUHODWLQJWRWKHDERYHSURSRVHGZRUNVDQGDGPLQLVWUDWLRQRIWKH
Ճ
%XLOGLQJV2UGLQDQFHDQGRWKHUOHJLVODWLRQVDQG
I‫ސ‬Ҏ‫و‬؋০厠҂刦佧澞
F IDFLOLWDWLQJFRPPXQLFDWLRQEHWZHHQWKH%XLOGLQJV'HSDUWPHQWDQG
 ҂‫ڷ‬栁‫ߎ҈ݕ‬੮ࠀ۱੽ࡌङ✫ы嶾‫މ‬澞ҝ‫ײ‬҂ߌਈ‫҈ݕ‬۱஬嶾‫ͫމ‬Օਈ \RXUVHOI
㆏ਚ垰ࣲ҂۱ղсङ‫ކ‬ў㩌ӟ䛂‫ڍ‬寏۪ͫࣾਙ㆏ਚ䐘ࡣ垰ࣲ҂ङः寶澞 
,WLVREOLJDWRU\IRU\RXWRSURYLGHWKHLQIRUPDWLRQDVUHTXLUHGLQWKHIRUP,I
䙂怍р嶾‫ࣩݪ‬଑於ъ‫א‬ \RXIDLOWRSURYLGHWKHUHTXLUHGGDWDGHOD\PD\EHFDXVHGLQSURFHVVLQJRI
 ߎ০Օਈ㫵էҿѕ‫ୂڄݺ‬於澝㿙ঌ‫ق‬澝㷬㵜۪ѠѾы‫ܖב‬ர҂ଥ惐ߎ੮ \RXUVXEPLVVLRQRUHYHQUHVXOWLQUHMHFWLRQRIWKHDSSOLFDWLRQ
ࠀ۱‫҈ݕ‬ङ✫ы嶾‫ͫމ‬љҁЇଚআ࠼۱ӧङऀନ澞 Classes of Transferees
ॺ旭⛻ъ嶾‫ݪ‬ 7KHSHUVRQDOGDWD\RXSURYLGHGE\PHDQVRIWKLVIRUPPD\EHGLVFORVHGWR
RWKHUJRYHUQPHQWGHSDUWPHQWVEXUHDX[RUJDQLVDWLRQVRUDQ\SHUVRQVIRU
 ߿㤜澦✫ы嶾‫ͧމ‬ड़曆ͨ㱃҆澧ͫ҂߄㺖߲旭Ճ‫࠳ݷ‬҂۱‫ݕ‬сङ✫ы嶾
WKHSXUSRVHVPHQWLRQHGLQSDUDJUDSKDERYH
‫މ‬澞‫و‬؋
০߄㺖‫߄ؼ‬昘嶾‫މ‬ফ旭ङ੽ࡌ‫ݶ‬Ոՠࣲ嶲ऀ澞‫߲ࡌ੽ײ‬旭Ճ‫ݷ‬
࠳҂ङ✫ы嶾‫ͫމ‬寶厠‫و‬؋০刦佧澞 Access to Personal Data
<RXKDYHWKHULJKWRIDFFHVVDQGFRUUHFWLRQZLWKUHVSHFWWRWKHSHUVRQDO
GDWDDVSURYLGHGXQGHUWKH3HUVRQDO'DWD 3ULYDF\ 2UGLQDQFH 7KH
%XLOGLQJV'HSDUWPHQWKDVWKHULJKWWRFKDUJHDUHDVRQDEOHIHHIRUWKH
SURFHVVLQJRIDQ\GDWDDFFHVVUHTXHVW5HTXHVWIRUSHUVRQDOGDWDDFFHVV
DQGFRUUHFWLRQVKRXOGEHDGGUHVVHGWRWKH%XLOGLQJV'HSDUWPHQW


