0% found this document useful (0 votes)
390 views

API 650 Tank Data Sheet

This document is a data sheet for an API 650 storage tank providing key specifications and design parameters. It includes sections for general information about the tank owner, manufacturer, and location. It also includes sections for design requirements like sizing limitations, products stored, design temperatures and pressures, wind and seismic loads, shell and foundation design, roof type, and testing procedures. The level of detail provided is intended for engineering design and construction of the storage tank.

Uploaded by

Diego Flor
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
390 views

API 650 Tank Data Sheet

This document is a data sheet for an API 650 storage tank providing key specifications and design parameters. It includes sections for general information about the tank owner, manufacturer, and location. It also includes sections for design requirements like sizing limitations, products stored, design temperatures and pressures, wind and seismic loads, shell and foundation design, roof type, and testing procedures. The level of detail provided is intended for engineering design and construction of the storage tank.

Uploaded by

Diego Flor
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 10

Data Sheet Status:

API Std 650 Storage Tank


Data Sheet Page
1 of 10
*For boxes marked with *, if blank, Mfr. Shall determine and submit as per Appendix L. For all lines, see Appendix L for line-by line instructions.

GENERAL Special Documentation Package Requirements:


Measurement Units to be used in API Std 650: SI US Customary

1. Manufacturer* Contract No.* TBD


Address*
Mfg. Serial No.* Year Built* Edition & Addendum to API 650*
2. Purchaser Contract No.
Address
Tank Designation
3. Owner Operator Location
4. Size Limitations* Tank Diameter ft Shell Height ft
Capacity: Maximum* bbl Net Working* bbl Criteria:*
5. Products Stored:
Liquid Max. S.G.: at deg
Blanketing Gas Vapor Pressure PSIA at Max. Operating Temp.
% Aromatic Suppl. Spec. H2S Service? Suppl. Spec.
Other Special Service Conditions? Suppl. Specs.
DESIGN AND TESTING Purchaser to Review Design Prior to Ordering Material
6. Applicable API Standard 650 Appendices:*
7. Max. Design Temp. deg Design Metal Temp.* deg Design Liquid Level ft.
Design Pressure External Pressure Pressure Combination Factor
Maximum Fill Rate Maximum Emptying Rate
Floatation Considerations? Flot. Suppl. Spec.* Applied Suppl. Load Spec.
8. Seismic Design? Appendix E Alt. Seismic Criteria Seismic Use Group
MBE Site Class Vertical Seismic Design? Vertical Ground Motion Accelerator Av:
Basis of Lat. Accel. (Select one):
Mapped Seismic Parameters Ss S1 So I
Site-Specific Procedures MCE Design Required?
Other (Non-ASCE) Methods
Freeboard Required for SUG 1 Design Roof Tie Rods at Outer Ring?*
9. Wind Velocity for non-U.S. sites, 50-yr wind speed (3-sec Gust)* mph
Top Windgirder Style* Dimensions* Use Top WG as a Walkway?
Intermediate Wind Girders?* Intermediate Windgirder Style* Dimensions*
Check Buckling in Corroded Cond.?
10. Shell Design: 1-Ft Mthd?* Variable-Des-Pt Mthd?* Elastic Anal. Mthd?*
Plate Stacking Criteria* Centerline Stacked? Flush-Stacked?
Plate Widths (in.) (Shell course heights) and Thicknesses (in.)* Numbers Below Indicate Course Number
1. x 2. x 3. x 4. x
5. x 6. x 7. x 8. x
9. x 10. x 11. x 12. x
13. x 14. x 15. x 16. x
Joint Efficiency* % Shell-to-Bottom Weld Type* Shell-to-Bottom Weld Insp Mthd*
Approvals: Revisions (no./date) Title:
1 2 3 4 5 6 By Ckd Date
Draw. No.: Sheet 1 of 10
Data Sheet Status:
API Std 650 Storage Tank
Data Sheet Page
2 of 10
*If box is blank, Mfr. shall determine and submit as per Appendix L.

