Infrastructure Design Report - G1!1!41
Infrastructure Design Report - G1!1!41
DESIGN REPORT
REFERENCE NO:
UTHM/BFC43303/IDP/INFRASTRUCTURE/SECTION_9
Prepared By;
Mohammad Syahir Zaman Bin Abdul Rahman (CF 170203)
Nur Azreen Farahin Binti Mohd Fadzli (CF 170021)
Ku Muhammad Firdaus Bin Ku Meh (CF 170202)
Harith Adhwa Bin Mohd Zemee (CF 170209)
Priscilla A/P Samasundram (CF 170001)
Checked By;
Ir. Ts. Dr. Abdul Halim Abdul Ghani
7.0 Appendix 88
7.1 Earthwork Drawing 89
7.2 Road Drawing 96
7.3 Drainage Drawing 102
7.4 Water Reticulation Drawing 106
7.5 Sewerage Drawing 115
SKHPA CONSULTANT
No. 28-3, Jalan Impian Mahkota 1, Saujana
Impian, 43000 Kajang, Selangor
SKHPA Tel: 04-441 4058 Fax: 04-441 3058
CONSULTANT Email: [email protected]
SKHPA Consulting Engineer was established in 1996 and has evolved into one of the leading
engineering consulting companies in the areas of engineering design, project management,
supervision, quality assurance and consulting services. The firm has extensive experience in
infrastructure works and maritime projects and has undertaken numerous project assignments
both in Malaysia and abroad.
SKHPA applies a management system in line with EN ISO 9001:2015. In addition to
design, the firm is also involved in preparation of tender documents, project management,
construction supervision, quality control, expert appraisal, bid evaluation and post auditing.
These faculties assure the firm’s ability to handle major multi-disciplinary projects.
Besides, the firm has extensive experience in project planning, feasibility and
environmental impact assessment studies, technical design and earthquake engineering,
floating and underwater structures and pipelines, aquaculture development, topographic and
bathymetric surveys, geotechnical investigations, environmental and water quality control
studies. For design purposes, the latest available engineering software packages are used, which
can be modified in-house and adapted to suite the client’s particular requirements.
1
SKHPA CONSULTANT
No. 28-3, Jalan Impian Mahkota 1, Saujana
Impian, 43000 Kajang, Selangor
SKHPA Tel: 04-441 4058 Fax: 04-441 3058
CONSULTANT Email: [email protected]
E-mail [email protected]
The company continues to move forward in become the leading multi-discipline engineering
company providing project engineering, project management, engineering studies,
construction and maintenance works in Malaysia and eventually the region, by consistently
delivering projects that meet international standards.
With a well-defined direction in place, the path to realizing our Vision is based on fundamental
drivers, instrumental in achieving our goals. Our mission:
2
SKHPA CONSULTANT
No. 28-3, Jalan Impian Mahkota 1, Saujana
Impian, 43000 Kajang, Selangor
SKHPA Tel: 04-441 4058 Fax: 04-441 3058
CONSULTANT Email: [email protected]
SKHPA’s key personnel comprised of highly experienced professionals who has previously
served in the multi-national companies. In addition to in-house expertise, SKHPA is also able
to draw specialist support from overseas. At SKHPA, every employee member is a professional
dedicated to the success of each project and to the exceeding of the customer expectations.