▲‫׉‬ㅆ਽ߡ B. Completion of Form

寶‫״׊‬੮ࠀ忍ӧ۱߄߄昘ङୂӣͫ◅֨੮ࠀЇ乗০澞寶஍Ї۱߄屴‫ކޢ‬ 3OHDVHHQVXUHWKDWDOOUHOHYDQWSDUWVRIWKHIRUPDUHGXO\FRPSOHWHGDQG
ў澞 WKHIRUPLVVLJQHG3OHDVHHQFORVHDOOVXSSRUWLQJGRFXPHQWV

۱‫҈ݕ‬ङ嶾‫߄ײމ‬
ЉҶ۪掑寏ͫ‫و‬؋০ㆊ
Љਈ垰ࣲղсङ‫ކ‬ў澞 ,ILQFRPSOHWHRUHUURQHRXVLQIRUPDWLRQLVSURYLGHGLQWKHIRUPWKH%XLOGLQJV
'HSDUWPHQWPD\QRWEHDEOHWRSURFHVVWKHVXEPLVVLRQ
‫ײ‬ㆎߎ੮ࠀ߄ѠѾए⭶ͫ寶厠‫و‬
؋০刦佧澞 
(QTXLULHVUHJDUGLQJWKLVIRUPVKRXOGEHDGGUHVVHGWRWKH%XLOGLQJV
'HSDUWPHQW


▏ձр‫ࡄݱ‬ C. Submission Methods

1. 慧‫أ‬嫠ાձрߎ੮ࠀ悪գ߄昘‫ކ‬ў㚙慧‫۪ؤ‬嫠૯ղсਙ‫و‬
؋০͹ By Post / In Person 7KLVIRUPWRJHWKHUZLWKWKHUHOHYDQWGRFXPHQWVVKDOO
 EHSRVWHGWRRUVXEPLWWHGLQSHUVRQWRWKH%XLOGLQJV'HSDUWPHQW
ձр‫ޥ‬昘⥬尘ґͪշїͪૹऍͪ‫ܗ‬ठࣩ਽ߡ͵Ь潈࡝௯֪ࢁ‫ڈ‬ଳ垹੼ 
Ь潈‫ڄݺ‬ՠ০Ԙ‫وڇ‬؋০偃ୂ֪Ј▲ਢ߲宎Ճ‫ݶ‬ў垰澞 For submissions relating to advisory letter/order/notice/direction:
 *HQHUDO(QTXLU\DQG5HFHLSW&RXQWHU*)%XLOGLQJV'HSDUWPHQW
ձр২‫ى܃‬଑‫ޥ‬昘Ҿєжࣩؕ਽ߡ͵ +HDGTXDUWHUV1RUWK7RZHU:HVW.RZORRQ*RYHUQPHQW2IILFHV+RL
7LQJ5RDG<DX0D7HL.RZORRQ
؋০‫ݶ‬䤚垰澞
௚࢔‫ן‬Վֽ‫ן‬Վ䍪ଳ垹㶣‫و‬

For other submissions to the New Buildings Division:
5HFHLSW 'HVSDWFK&RXQWHU%XLOGLQJ'HSDUWPHQW)7DLNRR:DQ
5RDG7DLNRR6KLQJ+RQJ.RQJ


▂刦佧嶾‫ݪ‬ D. Contact Details

‫و‬؋০ %XLOGLQJV'HSDUWPHQW
֪֭͹Ь潈࡝௯֪ࢁ‫ڈ‬ଳ垹੼Ь潈‫ڄݺ‬ՠ০Ԙ‫وڇ‬؋ ০偃ୂ $GGUHVV%XLOGLQJV'HSDUWPHQW+HDGTXDUWHUV1RUWK7RZHU:HVW.RZORRQ
朅宝͹ं³´‫ݎ‬刴 *RYHUQPHQW2IILFHV+RL7LQJ5RDG<DX0D7HL.RZORRQ
⟂ऱ͹ 7HO1R  KDQGOHGE\³´ 
朅慧͹KTW[OX_&HJMU\NQ )D[1R 
(PDLO HQTXLU\#EGJRYKN














