0% found this document useful (0 votes)
134 views1 page

Certificate of Operation Lighting Distribution Panels

1) A certificate was submitted by [name] certifying that the lighting distribution panel installation is in compliance with electrical codes based on an inspection. 2) The certificate of operation is valid for one year and authorizes operation of the lighting distribution panels located at the specified address. 3) The owner is responsible for proper maintenance and no changes can be made without permits. Annual renewal of the certificate is required to continue operation.

Uploaded by

Jc Jüsäyän
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
134 views1 page

Certificate of Operation Lighting Distribution Panels

1) A certificate was submitted by [name] certifying that the lighting distribution panel installation is in compliance with electrical codes based on an inspection. 2) The certificate of operation is valid for one year and authorizes operation of the lighting distribution panels located at the specified address. 3) The owner is responsible for proper maintenance and no changes can be made without permits. Annual renewal of the certificate is required to continue operation.

Uploaded by

Jc Jüsäyän
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

NBC FORM NO.

E -11 Republic of the Philippines


City/Municipalaity of _____________________
Certificate of Operation: Province of __________________________________
Lighting Distribution Panels OFFICE OF THE BUILDING OFFICIAL

Name of Owner/Lessee

Certificate of Operation:
Located at/along
Lighting Distribution Panels
A certificate was submitted by _________________________________________
(Name) No.
a duly licensed (✓): ( ) professional electrical engineer/ ( ) registered Fee Paid
electrical engineer/ ( ) registered master electrician hired by the Official Receipt No.
Date Paid
owner who undertook the electrical inspection and that the
installation is in order. Date Issued
PRC License No.__________, Issued____________ with validity_____________
Date Date This Certificate of Operation: Lighting Distribution Panels is issued/granted

Verified as to the following pursuant to pertinent provision of the latest Philippine Electrical Code, the National Building
Code and its Implementing rules and Regulations.
Voltage_________________ Type of Enclosure __________________________
Description/Manufacturer___________________________________________
Main CB Amps Rating___________________________ Poles ________________ Name of Owner/Lessee______________________________________________________________________
No. of Branch Breakers ______________________________________________ Located at/along ___________________________________________________________________________
No. & Size of Incoming Cables per Phase_____________________________ Voltage___________________________ Type of Enclosure ______________________________________
No. & Size of Ground Wire ____________________________________________ Description/Manufacturer _________________________________________________________________
Verified on_____________________________________________________________ Main CB Amps Rating________________________________________ Poles__________________________
Expires on _____________________________________________________________ No. of Branch Breakers_____________________________________________________________________
Inspection Fee Paid____________________________________________________ No. & Size of Incoming Cables per Phase____________________________________________________
Official Receipt No.___________________________________________________ No. & Size of Ground Wire___________________________________________________________________
Date Issued____________________________________________________________
The owner/lessee shall properly maintain the electrical equipment/machinery to ensure
The above described electrical installation covered by its safe operation.
Electrical Permit No.___________________ issued on ____________________has No change, addition or upgrading/alteration deviating from the original electrical plans
been found substantially satisfactory complied, therefore the shall be made without appropriate permit.
“Certificate of Operation: Lighting Distribution Panels” is hereby The aforementioned Lighting Distribution Panels may now be operated for a period of
recommended for issuance. one (1) year from the date of inspection.
The owner/lessee of the building/structure shall notify in writing the office of the
building official for the granting/issuance of a Certificate of Operation: Lighting
Distribution Panels for a period of one (1) year from the date of issuance of this
Electrical Inspector Chief, Electrical Section certificate and yearly thereafter.
(Signature Over Printed Name) (Signature Over Printed Name) A certified copy hereof shall be posted within the premises of the building and shall not be
Date_______________________ Date_______________________ removed without authority from the building official.
_________________ ________________ _________________ ________________
PRC. REG. NO. VALIDITY PRC. REG. NO. VALIDITY

BUILDING OFFICIAL
(Signature Over Printed Name)
Chief, Chief,
Date________________________
Inspection and Enforcement Division Processing and Evaluation Division
(Signature Over Printed name) (Signature Over Printed Name)
Date_______________________ Date_______________________

You might also like