Thus, our company’s value;
3
SKHPA CONSULTANT
No. 28-3, Jalan Impian Mahkota 1, Saujana
Impian, 43000 Kajang, Selangor
SKHPA Tel: 04-441 4058 Fax: 04-441 3058
CONSULTANT Email: [email protected]
Position: Director
Name: Mohammad Syahir Zaman Bin Abdul Rahman
Education: Bachelor of Civil Engineering (Hons)
Email: [email protected]
Contact: +6010 - 826 9556
Position: Vice-Director
Name: Priscilla D/O Samasundram
Education: Bachelor of Civil Engineering (Hons)
Email: [email protected]
Contact: +6014 – 601 6561
4
SKHPA CONSULTANT
No. 28-3, Jalan Impian Mahkota 1, Saujana
Impian, 43000 Kajang, Selangor
SKHPA Tel: 04-441 4058 Fax: 04-441 3058
CONSULTANT Email: [email protected]
5
SKHPA CONSULTANT
No. 28-3, Jalan Impian Mahkota 1, Saujana
Impian, 43000 Kajang, Selangor
SKHPA Tel: 04-441 4058 Fax: 04-441 3058
CONSULTANT Email: [email protected]
PROJECT DIRECTOR
Muhammad Syahir Zaman Bin
Abdul Rahman
A construction project is at all order and requires many different people with different skill sets
to execute it. Here is a breakdown of the kinds of jobs you will come across on a construction
project.
Duty and responsible are wider terms, which are used in a number of contexts, say in
the field of law, management, education, ethics, and so forth. These are commonly used with
one another, but they are two different terms, wherein the duty is imposed on someone, to
perform something which is morally, legally or professionally considered right. It is something
which was required to do as per law, conventions, rules and norms.
For this project we assigned few duties and responsibilities related in construction
building scope of work. The position was assigned to each of group member such as Project
Director, Design Engineer, C&S Engineer, Infrastructure Engineer and Project Engineer.
Figure 3 below is the list of position to each member in the group.
7
SKHPA CONSULTANT
No. 28-3, Jalan Impian Mahkota 1, Saujana
Impian, 43000 Kajang, Selangor
SKHPA Tel: 04-441 4058 Fax: 04-441 3058
CONSULTANT Email: [email protected]
Project Director
Job Description
1. Prepare the project plans, schedule and schedules and specifications and comment on the
building design, scheduling, possible cost saving measures and potential construction
problems.
2. Monitoring build progress, overseeing finance and ensuring project quality.
3. Making strategic decisions and providing leadership and direction to project managers to
implement those decisions.
4. Meeting with clients, stakeholders and project managers to report on project progress.
5. Liaising with clients and building strong working relationships.
6. Devising cost-effective plans to enable effective project completion.
7. Managing risks to avoid delays or reputational damage.
8. Ensuring permits and legal papers are secured ahead of the project.
9. Managing project managers and enabling them to supervise and manage their own teams.
10. Working in an office and on a construction site.
8
SKHPA CONSULTANT
No. 28-3, Jalan Impian Mahkota 1, Saujana
Impian, 43000 Kajang, Selangor
SKHPA Tel: 04-441 4058 Fax: 04-441 3058
CONSULTANT Email: [email protected]
Job Description
9
SKHPA CONSULTANT
No. 28-3, Jalan Impian Mahkota 1, Saujana
Impian, 43000 Kajang, Selangor
SKHPA Tel: 04-441 4058 Fax: 04-441 3058
CONSULTANT Email: [email protected]
Geotechnical Engineer
Job Description
1. Study geological maps and aerial photographs from a range of sources and from different
time periods.
2. Examine construction plans to see how feasible they are based on your understanding of
the site.
3. Investigate risks or geological hazards for the site.
4. Search for environmentally sensitive features, such as landfill.
5. Start to develop factual and interpretive ground models.
6. Plan field investigations.
7. Updating any software and hardware where necessary.
8. Documenting all reported malfunctions and actions taken in response.
10
SKHPA CONSULTANT
No. 28-3, Jalan Impian Mahkota 1, Saujana
Impian, 43000 Kajang, Selangor
SKHPA Tel: 04-441 4058 Fax: 04-441 3058
CONSULTANT Email: [email protected]
Structural Engineer
Job Description
11
SKHPA CONSULTANT
No. 28-3, Jalan Impian Mahkota 1, Saujana
Impian, 43000 Kajang, Selangor
SKHPA Tel: 04-441 4058 Fax: 04-441 3058
CONSULTANT Email: [email protected]
Infrastructural Engineer
Job Description
12
SKHPA CONSULTANT
No. 28-3, Jalan Impian Mahkota 1, Saujana
Impian, 43000 Kajang, Selangor
SKHPA Tel: 04-441 4058 Fax: 04-441 3058
CONSULTANT Email: [email protected]
SKHPA Consultants Sdn. Bhd is main civil and structural consultant that have been appointed
by the client, Cahaya Kota Development Sdn. Bhd. However, SKHPA Consultants Sdn. Bhd
was entrusted to design the building structure and infrastructure of Proposed Project of One (1)
Unit, 5-Storey Hostel Building in Melaka.