宸Օы‫ב‬澝孧⡹佖㵜ٗ३㍳Ճ孧⡹㈏֦ٗ३㍳ҁ㴂➩ৰ$33஍捦$31$3$33 $SSHQGL[$   
Annex A.1
(PNAP APP-13)
Schedule of Building Materials and Products

BD Ref. : Re :
(*Address of development site/Location of alteration and addition works)
(A) Fire Resisting Products

Building Product Name of Fire Resisting Compliance Details of Test or Assessment Report Remarks/
Product Name Manufacturer Performance@ with Comments
and Place of (minutes) Relevant
Manufacture Building
Integrity Insulation Name of Name of Report Date of Test / Validity
(City and Regulations
Laboratory Laboratory / No. Assessment Date
Country) & Codes of
Accreditation Assessing Report
Practice
Body Organisation
a) Fire resisting ^
doorset
b) Lift landing door ^

c) Fire resisting ^
glazing
d) Fire-stop or sealing system
in wall/floor/curtain wall,
etc.
e) Fire dampersф

f) Others (e.g. proprietary


products, fire shutter, etc.)

@
The performance on stability has to be demonstrated where applicable.
^ Corresponding legend in approved plan should be specified where applicable.
ф
Part C of the Certificate of Accepted Building Materials and Products in Appendix A of PNAP APP-13 should be completed by RSC(V).

___________________ ______________________________
Date Signature# of authorized person
# In accordance with the registration record
* Delete whichever is inapplicable

(Rev. 11/2019)

-1-
Annex A.2
(PNAP APP-13)

Schedule of Building Materials and Products (cont’d)

BD Ref. : Re :
(*Address of development site/Location of alteration and addition works)

(B) Other Building Materials and Products

Building Product Name of Compliance with Details of Test or Assessment Report Remarks/
Product Name Manufacturer Relevant Building Comments
and Place of Regulations &
Manufacture Codes of Practice
Name of Name of Report Date of Test / Validity
(City and
Laboratory Laboratory / No. Assessment Date
Country)
Accreditation Assessing Report
Body Organisation
a) Glazing barrier

b) Cast iron pipes and


fittings

c) Others

I confirm that the above mentioned building products have been tested or assessed as stated and hereby certify that the application and performance
of these products comply with the relevant Building Regulations.

_______________ ______________________________
Date Signature# of authorized person

# In accordance with the registration record


* Delete whichever is inapplicable

(Rev. 11/2019)

-2-
Appendix B
(PNAP APP-13)
Certificate of Accepted Building Materials and Products for Minor Works

Minor works submission no. (if available): MW


Location or address of the minor works (if minor works submission no. is not available):

To the Building Authority,


□ Part A : to be certified by the Authorized Person appointed
(for minor works with prescribed building professionals appointed)
1. I, (name in full) ______________________________________, authorized person,
confirm that accepted building materials and products have been specified in the carrying out of minor
works in the above-mentioned submission no. Pursuant to section 56 of the Building (Minor Works)
Regulation, I duly endorse the attached Schedule of Building Materials and Products for Minor Works
(Annexes B.1 & B.2).
2. I hereby certify that the building materials and products listed in the attached Schedule are
acceptable products under relevant building regulations and that I am satisfied with the application
and performance of these products.

Certificate of Registration No. #

Date of expiry of Date Signature # of authorized person


registration #

Part B : to be certified by the Prescribed Registered Contractor appointed


□ *I/We, (name in full) ____________________________________________, prescribed
registered contractor, confirm that the accepted building materials and products listed in the attached
Schedule of Building Materials and Products for Minor Works (Annexes B.1 & B.2) have been used
and properly applied in the carrying out of minor works in the above-mentioned submission no.
□ (For minor works without prescribed building professional appointed) Pursuant to section
56 of the Building (Minor Works) Regulation, *I/we (name in
full) , prescribed registered contractor, duly endorse the attached
Schedule and hereby certify that the building materials and products listed in the attached Schedule
are acceptable products under relevant building regulations and that I am/we are satisfied with the
application and performance of these products.