11. Open-Top and Fixed Roofs: (See Sheet 6 for Floating Roofs) Open Top?*
Fixed Roof Type* Roof Support Columns*
Cone Slope* : Dome or Umbrella IS Radius* in Weld Joints*
Seal Weld Underside of Lap Joints? ; Seal Weld Underside of Windgirder Joints?
Gas Tight? Joint Efficiency* % Roof Thickness* in
Minimum Roof Live Load psf Balanced Snow Load psf Unbalanced Snow Load psf
App. Suppl. Load Spec.* Column Lateral Load
Normal Venting Devices*: Qty Type
Emergency Venting Devices*: Qty Type
For Non-Frangible Roofs: Seal Weld Roof Plates to Top Angle IS ; Weld Rafters to Roof Plates
Roof-to-Shell Detail* Radial Projection of Horizontal Component*
12. Bottom: Thickness* in Style* Slope* : Weld Joint*
Provide Drip Ring? Alternate Spec.
SK/Ann. Ring? Annular Ring: Minimum Radial Width* in. Thickness* in.
13. Foundation: Furnished By* Type*
Soil Allow. Bearing Press.* psi Per Spec. Anchor: Size Dia Qty
Design Loads: Base Shear: Wind* Seis.* Moment: Wind* Seis.*
Ring Forces: Shell+Roof Weight New* Corroded* Roof LL* Internal Pressure*
Partial Vacuum* Wind* Siesmic*
Btm Forces: Flr Wt. New* Corr.* Prod. Wt.* Water Wt.* Int. Press.*
Partial Vacuum* Other Found. Loads* Min. Proj. of Found. Above Grade:
14. Responsibility for Heating Water, if Required?
Hydro-test Fill Height* Settlement Measure Req'd? Extended Duration of Hydro-test:
Predicted Settlement Profile is Attached
Responsibility for Setting Water Quality Suppl. Test Water Quality Spec.
Test Water Source & Disposal Tie-in Locations Hydro-test Appendix J Tank
Post-Press.-Test Activities Req'd of Mfr: Broom Clean Potable Water Rinse Dry Interior Other
List Other
15. Inspection by: Shop Field
Supplemental NDE Responsibility Supplemental NDE Spec.
Positve Material Identification? PMI Requirements:
Max. Plate Thickness for Shearing
Must Welds not exceeding .25" be Multi-Pass? Must Welds greater than .25" be Multi-Pass?
Leak Test Method: Roof* Shell* Shell Noz./MW Rein. PL*
Bottom* Floating Roof Components*
Modify or Waive API Dimensional Tolerances (see 7.5) Specify:
Specify additional Tolerances, if any, and Circumferential and Vertical Measurement Locations:
Allowable Plumbness: Measure and Record at a Min. of Locations or Every ft around the
Tank , at the Following Heights: Specify Other:
Allowable Roundness:** Measure Radius and Record at a Min. of Locations or Every ft
around the Tank, at the Following Shell Heights: Specify Other:
** See Data Sheet Instructions for the Maximaum Allowable Additional Tolerance
Approvals: Revisions (no./date) Title:
1 2 3 4 5 6 By Ckd Date
Draw. No.: Sheet 2 of 10
Data Sheet Status:
API Std 650 Storage Tank
Data Sheet Page
3 of 10
*If box is blank, Mfr. shall determine and submit as per Appendix L.

16. Coatings:
Internal Linings by: Per Spec.*
External Coating by: Per Spec.*
Under-Bottom Coating by: Per Spec.*
17. Cathodic Protection System? Per Spec.*
18. Leak Detection System? Per Spec.*
19. Release Detection Barrier? Per Spec.*
20. Tank Measurement System: Required? Remote Capability Required?
By:* Per Spec.*
21. Weight of Tank:
Full of Water* lbs Empty* lbs Shipping* lbs Brace/Lift Spec.
22. References*:

23. Remarks*:

Approvals: Revisions (no./date) Title:


1 2 3 4 5 6 By Ckd Date
Draw. No.: Sheet 3 of 10
Data Sheet Status:
API Std 650 Storage Tank
Data Sheet Page
4 of 10
*If box is blank, Mfr. shall determine and submit as per Appendix L.

