0% found this document useful (0 votes)
51 views

Chamber Mill Volume Loads and Power Drawn Calculation Existing Chamber Configuration Modify Mill Configuration

This document contains calculations for the volume loads and power drawn of an existing and modified chamber mill configuration. It analyzes the existing configuration of two chambers, then proposes modifications and recalculates the volume loads, media weights, power consumption, and power drawn per chamber for the modified configuration. The goal of the modifications is to achieve a target mill output of 135 tph while maintaining a power draw of around 38.5 kWh/t.

Uploaded by

Dilnesa Ejigu
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
51 views

Chamber Mill Volume Loads and Power Drawn Calculation Existing Chamber Configuration Modify Mill Configuration

This document contains calculations for the volume loads and power drawn of an existing and modified chamber mill configuration. It analyzes the existing configuration of two chambers, then proposes modifications and recalculates the volume loads, media weights, power consumption, and power drawn per chamber for the modified configuration. The goal of the modifications is to achieve a target mill output of 135 tph while maintaining a power draw of around 38.5 kWh/t.

Uploaded by

Dilnesa Ejigu
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 4

WORKS :- RCC

DATE :- Apr-09
MILL :- 1

CHAMBER MILL VOLUME LOADS AND POWER DRAWN CALCULATION

EXISTING CHAMBER CONFIGURATION MODIFY MILL CONFIGURATION


Chamber No. 1 2 Total/ave Chamber No. 1 2 Total/ave
Effective Length (m) 5.21 9.55 14.75 Effective Length (m) 5.21 9.55 14.75
Percent of total length 35.29 64.71 Percent of total length 35.29 64.71
Diam. inside lining (m) 4.83 4.81 Diam. inside lining (m) 4.83 4.81
Mean diameter (m) 4.82 Mean diameter (m) 4.82
Mill Speed (rpm) 14.50 14.50 Mill Speed (rpm) 14.50
Critical Speed (rpm) 19.23 Critical Speed (rpm) 19.23
Percent Critical Speed 75.41 Percent Critical Speed 75.41

VOLUME LOAD ESTIMATION VOLUME LOAD ESTIMATION


Ave Ht above charge (m) 3.3500 3.3000 Ave Ht above charge (m) 3.3000 3.2500
H/D 0.694 0.686 H/D 0.683 0.676
% Volume load 25.98 26.87 26.56 % Volume load 27.20 28.10 27.78
Chamber Volume (m3) 95.37 173.44 268.81 Chamber Volume (m3) 95.37 173.44 268.81
Media Density (t/m3) 4.300 4.500 Media Density (t/m3) 4.300 4.500
Media Volume (m3) 24.78 46.60 71.38 Media Volume (m3) 25.94 48.74 74.68
Media Weight (t) 106.55 209.70 316.25 Media Weight (t) 111.56 219.33 330.89
Chamber Free Volume (m3) 70.59 126.84 197.43 Chamber Free Volume (m3) 69.42 124.70 194.13

MILL POWER CONSUMPTION MILL POWER CONSUMPTION


Chamber nett KW (DAWN) 1727 3348 5075 Chamber nett KW (DAWN) 1781 3448 5229
Total gross KW (meter) 5200 Total gross KW (meter) 5200
Total gross HP (meter) 6973 Total gross HP (meter) 6973
Ratio Nett/Gross Power 0.976 Ratio Nett/Gross Power 1.006
Estimated Losses (%) 2.405 Estimated Losses (%) -0.557

POWER DRAWN PER CHAMBER POWER DRAWN PER CHAMBER


Current mill tph cement 135.00 tph Target mill output tph 135.00 tph
Gross Kwh/t per chamber 13.11 25.41 38.52 Gross Kwh/t per chamber 13.12 25.40 38.52

Percent Percent
of Rounded of Rounded
Chamber 1 chamber Tonnes Chamber 2 chamber Tonnes
tonnes tonnes media tonnes tonnes media
60 mm 7 15.3 17.0
90 mm 18.0 20.1 21.0 50mm 10 21.9 24.0
80 mm 43.0 48.0 50.0 40mm 8 17.5 19.0
70 mm 21.0 23.4 23.0 30mm 15 32.9 36.0
60 mm 21.0 23.4 23.0 25 mm 25 54.8 60.0
20 mm 35 76.9 85.0
Total 103.0 114.90 117.0 Total 93.0 219.3 224.0
WORKS :- RCC
DATE :- Apr-09
MILL :- 2

CHAMBER MILL VOLUME LOADS AND POWER DRAWN CALCULATION

EXISTING CHAMBER CONFIGURATION MODIFY MILL CONFIGURATION


Chamber No. 1 2 Total/ave Chamber No. 1 2 Total/ave
Effective Length (m) 5.21 9.55 14.75 Effective Length (m) 5.21 9.55 14.75
Percent of total length 35.29 64.71 Percent of total length 35.29 64.71
Diam. inside lining (m) 4.83 4.81 Diam. inside lining (m) 4.83 4.81
Mean diameter (m) 4.82 Mean diameter (m) 4.82
Mill Speed (rpm) 14.50 14.50 Mill Speed (rpm) 14.50
Critical Speed (rpm) 19.23 Critical Speed (rpm) 19.23
Percent Critical Speed 75.41 Percent Critical Speed 75.41

VOLUME LOAD ESTIMATION VOLUME LOAD ESTIMATION


Ave Ht above charge (m) 3.3200 3.4000 Ave Ht above charge (m) 3.3000 3.2500
H/D 0.687 0.707 H/D 0.683 0.676
% Volume load 26.71 24.43 25.24 % Volume load 27.20 28.10 27.78
Chamber Volume (m3) 95.37 173.44 268.81 Chamber Volume (m3) 95.37 173.44 268.81
Media Density (t/m3) 4.300 4.500 Media Density (t/m3) 4.300 4.500
Media Volume (m3) 25.48 42.38 67.86 Media Volume (m3) 25.94 48.74 74.68
Media Weight (t) 109.55 190.70 300.25 Media Weight (t) 111.56 219.33 330.89
Chamber Free Volume (m3) 69.89 131.06 200.96 Chamber Free Volume (m3) 69.42 124.70 194.13

MILL POWER CONSUMPTION MILL POWER CONSUMPTION


Chamber nett KW (DAWN) 1760 3137 4896 Chamber nett KW (DAWN) 1781 3448 5229
Total gross KW (meter) 5050 Total gross KW (meter) 5050
Total gross HP (meter) 6772 Total gross HP (meter) 6772
Ratio Nett/Gross Power 0.970 Ratio Nett/Gross Power 1.035
Estimated Losses (%) 3.042 Estimated Losses (%) -3.544

POWER DRAWN PER CHAMBER POWER DRAWN PER CHAMBER


Current mill tph cement 130.00 tph Target mill output tph 130.00 tph
Gross Kwh/t per chamber 13.96 24.89 38.85 Gross Kwh/t per chamber 13.23 25.62 38.85

Percent Percent
of Rounded of Rounded
Chamber 1 chamber Tonnes Chamber 2 chamber Tonnes
tonnes tonnes media tonnes tonnes media
60 mm 7 15.3 15.0
90 mm 18.0 20.1 20.0 50mm 10 21.9 22.0
80 mm 43.0 48.0 48.0 40mm 8 17.5 18.0
70 mm 21.0 23.4 23.0 30mm 15 32.9 33.0
60 mm 21.0 23.4 23.0 25 mm 25 54.8 55.0
20 mm 35 76.9 77.0
Total 103.0 114.90 114.0 Total 100.0 219.3 220.0