Certificate of Registration No. # Signature# of prescribed


registered contractor

Date of expiry of Date Name of authorized signatory#


registration#

/Part C ...
-1-
Part C : to be certified by Registered Specialist Contractor in the Ventilation Works Category
appointed

□ *I/We, (name in full) __________________________________________, registered


specialist contractor in the ventilation works category, have inspected every fire damper installed in
the above building construction on (completion date of inspection) and hereby
certify that all the fire dampers are in safe and efficient working order pursuant to Clause E8.3 of the
Code of Practice for Fire Safety in Buildings.

□ *I/We, (name in full) __________________________________________, registered


specialist contractor in the ventilation works category, hereby confirm that the fire dampers listed in
the attached Schedule have been properly installed in the above building construction. *I/We have
inspected every fire dampers installed in the above premises on _____________ (completion date of
inspection) and hereby certify that all the fire dampers are in safe and efficient working order pursuant
to Clause E8.3 of the Code of Practice for Fire Safety in Buildings.

Name of authorized signatory#

Signature# of registered
specialist contractor
in the ventilation works category

Certificate of Registration No. #:


Date of expiry of registration#:

# In accordance with the registration record


□ Enter “” in the appropriate box
* Delete whichever is inapplicable

(Rev. 10/2020)

-2-
Annex B.1
(PNAP APP-13)
Schedule of Building Materials and Products for Minor Works

Minor works submission no. (if available) : MW

Location or address of the minor works (if minor works submission no. is not available):
(A) Fire Resisting Products
Fire Resisting
Name of
Performance@ Details of Test or Assessment Report
Manufacturer Compliance with
(Minutes)
Building Product & Place of Relevant Building Remarks/
Name of Name of
Product Name Manufacture Regulations & Date of Test Comments
Laboratory Laboratory / Validity
(City & Integrity Insulation Codes of Practice Report No. / Assessment
Accreditation Assessing Date
Country) Report
Body Organisation
a) Service lift ^
landing
door
b) Fire ^
resisting
glazing
c) Fire-stop or
sealing system in
wall, floor, etc.
d) Fire dampersф

e) Others

@ The performance on stability has to be demonstrated where applicable.


^ Corresponding legend in prescribed plans or plans should be specified where applicable.
ф Part C of the Certificate of Accepted Building Materials and Products in Appendix B of PNAP APP-13 should be completed by RSC(V).

Date Signature# of □ authorized person (for minor works with


appointed prescribed building professionals appointed)
□ prescribed registered contractor (for minor works
# In accordance with the registration record
□ Enter “”in the appropriate box without prescribed building professionals appointed)

(Rev. 10/2020)

-1-
Annex B.2
(PNAP APP-13)
Schedule of Building Materials and Products for Minor Works (cont’d)

Minor works submission no. (if available) : MW

Location or address of the minor works (if minor works submission no. is not available):

(B) Other Building Materials and Products

Name of Compliance with Details of Test or Assessment Report


Manufacturer & Relevant
Building Product Name of Remarks/
Place of Building Name of Laboratory Date of Test /
Product Name Laboratory Validity Comments
Manufacture (City Regulations & / Assessing Report No. Assessment
& Country) Codes of Practice Accreditation Date
Organisation Report
Body
a) Glazing barrier

b) Cast iron pipes &


fittings

c) Others

*I/We confirm that the above mentioned building products have been tested or assessed as stated and hereby certify that the application and performance of these
products comply with the relevant Building Regulations.

Date Signature# of □ authorized person (for minor works with


appointed prescribed building professionals appointed)
□ prescribed registered contractor (for minor works
* Delete whichever is inapplicable
# In accordance with the registration record without prescribed building professionals appointed)
□ Enter “”in the appropriate box

(Rev. 11/2019)

-2-

You might also like