Ductility Test: Keystone Infrastructure
Ductility Test: Keystone Infrastructure
Ductility Test
Location :- Date of Sampling:-
Source of Mat.:- Date of Testing :-
Grade of Bitumen:- VG-30
Engineer Consultant Engineer
Keystone
M/S.K.V.Barad Infrastructure Section Officer
Kodinar Ahmedabad Kodinar
KEYSTONE INFRASTRUCTURE
QA / QC RECORDS FOR LABORATORY
Format No. - PMC / QA / QC / LABORATORY / 45
Project -P.R. between K.M. 251/0 to 263/2 of NH 8E Somnath-Bhavnagar Road
Client- National Highway Division Rajkot
Contractor -Parishram Builders- Veraval
Ductility Test
Location :- Date of Sampling:-
Source of Mat.:- Date of Testing :-
VG-
Grade of Bitumen:-
30
VG
1 Bitumen Grade
-30
13
2 Pouring Temp.
7
3 Period of colling in atmosphere (minutes) 35
4 Period of colling in water bath before trimming (minutes) 30
5 Period of colling in water bath after trimming (minutes) 86
6 Actual Test Temp. 27