13
SKHPA CONSULTANT
No. 28-3, Jalan Impian Mahkota 1, Saujana
Impian, 43000 Kajang, Selangor
SKHPA Tel: 04-441 4058 Fax: 04-441 3058
CONSULTANT Email: [email protected]
As shows in Figure 4 is project location key plan and Figure 5 shows the location plan of
site.
Project Location
14
SKHPA CONSULTANT
No. 28-3, Jalan Impian Mahkota 1, Saujana
Impian, 43000 Kajang, Selangor
SKHPA Tel: 04-441 4058 Fax: 04-441 3058
CONSULTANT Email: [email protected]
The client, proposed construction of 5 storeys of hostel that consists 2 units of bedrooms, 1 unit
of master bedroom, 2 units of bathrooms, 34 units of rooms, dining/living hall, multi-purpose
area, store area, store room, resting area, medical room, reception room, kitchen, 9 units of
toilet (5 units of shower room, 6 units of water closet room, 4 units of basins, 1 unit of duct
room) and 9 units of wash area. However, the infrastructure works such as earthwork, drainage
works, road and pavement, water reticulation works, and sewerage works also involved in this
project.
The project that will be develop in Balai Panjang, Melaka is propose to development of a 1 unit
hostel with 5 storey. Thus, SKHPA Consultants Sdn. Bhd as consulting engineer to design the
structural and infrastructural of the development according client's required.
As civil and structural consulting engineer, our tasks was given to plan, design, and
oversee construction, maintenance of building structures and infrastructures and also
construction supervision activity that consists of two parts which is general supervision and
resident supervision. General supervision involves the following:
a. Periodic visits to site.
b. Consultation with the Owner/Client
c. Interpretation of plans and specifications.
d. Checking working drawings and data.
e. Processing and certification of contractor’s payment estimation.
f. Preparation of amendments to contractor’s contract.
g. Final inspection of project.
h. Preparation “as built” drawings.
However, the resident supervision however requires the consulting engineer to send a
representative of a resident engineer to send a representative or a resident engineer to the site
of the project. The resident engineer is responsible for detailed supervision and inspection to
ensure that the project is constructed according to the plans and specifications. In addition,
another tasks are to coordinates and expedites the activities of the contractors.
15
SKHPA CONSULTANT
No. 28-3, Jalan Impian Mahkota 1, Saujana
Impian, 43000 Kajang, Selangor
SKHPA Tel: 04-441 4058 Fax: 04-441 3058
CONSULTANT Email: [email protected]
3.1 EARTHWORK
Earthwork is the process where the surface of earth is excavated, transported to and compacted
at another location. Earthwork includes the excavation of existing earth materials and any
placement of fill material required for constructing the embankment. Generally, earthwork are
engineering works created through the moving or processing of the parts of the earth’s surface
involving qualities of soil or unframed rock. The earth may be moved to another location and
farmed into a desired shape for a purpose.
In the field of civil engineering, typical earthworks include roads, railway beds,
causeways, dams, levees, canals and berms. Other common earthworks are land grading to
reconfigure the topography of a site, or to stabilize the slopes.
