Pankaj Kumar Keshari is seeking a dynamic and challenging position in GSM transmission planning. He has over 3 years of experience as a Transmission Engineer at Ericsson through Cellplan Technologies Pvt. Ltd. His responsibilities have included transmission coordination, planning SDH and PDH routes, link budget analysis, and microwave surveys. He holds a B.Tech in Electronics and Communication from CERT Meerut and is proficient in tools like TEMS Link Planner, Path Loss-4, RL Tool and Global Mapper.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
493 views5 pages

CV Transmission Planning

Pankaj Kumar Keshari is seeking a dynamic and challenging position in GSM transmission planning. He has over 3 years of experience as a Transmission Engineer at Ericsson through Cellplan Technologies Pvt. Ltd. His responsibilities have included transmission coordination, planning SDH and PDH routes, link budget analysis, and microwave surveys. He holds a B.Tech in Electronics and Communication from CERT Meerut and is proficient in tools like TEMS Link Planner, Path Loss-4, RL Tool and Global Mapper.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 5

Curriculum Vitae

PANKAJ KUMAR KESHARI Contact No. 09504901215


QTR.NO. 447/B, D.L.W. Email Id: [email protected]
Varanasi,U.P. Passport No. G7211880

OBJECTIVES

Seeking a dynamic, challenging, hardworking and growth oriented position in the field of GSM
(Transmission Planning). To be ahead of time and keep taking up challenging work while performing
my level best. Want to work in a company, which is committed to quality and professionalism. To learn
new and the latest development in various technical aspects to be able to implement in time to come.

WORK EXPERIENCE
Having 3 years & 6 months experience in GSM as a Transmission Engineer in ERICSSON
through CELLPLAN Technologies pvt. Ltd, Pune from May‘07 to Till Now.

PRESENT ORGANISATION
1. COMPANY: ERICSSON through CELLPLAN Technologies pvt. Ltd.
DESIGNATION: Transmission Engineer
PROJECT: Aircel (BIHAR)

DESCRIPTION OF PROJECT:
• Co-Ordination & Planning of Transmission network of Aircel in Bihar.
• Co-Ordination for Aircel Transmission survey team in Orissa.
• Survey for Transmission network of Airtel in U.P. (WEST).

PROJECT RESPONSIBILITIES:

PROJECT-1 (CURRENT) #
Organization: Ericsson India Pvt Ltd. (BIHAR Circle)
Duration: 2 Year & 1 months

TRANSMISSION CO-ORDINATION:
 Initial E1 planning for 2G/3G/WIMAX sites.
 Protection plan for 3G sites.
 Calculating Link Budget through Tems Link Planner.
 Planning of STM-1 Ring Network in City and Backbone to have a Reliable Network.
 Handling Survey Team.
 Microwave Projections for the additional Site rollouts and Capacity Requirement and
enhancement planning.
 Good understanding of transmission equipment of Ericsson.
 PCM Planning, E1 Planning, Frequency Planning For SDH & PDH Routes.

 Designing of a complete Transmission Network, which fulfills all critical requirements of


B/W.Capacity (PDH and SDH), M/W spectrum, and availability as per ITU-T standards.
 Fiber route and MUX planning.
 Planning of transmission Access/Back bone network.
 Monthly E1 indent from BTSOL, TATA, RELIANCE & RAILTEL, as per projection given by Design
Team for Rollout.
 Guide the Installation team for implementation of critical Microwave links.
 Plan for suitable repeaters in case of Non availability of LOS for new sites.
 Plan for backup connectivity for the MW links with ring protection to avoid outages.
 Plan for 1+1 for critical links in spur.
 Management of the DCN implementation to integrate supervision of the networks.
 Dimensioning of BSS transmission plan in terms of link capacity requirements in line
with forecasted traffic information (Abis & Ater interface capacities).
 Working on TLP and map source softwares for drawing profiles making the microwave link
budget.
 Supervising the Backbone network planning and extending the network.
 Preparing the BOQ for all transmission equipments depend on Marketing Department plan.

