This document is a maintenance checklist for an oil-free rotary compressor. It was inspected on 08 July 2013 at Coca Cola Vietnam Co., Ltd. in Da Nang. The checklist includes checks of operating parameters, filters, valves, motors, leaks, and temperatures. No urgent additional maintenance was needed beyond routine inspections and filter changes. Spare parts were adequate.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
134 views1 page
PC Rotary - Oil Free Nirvana
This document is a maintenance checklist for an oil-free rotary compressor. It was inspected on 08 July 2013 at Coca Cola Vietnam Co., Ltd. in Da Nang. The checklist includes checks of operating parameters, filters, valves, motors, leaks, and temperatures. No urgent additional maintenance was needed beyond routine inspections and filter changes. Spare parts were adequate.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1
PackageCare
Maintenance and Start-up Checklist
✔ Start-up AirCare PM Inspection Date of Inspection: ______ 08 / ______ July / ______ 2013 Compressor Type: ROTARY OIL-FREE - NIRVANA Customer Name _______________________________________________ Coca Cola Vietnam Co.,Ltd - Da Nang Model No.: ________________ Nirvana OF N55 Size (HP): _______________ 55 kW