16
SKHPA CONSULTANT
No. 28-3, Jalan Impian Mahkota 1, Saujana
Impian, 43000 Kajang, Selangor
SKHPA Tel: 04-441 4058 Fax: 04-441 3058
CONSULTANT Email: [email protected]
To perform a safe and economic earthwork design, team member need to make sure that
earthwork design process are following the right flow. The earthwork design process used for
both structures is as follows:
Yes
Site clearing is the process of removing trees, stumps, brush, stones and other obstacles from
an area as required to make sure that the proposed constructed area are free from any material
that can cause damage to the structure. It is done in order to prepare the site for the excavation
and formation of the road. The site clearing process will be conducted on the early stage of the
construction followed by earthwork. There are several principles in site clearing need to be
follow by the contractor which is:
i. Natural vegetation should be retained as much as possible at areas fronting
watercourses.
ii. Any topsoil removed and planed for re-spreading should be stored temporarily at
designated sites.
iii. All cleared biomass and vegetation shall be collected and composted on-site. These
materials shall be placed away from any waterways.
The construction work will unavoidably change the drainage pattern over the site dictated by
the restructuring of earthworks to suits land use planning proposal. To cater for this
development needs and erosion control measures, the main and temporary drainage system will
be established concurrently including channelization, silt trap and turfing before the other
infrastructures move in.
Silt trap is a temporary device installed on a construction site to capture eroded or
disturbed soil that is washed off during rain storms, and protect the water quality of a nearby
stream, river, lake, or bay. The trap is basically an embankment built along a waterway or low-
lying area on the site. They are typically installed at the perimeter of a site and above storm
drain inlets, to keep sediment from entering the drainage system. Sediment traps are commonly
used on small construction sites, where a sediment basin is not practical. Sediment basins are
typically used on construction sites of 5 acres (20,000m2 ) or more, where there is sufficient
room.
18
SKHPA CONSULTANT
No. 28-3, Jalan Impian Mahkota 1, Saujana
Impian, 43000 Kajang, Selangor
SKHPA Tel: 04-441 4058 Fax: 04-441 3058
CONSULTANT Email: [email protected]
The design references are based on the Planning and Design Procedure no 1, Standard
and Procedures for Peninsular Malaysia, Volumes 1 – 20 (Manual Saliran Mesra Alam
Malaysia) Department of Irrigation and Drainage Malaysia, 2000. The overall concept in the
temporary drain and silt trap design is as follows:
i. Providing site perimeter temporary earth drain to curb silt water from construction
site and channel into the silt trap in order to prevent it from directly flowing into
the nearby swamp or river.
ii. Silt trap shall be constructed and maintained to effectively trap the silt from the
muddy water before the water flow into the drain.
iii. Final discharges all the filtered water (by silt trap) from this development and shall
be flow into the existing drain.
Limits of clearing and grubbing are generally noted on the plans. Usually areas outside the
work limits are to be left in their natural condition unless otherwise designed on the plans. In
general, it is intended that the roadway fit into the landscape in a pleasing way. Natural
features should be left undisturbed where possible.
Clearing is defined as the removal of all trees, brush, and so forth, and is required in all
work areas. Grubbing is defined as the removal of stumps and roots. It is not always necessary
to remove all stumps and root system beneath embankments. Trees and brush should be cut off
close to the original ground surface so that the initial layers of fill can be replaced and
compacted properly. The specification should be read carefully to determine grubbing
requirement. Example of earthwork machine is:
20
SKHPA CONSULTANT
No. 28-3, Jalan Impian Mahkota 1, Saujana
Impian, 43000 Kajang, Selangor
SKHPA Tel: 04-441 4058 Fax: 04-441 3058
CONSULTANT Email: [email protected]
21
SKHPA CONSULTANT
No. 28-3, Jalan Impian Mahkota 1, Saujana
Impian, 43000 Kajang, Selangor
SKHPA Tel: 04-441 4058 Fax: 04-441 3058
CONSULTANT Email: [email protected]
Cut slopes are rarely created greater than a slope of two to one (horizontal to vertical
dimensions). Cut sections of roadway or rail are characterized by the roadway being lower in
elevation than the surrounding terrain. From an operational standpoint there are unique
environmental effects associated with cut sections of roadway. For example, air pollutants
can concentrate in the “valleys” created by the cut section. Conversely, noise pollution is
mitigated by cut sections since an effective blockage of line of sight sound propagation is
created by the depressed roadway design.