PROJECT-2#
Organization: Ericsson India Pvt Ltd. (ORISSA Circle)
Duration: 10 Months

TRANSMISSION CO-ORDINATOR:
 Solving Transmission issues.
 Giving far ends to survey teams as given link planning.
 Solving Material issues.
 Solving Link issues.
 PDH & SDH Route Planning with Planner.
 Giving antenna heights & Orientation to Installation team.
 Making Survey Reports by using RL Tool.
 LOS Survey for Broadband link and height calculation.
 Finalizing MW antenna heights by using RL Tool & Global Mapper.
 Done Microwave surveys for Critical Line Of Sight (LOS) Clearance.
 Doing coordination work with all team members for updating reports.
 Providing terrain data for LOS survey.
 After LOS Verification Preparing path Profile.
 Carryout link budget analysis for Finalizing Link engineering based on link objective criteria.
 Making IDOC for Material Dispatch.
PROJECT-3#
Organization: Ericsson India Pvt Ltd. (UP West Circle)
Duration: 7 Months
LOS SURVEY (TEAM LEAD):
 Making Survey Reports by using RL Tool.
 Main Transmission Route Alternative Path Planning.
 Planning repeaters.
 LOS Survey for Broadband link and height calculation.
 Involved in Planning of about Links of Win-4(GSM) as per E-1’s available & network (SDH and
PDH) for Punjab Circle.
 Planning as per no. of E-1’s in the Particular Route.
 Making IDOCS for Material Dispatch.

TOOLS USED:
 TEMS Link Planner
 Path Loss-4
 RL tool
 Global Mapper
 Garmin (gps12,gps72,etrex)
 Altimeter
 Compass
 Map Source
 Global Mapper
 Map info
 RL Tool (kk engg. Tool)
 Net Monitor.

Educational Background

Year of
Name of examination Board/ University Educational Institute
Passing
B.Tech. (El & Comm.) U.P.T.U.,Lucknow C.E.R.T., Meerut 2007

Senior Secondary U.P. Board D.L.W. Inter College,Vns 2002

Higher Secondary U.P. Board D.L.W. Inter College,Vns 2000

Professional Training

 Diploma in “WIRELESS TECHNOLOGY” from TNS Pvt. Ltd., Noida.


1. Site Survey( RF & MW)
2. Drive Test (Through TEMS)
3. BTS Installation(Motorola and Ericsson)
Computer Proficiency / Skill Set
 Operating System : Windows Family (9x,2000,XP,VISTA)
 Packages : MS-OFFICE, MS-EXCEL.

INDUSTRIAL TRAINING
• Four weeks of vocational training at M.T.N.L.,New Delhi after the Sixth semester examination on
Networking and Switching.
• Four weeks of vocational training at D.L.W., Varanasi after the Fourth semester examination on
the topic C.N.C Machine.

Colloquium

Delivered the Seminar on the Topic “Ground Stations”.

Key Competencies

• Agility to adapt quickly • Positive attitude • Team Leader & Player


• Simplicity and Honesty • Ability to set priorities and work independently

Extra-Curricular Activities

• Scholarship from U.P.T.E.C.


• Participated in drawing competition at school level.
• Participated in essay competition at school level.

PERSONAL DETAILS
NAME: : Pankaj Kumar Keshari
FATHER’S NAME : Mr. Harihar Nath
DATE OF BIRTH : 8th July 1983
NATIONALITY : Indian
GENDER : Male
MARITAL STATUS : Single
LANGUAGES KNOWN : English, Hindi, Bengali

References
1. Mr.Nitin Keshari, Dypt. Manager, Reliance Comm., New delhi, 09311463878.
2. Mr. Rajesh Saxena, 7 circle Transmission Lead, Nokia, Gurgaon. 08800490691.
4. Mr.Ashok Kumar, NSS, AIRTEL, Gurgaon ,09971994694.
5. Mr.Mukesh Pradhan,Planner,IMIL,Orissa,09938481414.

DECLARATION

I here by declare that all the information given above is true to my knowledge and belief.
DATE: (PANKAJ KUMAR KESHARI)

You might also like