Ductility Test: Keystone Infrastructure

The documents contain quality control records from ductility tests of bitumen samples. The tests were conducted on samples from two different highway construction projects. The documents include details of the tests conducted, materials used, results within specified limits.

Uploaded by

Rakesh7770
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
40 views5 pages

Ductility Test: Keystone Infrastructure

The documents contain quality control records from ductility tests of bitumen samples. The tests were conducted on samples from two different highway construction projects. The documents include details of the tests conducted, materials used, results within specified limits.

Uploaded by

Rakesh7770
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

KEYSTONE INFRASTRUCTURE

QA / QC RECORDS FOR LABORATORY


Format No. - PMC / QA / QC / LABORATORY / 45
Project -P.R. between K.M. 209/00 to 233/00 of NH 8E Somnath-
Bhavnagar Road
Client- National Highway Division Rajkot
Contractor – M/S.K.V.Barad – Kodinar

Ductility Test
Location :- Date of Sampling:-  
Source of Mat.:- Date of Testing :-  
Grade of Bitumen:- VG-30  

   
   
  Engineer Consultant Engineer  
Keystone
  M/S.K.V.Barad Infrastructure Section Officer  
  Kodinar Ahmedabad Kodinar  
   
                   
KEYSTONE INFRASTRUCTURE
QA / QC RECORDS FOR LABORATORY
Format No. - PMC / QA / QC / LABORATORY / 45
Project -P.R. between K.M. 251/0 to 263/2 of NH 8E Somnath-Bhavnagar Road
Client- National Highway Division Rajkot
Contractor -Parishram Builders- Veraval
Ductility Test
Location :- Date of Sampling:-  
Source of Mat.:- Date of Testing :-  
VG-
Grade of Bitumen:-  
30
VG
1 Bitumen Grade
-30
13
2 Pouring Temp.
7
3 Period of colling in atmosphere (minutes) 35
4 Period of colling in water bath before trimming (minutes) 30
5 Period of colling in water bath after trimming (minutes) 86
6 Actual Test Temp. 27
                   

Test Property Sample No.


Mean Value Limits
  1 2 3
9 8
Ductility Value (cm) 87 88.67 75 cm Minimum
1 8
   
   
   
   
   
   
   
   
  Engineer Consultant Engineer SO/DE  
Parishram Keystone NH Sub.
  Builders Infrastructure Division  
  Veraval Ahmedabad Kodinar  
   
                   
KEYSTONE INFRASTRUCTURE
QA / QC RECORDS FOR LABORATORY
Format No. - PMC / QA / QC / LABORATORY / 45
Project -P.R. between K.M. 251/0 to 263/2 of NH 8E Somnath-Bhavnagar Road
Client- National Highway Division Rajkot
Contractor -Parishram Builders- Veraval
Ductility Test
Location :- Date of Sampling:-  
Source of Mat.:- Date of Testing :-  
VG-
Grade of Bitumen:-  
30
VG
1 Bitumen Grade
-30
13
2 Pouring Temp.
7
3 Period of colling in atmosphere (minutes) 35
4 Period of colling in water bath before trimming (minutes) 30
5 Period of colling in water bath after trimming (minutes) 84
6 Actual Test Temp. 27
                   

Test Property Sample No.


Mean Value Limits
  1 2 3
9 8
Ductility Value (cm) 93 93.33 75 cm Minimum
8 9
   
   
   
   
   
   
   
   
  Engineer Consultant Engineer SO/DE  
Parishram Keystone NH Sub.
  Builders Infrastructure Division  
  Veraval Ahmedabad Kodinar  
   
                   
KEYSTONE INFRASTRUCTURE
QA / QC RECORDS FOR LABORATORY
Format No. - PMC / QA / QC / LABORATORY / 45
Project -P.R. between K.M. 251/0 to 263/2 of NH 8E Somnath-Bhavnagar Road
Client- National Highway Division Rajkot
Contractor -Parishram Builders- Veraval
Ductility Test
Location :- Date of Sampling:-  
Source of Mat.:- Date of Testing :-  
VG-
Grade of Bitumen:-  
30
VG
1 Bitumen Grade
-30
14
2 Pouring Temp.
0
3 Period of colling in atmosphere (minutes) 35
4 Period of colling in water bath before trimming (minutes) 30
5 Period of colling in water bath after trimming (minutes) 81
6 Actual Test Temp. 27
                   

Test Property Sample No.


Mean Value Limits
  1 2 3
9 8
Ductility Value (cm) 93 90.33 75 cm Minimum
6 2
   
   
   
   
   
   
   
   
  Engineer Consultant Engineer SO/DE  
Parishram Keystone NH Sub.
  Builders Infrastructure Division  
  Veraval Ahmedabad Kodinar  
   
                   
KEYSTONE INFRASTRUCTURE
QA / QC RECORDS FOR LABORATORY
Format No. - PMC / QA / QC / LABORATORY / 45
Project -P.R. between K.M. 251/0 to 263/2 of NH 8E Somnath-Bhavnagar Road
Client- National Highway Division Rajkot
Contractor -Parishram Builders- Veraval
Ductility Test
Location :- Date of Sampling:-  
Source of Mat.:- Date of Testing :-  
VG-
Grade of Bitumen:-  
30
VG
1 Bitumen Grade
-30
14
2 Pouring Temp.
4
3 Period of colling in atmosphere (minutes) 35
4 Period of colling in water bath before trimming (minutes) 30
5 Period of colling in water bath after trimming (minutes) 83
6 Actual Test Temp. 27
                   

Test Property Sample No.


Mean Value Limits
  1 2 3
8 8
Ductility Value (cm) 98 91.00 75 cm Minimum
9 6
   
   
   
   
   
   
   
   
  Engineer Consultant Engineer SO/DE  
Parishram Keystone NH Sub.
  Builders Infrastructure Division  
  Veraval Ahmedabad Kodinar  
   
                   