22
SKHPA CONSULTANT
No. 28-3, Jalan Impian Mahkota 1, Saujana
Impian, 43000 Kajang, Selangor
SKHPA Tel: 04-441 4058 Fax: 04-441 3058
CONSULTANT Email: [email protected]
A much easier method for calculating cut and fill requirements for general building and site
work is the grid method. This method does not require section drawings or complicated area
formulas. Following are the steps to calculate cut and fill by grid method:
Take the site plan and lay it on a large flat surface like a drafting table or a large desk. With
a large T-square, draw a series of equally spaced Coors auto and vertical lines across the
drawing. The lines should be spaced in multiples of the drawing scale. The spacing should
strike a balance between speed and accuracy. The smaller the grid cells, the more calculations
will need to be performed but the higher the accuracy. The larger the grid cells, the fewer
calculations will need to be performed the lower the accuracy will be. A good compromise
is to base the spacing on the average complexity of the job site. In more complex areas the
grid cells can be further subdivided so as to increase the accuracy in those portions of the
drawing.
For the corner of each grid cell, determine the existing elevation. To do this accurately, take
a scale and find the shortest distance between two contours that form a line crossing through
the corner. Use the ratio of the distance between the contours and the distance from one
contour to the corner to determine the elevation at the corner. If stripping topsoil from the
site, make sure to reduce the existing elevation by the thickness of the topsoil strip.
Repeat step 2 above for all the proposed elevations. If re-spreading topsoil or adding parking
lot and building pads, make sure to reduce the proposed elevation by the thickness of the
topsoil re-spread or other man-made materials.
23
SKHPA CONSULTANT
No. 28-3, Jalan Impian Mahkota 1, Saujana
Impian, 43000 Kajang, Selangor
SKHPA Tel: 04-441 4058 Fax: 04-441 3058
CONSULTANT Email: [email protected]
For the corner of each grid cell, subtract the existing elevation from the proposed elevation.
Positive quantities are fill. Negative quantities are cut.
For each grid cell, add the four corners cut or fill depths together and divide that sum by
4.0 to calculate the average cut or fill depth for that grid cell.
For each grid cell, calculate the total cut or fill volume by multiplying the average cut or fill
depth by the area of the grid cell. (To determine the area of the grid cell, multiply the length
of one horizontal side by the length of one vertical side). Finally, divide this number by 27
in order to calculate cut and fill in cubic yards. Negative volumes are cut. Positive volumes
are fill.
Determine the total cut for the site by adding up all of the negative volumes in every grid
cell on the drawing. (You can record the cut as a positive number at this point.) Then
determine the total fill for the site by adding up all the positive volumes in every grid cell on
the drawing.
To determine the export from the site, subtract the fill from the cut. If the result is positive,
this is the volume of soil that must be exported from the site. If the result is negative, this
is the volume of soil that must be imported to the site.
24
SKHPA CONSULTANT
No. 28-3, Jalan Impian Mahkota 1, Saujana
Impian, 43000 Kajang, Selangor
SKHPA Tel: 04-441 4058 Fax: 04-441 3058
CONSULTANT Email: [email protected]
On sidelong ground, drainage grips or trenches shall be excavated uphill in the area to be
filled and compacted. Drainage shall be effected without causing sedation or erosion and
water shall be disposed of in a manner to be agreed by the Superintending Officer (SO). The
area to be filled, whether an existing excavation or otherwise undisturbed ground, shall be
graded to fall, and sump pumping or other suitable dewatering facilities shall be provided by
the Contractor to keep the base of the excavation dry at all times.
Where the area to be filled comprises an existing excavation, the excavation shall be
inspected and subsequently monitored by the Contractor, to ensure that there is no danger of
its collapse during the works with consequences for safety, for existing buildings or for other
construction adjoining.