Table 1 MATERIALS OF CONSTRUCTION


Component Material* C.A. (in.) Component Material* C.A. (in.)
Shell Course to Manhole Necks
Shell Course to Nozzle Necks
Shell Course to Manhole Flanges
Shell Course to Nozzle Flanges
Shell Course to Manhole Covers
Roof Nozzle Covers
Bottom Manhole Gaskets
Annular Ring Nozzle Gaskets
Anchor Attachments Internal Piping
Reinforcing Pads Wetted Structurals+
Non-Wetted Struct.+
Table 2 BOLTS and ANCHORS
Flange Bolts Head Type* Material* Nut Material* Thread Series* C.A. (in.)
Flange Bolting++
Structural Bolting++
Misc. Bolting++
Anchor Bolts++

Remarks:

Approvals: Revisions (no./date) Title:


1 2 3 4 5 6 By Ckd Date
Draw. No.: Sheet 4 of 10
Data Sheet Status:
API Std 650 Storage Tank
Data Sheet Page
5 of 10
*If box is blank, Mfr. shall determine and submit as per Appendix L.

Table 3 NOZZLE and MANHOLE SCHEDULE*


Bottom

Diameter Hor Azimuth


Mark Service (in) Depth (in) Thk (in) Rad(in) "x" Dim "y" Dim (deg) Notes

Shell

Nom. Wall Flange Flg Cl. Offset Elev. Azimuth Proj. Trim
Mark Service Dia. Thk Type or Thk Hillside (in) (in.) (deg) (in) Flush Notes

Notes:

Approvals: Revisions (no./date) Title:


1 2 3 4 5 6 By Ckd Date
Draw. No.: Sheet 5 of 10
Data Sheet Status:
API Std 650 Storage Tank
Data Sheet Page
6 of 10
*If box is blank, Mfr. shall determine and submit as per Appendix L.

Table 3 NOZZLE and MANHOLE SCHEDULE* (cont'd)


Roof

Nom. Wall Flange Flg Cl. Vert or Horz Slope Azimuth Proj. Trim
Mark Service Dia. Thk Type or Thk Radial Rad(in) Dim(in) (deg) (in) Flush Notes

Notes:

Approvals: Revisions (no./date) Title:


1 2 3 4 5 6 By Ckd Date
Draw. No.: Sheet 6 of 10
Data Sheet Status:
API Std 650 Storage Tank
Data Sheet Page
7 of 10
*If box is blank, Mfr. shall determine and submit as per Appendix L.

OTHER TANK APPURTENANCES


24. Platform: Top: Roof: Inter. Other Specify Other
Platform Material Walk. Surface Finish
Stairs: Type Specify Other Min. Width (in)
Min. Tread Max. Rise Tread Surface Tread Nose
IS Rail HR Height (in) HR Type Spec. Other Finish
Handrail: Type Spec. Other HR Height (in) Finish
Architectural/Structural Specs* National Safety Standards
Gauger's Platform Req'd? Qty. Req'd* Per Spec.*
25. Jacket Req'd?* Other Heaters/Coolers Req'd?*
Suppl. Jacket, Heater or Cooler Specs.*
26. Mixer/Agitator: Quantity Size Per Spec.*
27. Insulation: Roof Req'd? Thick Mat'l Per Spec.
Shell Req'd? Thick Mat'l Per Spec.
Purchased By: Installation By:
28. Struct. Attachments: Lifting Lugs?* Description*
Shell Anchorage?* Type* Specify Other Scaffold Cable Support?
29. Other Items: Flush Drain? Type Specify Other Size
Flush Cleanout? Size Specify Other
Ground. Lugs? Qty Type Mat'l
Waive Application of Appendix P?
Miscellany #1 Miscellany #2
Miscellany #3 Miscellany #4
Miscellany #5 Miscellany #6

Table 4 OTHER TANK APPURTENANCES*


Mark Qty Service or Description Size Orientation Elevation Material Remarks

Remarks:

Approvals: Revisions (no./date) Title:


1 2 3 4 5 6 By Ckd Date
Draw. No.: Sheet 7 of 10
Data Sheet Status:
API Std 650 Storage Tank
Data Sheet Page
8 of 10
*If box is blank, Mfr. shall determine and submit as per Appendix L.

