This notice from the Office of the Building Official requires the recipient to comply with several mechanical requirements within 10 days, such as applying for a mechanical permit, submitting mechanical documents and equipment for inspection and testing, and instituting corrective measures for any unsafe installations. It also directs the recipient to employ a resident mechanic, organize safety meetings, and obtain a Certificate of Operation once all requirements are met.

Uploaded by

Jc Jüsäyän
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
92 views1 page

Notice of Mechanical Requirements

This notice from the Office of the Building Official requires the recipient to comply with several mechanical requirements within 10 days, such as applying for a mechanical permit, submitting mechanical documents and equipment for inspection and testing, and instituting corrective measures for any unsafe installations. It also directs the recipient to employ a resident mechanic, organize safety meetings, and obtain a Certificate of Operation once all requirements are met.

Uploaded by

Jc Jüsäyän
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

NBC FORM NO.

M - 02

Republic of the Philippines


City/Municipality of ________________
Province of _________________________

OFFICE OF THE BUILDING OFFICIAL

NOTICE OF MECHANICAL REQUIREMENTS


_________________________
Date
____________________________
____________________________
____________________________

Sir/Madam:

In compliance with the provisions of the “National Building Code of the Philippines (PD 1096) and its
Implementing Rules and Regulations (IRR), the Philippine Mechanical Engineering Act of 1998 and the
latest Philippine Mechanical Code (PMC), you are hereby directed to comply with the following marked x
requirements within ten (10) days:
1. Apply for Mechanical Permit (NBC Form No. A-04);
2. Submit mechanical documents per Sec. 302, Sub-Section 7, Rule III of IRR;
3. Submit for inspection and test;
MACHINE / EQUIPMENT WHEN KIND OF TEST DURATION
STEAM BOILER HYDROSTATIC / EMISSION
PRESSURE VESSEL HYDROSTATIC
ELEVATOR WEIGHT / TRIP
ESCALATOR MICRO SWITCHES
ICE ORSAT / EMISSION
REFRIGERANT LINES NITROGEN
STEAM LINES HYDROSTATIC
GAS LINES PNEUMATIC
SAFETY DEVICES EFFECTIVITY

4. Institute corrective measures against unsafe mechanical installations (Sec. 215, Sub-Section
4, Rule II of IRR) at the following locations referred to latest mechanical layout submitted;
MACHINE / EQUIPMENT SHEET COORDINATES REMARKS

5. Employ a resident mechanic and/or mechanical engineer per RA 8495 and submit report;
6. Organize and regularly meet to safeguard life, health, property and public welfare per Sec.
102 of PD 1096, and submit a report;
7. Others:

8. Secure Certificate of Operation after compliance with above marked x .


INSPECTED BY: NOTED BY: RECOMMENDING ISSUANCE OF NOMR:

MECHANICAL INSPECTOR CHIEF, MECHANICAL SECTION CHIEF, INSPECTION & ENFORCEMENT DIVISION
(Signature Over Printed Name) (Signature Over Printed Name) (Signature Over Printed Name)
Date_____________________ Date_____________________ Date_____________________
______________ ______________ _____________ _____________
PRC Reg. No. Validity PRC Reg. No. Validity ISSUED BY:
RECEIVED BY:

BUILDING OFFICIAL
OWNER / REPRESENTATIVE (Signature Over Printed Name)
(Signature Over Printed Name) Date____________________
Date____________________

You might also like