The contractor shall provide where necessary temporary watercourses, ditches, drains,
pumping or other means of maintaining the earthworks free from water. Such provision shall
include carrying out the work of forming the cuttings and fill platforms in such a manner that
their surfaces have at all times a sufficient gradient to enable them to shed water and prevent
bending. Similar arrangements shall be made for all earthworks including excavations
whether for pile trenches, foundations or cuttings.
If the surface of completed areas be damaged by erosion or any other cause, the
Contractor shall at his own cost make good such areas to the agreement of the SO. The
Contractor shall exercise care in preventing wastage of suitable material needed for
construction of fill platform. The Contractor shall take all necessary precautions to prevent
the breeding of mosquitoes and pay all charges made by the local Authority for anti-malarial
measures.
25
SKHPA CONSULTANT
No. 28-3, Jalan Impian Mahkota 1, Saujana
Impian, 43000 Kajang, Selangor
SKHPA Tel: 04-441 4058 Fax: 04-441 3058
CONSULTANT Email: [email protected]
The first urban drainage manual, ‘Planning and Design Procedures No.1: Urban Drainage
Design Standards and Procedures for Peninsular Malaysia’ was published by DID in 1975.
This manual was prepared as a guideline for engineers in designing drainage system and had
been referred to by various agencies at federal and state level for the drainage requirements
needed for any development in urban areas. The manual has been in used as a guideline for
more than twenty five years and since its publication, changes have not been made although
there have been many new technological developments in urban drainage.
Department of Irrigation and Drainage (DID) Malaysia is taking a proactive step by
introducing New Urban Drainage Manual known as Storm Water Management Manual for
Malaysia (Manual Saliran Mesra Alam or MSMA). It is time to take a proactive measure to
change the manual to incorporate the latest development in stormwater management that is
known as control-at-source approach. This approach utilizes detention/retention, infiltration
and purification processes. The quality and quantity of the runoff from developing area can be
maintained to be the same as predevelopment condition.
Standard and guidelines for the road and drainage as following below:
i. Road – For this proposed project, we decide to choose road and drainage. Thus,
JKR standard specification for road works as our references.
ii. Drainage – MASMA will be using for design culvert and drainage system.
26
SKHPA CONSULTANT
No. 28-3, Jalan Impian Mahkota 1, Saujana
Impian, 43000 Kajang, Selangor
SKHPA Tel: 04-441 4058 Fax: 04-441 3058
CONSULTANT Email: [email protected]
Start
Approval by No
local authority
Re-design for
Yes Road &
Drainage
Construct Road & Drainage
on site
End
27
Figure 11: Road and drainage design process
SKHPA CONSULTANT
No. 28-3, Jalan Impian Mahkota 1, Saujana
Impian, 43000 Kajang, Selangor
SKHPA Tel: 04-441 4058 Fax: 04-441 3058
CONSULTANT Email: [email protected]
Malaysian Federal Roads System, it is the main national road network in Malaysia. All Federal
Roads in Malaysia are under the purview of the Ministry of Works (MOW). According to
the Ministerial Functions Act 1969, the MOW is responsible to plan, build and maintain all
Federal Roads gazetted under the Federal Roads Act 1959.
However, most of the Federal roads projects were built and maintained by
the Malaysian Public Works Department (JKR), which is also one of the implementing
agencies under the MOW with the exception of Sabah and Sarawak, whereby JKR in these two
states is under respective state government.
The road design for this project is based on JKR design manual which is suitable for the design
of road with medium or heavy traffic. The core of design manual is the thickness design
monograph which was developed based on AASHTO design chart for pavement with terminal
serviceability index.
In Malaysia, the traditional approach widely practiced to manage storm water design where
allow developers to put in drains where appropriate. Need to determine drain size to comply
with drainage capacity. An urban drainage practice is based on the 1975 DID Urban Drainage
Design Manual, ‘Planning and Design Procedure No1: Urban Drainage Design Standard for
Peninsular Malaysia’.