FLOATING ROOF DATA


30. Floating Roof Selection:
Design Basis: Appendix C Appendix H
Type of Roof: (External or Internal): Sgl. Deck Pontoon* Double Deck*
(Internal Only): Tubular Pontoon* Metallic Sandwich Panel* Other
Specify Other Suppl. Spec.:
31. Seals:
Primary Seal: Shoe Envelope Wiper/Comp Plate Other Specify Other
Shoe Mechanism: Mfg. Std. Other Specify Other
Electrically Isolate Mechanism from Shoes? Wax Scrapers Required?
Nominal Shoe Thick.* Carbon Steel Shoes to be Galv.?
Secondary Seal: Shoe Envelope Wiper None Other Specify Other
32. Data for All Floating Roofs:
Overflow Openings in Shell Acceptable? Shell Extension Roof Drain Check Valves Required?
Roof Drain Isolation Valves Required? Freeze Protection for Roof Drains Req'd? Suppl. Req.
Roof Drain to Ext. Noz.: Mfg. Std. Arm. Flex Pipe Swivel/Rig. Pipe Other
Foam Dam Supplemental Spec.
Nominal Deck Thick. (in) Bulkhead Top Edges to be Liquid-Tight Seal-weld Underside of Roof
Electrical Bonding: Shunts Cables Supplemental Spec.
Qty of Non-Guide Pole Gauge Wells Qty of Sample Hatches
Guide Pole for Gauging? Slots in Guide Pole? Datum Plates? Striking Plates?
GP Emmis.-Limit. Devices: Sliding Cover Pole Wiper Float Float Wiper Pole Cap
Qty of Roof Manholes* Minimum High Roof Clearance above Bottom
Removable Leg Storage Racks? ; Leg Sleeves Fixed Low Legs
33. Additional Data for External Floating Roofs:
Weather Shield? Suppl. Spec.
Rolling Ladder Req'd? Field Adjustable Legs?
Design Rainfall Intensity In/Hr Based on a Minute Duration Associated with the Storm
Design Accumulated 24-Hour Rainfall in Based on the Storm
Distortion and Stability Determinations Required? Suppl. Spec.
Landed Live Load* lbs

Remarks:

Approvals: Revisions (no./date) Title:


1 2 3 4 5 6 By Ckd Date
Draw. No.: Sheet 8 of 10
Data Sheet Status:
API Std 650 Storage Tank
Data Sheet Page
9 of 10
*If box is blank, Mfr. shall determine and submit as per Appendix L.

34. Additional Data for Internal Flaoting Roofs:


Two Position Legs? Cable Supported Roof? Fixed Roof Inspection Hatches Required?
Internal Roof Drain Required? Omit Distribution Pads Supporting Uniform Live Loads?
Corrosion Gauge Required? Fixed Ladder required? Type of Roof Vent:*
Modified Minimum Point Load? Supplemental Specification
Mfr To Leak Test* % of Compartments in Assembly Yard in Erected Position Unknown++
Roof Erector's Floatation Test: w/Tank Hydro at completion of roof at later date Not Req'd
Floatation Test Media: Water Product Water Quality: Potable Other Specify Other
Floatation Test : Test Duration Fill Height
Flotation Test Items provided by Purchaser (see H.6.7): None List Attached
Responsible Party for Inspecting Roof during Initial Fill: Purchaser Other
Table 5 FLOATING ROOF MATERIALS
Component Mat'l/Thick.* C.A./Coat.* Component Mat'l/Thick.* C.A./Coat.*
Deck Plate Datum Plate
Inner Rim Plate Tubular Pontoon
Outer Rim Plate Pontoon Bulkhead
Foam Dam Submerged Pipe
Sandwich Panel Face Plate Guide Pole
Sandwich Panel Core Secondary Seal
Gauge Well Secondary Seal Fabric
Drain Sumps Wiper Tip
Opening Sleeves Wax Scraper
Floating Suction Lines Weather Seal
Primary Fabric Seal Envelope Fabric
Foam Log Core Shoe Mechanisms
Landing Legs Primary Seal Shoe
Landing Leg Bottom Pads Removable Covers
Manhole Necks Rolling Ladder
Vents Inlet Diffusers

Approvals: Revisions (no./date) Title:


1 2 3 4 5 6 By Ckd Date
Draw. No.: Sheet 9 of 10
Data Sheet Status:
API Std 650 Storage Tank
Data Sheet Page
10 of 10
*If box is blank, Mfr. shall determine and submit as per Appendix L.

Tank Plan and Sketches:

Notes:

Approvals: Revisions (no./date) Title:


1 2 3 4 5 6 By Ckd Date
Draw. No.: Sheet 10 of 10

You might also like