Drainage system is the pattern formed by the streams, rivers, and lakes in a particular
drainage basin. They are governed by the topography of the land, whether a particular region
is dominated by hard or soft rocks, and the gradient of the land. A hydrologist often view
streams as being part of drainage basins. A drainage basin is the topographic region from which
a stream receives runoff, through flow, and groundwater flow. Drainage basins are divided
from each other by topographic barriers called a watershed. A watershed represents all of the
28
SKHPA CONSULTANT
No. 28-3, Jalan Impian Mahkota 1, Saujana
Impian, 43000 Kajang, Selangor
SKHPA Tel: 04-441 4058 Fax: 04-441 3058
CONSULTANT Email: [email protected]
stream tributaries that flow to some location along the stream channel. The number, size, and
shape of the drainage basins found in the different area and the larger the topographic map, the
more information on the drainage basin is available.
29
SKHPA CONSULTANT
No. 28-3, Jalan Impian Mahkota 1, Saujana
Impian, 43000 Kajang, Selangor
SKHPA Tel: 04-441 4058 Fax: 04-441 3058
CONSULTANT Email: [email protected]
Sewerage systems are one of the most important infrastructures in construction of residential,
industrial or commercial project as it determines the quality of life enjoyed by a community. It
consists of a network of underground sewer pipes, pump stations, sewage treatment plants and
sludge treatment facilities. This system usually operates based on by gravity due to the slope
of the pipe which reduces the high cost required for pumping.
Sewers are further classified into a few categories, which depend on the type of
wastewater that each of it carries. For example, storm sewers are designed to carry storm water
from roofs, paved areas, pavements and roads. Other, the industrial sewers are designed to
carry wastewater generate from the industry and sanitary sewers are designed to carry the waste
water from cooking and washing and the wastes from toilets.
There is another type of sewer which is known as combined sewers. These types of
sewers are designed to carry storm water, industrial wastes, and domestic sewage. In Malaysia,
many towns and cities use the separate sewer system. The wastewater is transported in separate
pipes from storm sewers, industrial sewers and sanitary sewers.
Sewerage system is very important as it helps people to transport the wastes or sewage
away from their places. Therefore, the system must be functioning well because improper
functioning system will lead to pollution and contamination of various aspects of our
surrounding which affect human life and health. Hence, regular maintenance must be done to
the existing sewerage system and appropriate design must be applied to the new sewerage
systems to ensure the sewerage systems are in good condition.
The efficiency of the sewerage system is affected by the flow of the wastewater. In
designing a sewerage system, the type and size of the pipe to be used must be able to
accommodate the peak flow. The peak flow is based on the population equivalent which is a
direct measurement of the population in an area.
When designing the sewerage, there is a standard and criteria that should be followed.
The standard code of practice for sewerage design in Malaysia (MS 1228:1991) was adopted
from British Standard; BS 8005:1987. However, British Standard may not be as applicable to
Malaysia due to the season and climate factor which have direct effect on the peak flow. This
is the main reason of doing this research to find out whether the standard is suitable to be used
in Malaysia.
30
SKHPA CONSULTANT
No. 28-3, Jalan Impian Mahkota 1, Saujana
Impian, 43000 Kajang, Selangor
SKHPA Tel: 04-441 4058 Fax: 04-441 3058
CONSULTANT Email: [email protected]
d. Details of all special sewer joints and cross sections and details of all sewer
appurtenance:
o Manholes
o Inspection chambers
o House connections
o Drop manholes
o Inverted syphons
31
SKHPA CONSULTANT
No. 28-3, Jalan Impian Mahkota 1, Saujana
Impian, 43000 Kajang, Selangor
SKHPA Tel: 04-441 4058 Fax: 04-441 3058
CONSULTANT Email: [email protected]
e. Any proposed amendments to existing systems shall be shown in red and existing
buildings, drains, sewers, appliances shown in black or otherwise distinctly
indicated by different colors.
f. All other component parts of the sewage collection and transport system
g. Bedding details for sewers
h. A manhole schedule giving a summary of all manhole details.
i. Details of existing underground services, where available.
j. All plans of proposed sewerage reticulation must have:
o A grid reference
o Relevant northing and easting coordinates
The water reticulation and internal cold-water plumbing works shall be executed by personnel
with valid permits issued by SPAN as stipulated under Water Service Industry Act 2006.
The contractor shall be responsible for employing such personnel and all the work
performed by them. Thus, the procedure for water reticulation (JKR standard specification) as
shows in Table 2.
32
SKHPA CONSULTANT
No. 28-3, Jalan Impian Mahkota 1, Saujana
Impian, 43000 Kajang, Selangor
SKHPA Tel: 04-441 4058 Fax: 04-441 3058
CONSULTANT Email: [email protected]
2.0 Excavation Before commencing the excavation of pipe trenches, the routes of the
pipelines shall be pegged out accurately. Strong sight rails shall be
fixed and maintained at each change of gradient, and at as many
intermediate points as may be necessary but not exceeding 100 metres
apart. On these rails shall be marked the centre line and level to which
the pipes are to be laid, and such rails shall be maintained in position
and at the correct level from the time the excavation commences until
backfilling is completed. The run of pipe trenches opened up ahead of
pipe laying operations at any one time shall not be more than:
i. 100 m if the pipe laying operations are in an urban area.
ii. 300 m if the pipe laying operations are in the side tables of a
trunk road, or
iii. 600 m if the pipe laying operations are in unoccupied land
schemes or housing estates under development or are in the
side tables of minor rural roads.
Precast chambers
3.0 Pipework Precast valve chambers shall be as shown on the drawings and in
accordance with section D: concrete works. Chamber covers shall
comply with BS EN 124.
33
SKHPA CONSULTANT
No. 28-3, Jalan Impian Mahkota 1, Saujana
Impian, 43000 Kajang, Selangor
SKHPA Tel: 04-441 4058 Fax: 04-441 3058
CONSULTANT Email: [email protected]
34
SKHPA CONSULTANT
No. 28-3, Jalan Impian Mahkota 1, Saujana
Impian, 43000 Kajang, Selangor
SKHPA Tel: 04-441 4058 Fax: 04-441 3058
CONSULTANT Email: [email protected]
35
SKHPA CONSULTANT
No. 28-3, Jalan Impian Mahkota 1, Saujana
Impian, 43000 Kajang, Selangor
SKHPA Tel: 04-441 4058 Fax: 04-441 3058
CONSULTANT Email: [email protected]
3.5 LANDSCAPE
Landscape stands for all actions to preserve the environment and its beauty so that people can
live in comfort and harmony. The landscape is scenery on the land and it is an art of change
the terrain view using natural elements and interesting building natural element is something
natural such as topography, water and vegetation, while building elements are constructed by
human elements such as buildings and human structures.
The infrastructure design is the part of design sewerage system, road and drainage, water
reticulation system and also earthwork for proposed Construction of 5 Storeys of Hostel at
Jalan Ayer Keroh Lama, Melaka International Trade Centre, 75450 Ayer Keroh, Melaka.
4.1 EARTHWORK
In this project, the client has appointed our company to prepare the earthwork for the building
area within a unit of 5-storey building of hostel that is located at Ayer Keroh Lama, Melaka.
Earthwork includes the excavation of existing earth materials and any placement of fill material
required for constructing the embankment. Earthwork are engineering works created through
the moving or processing of the parts of the earth’s surface involving qualities of soil or
unframed rock. The earth may be moved to another location and farmed into a desired shape
for a purpose.
36
SKHPA CONSULTANT
No. 28-3, Jalan Impian Mahkota 1, Saujana
Impian, 43000 Kajang, Selangor
SKHPA Tel: 04-441 4058 Fax: 04-441 3058
CONSULTANT Email: [email protected]
Legend
E - Existing
P - Proposed
C - Cut
F - Fill
37