0% found this document useful (0 votes)
51 views

Standard Assessment Checklist

Uploaded by

Ovidiu Chirvase
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
51 views

Standard Assessment Checklist

Uploaded by

Ovidiu Chirvase
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

STANDARD ASSESSMENT CHECKLIST

Engineer: Technical Vetting Response No:

Site: Our Ref:

Developer:

SFA6 Compliant
Layout Foul Surface Comments
2.4.1 - Sewer Location

Adoptable sewers are laid in Adoptable / Public


Highway and/or Public-Open-Space? NB: Sewers Y/N Y/N
serving <10 properties can be located within front
gardens if 3m clearance is maintained from buildings.

2.4.3 - Kerb Lines


Sewers and manholes are positioned a suitable Y/N Y/N
distance from the kerbline? Sewers are 1m, and
manholes are 0.5m, from outside edge to the kerbline.
2.4.9 - Tree Positioning

Tree and Landscaping proposals have been submitted Y/N Y/N


and do they comply with our restrictions on planting
adjacent to adoptable and/or existing public sewers?

2.5.3 - Distance to Buildings

No buildings should be erected within the protection Y/N Y/N


strip for any existing and/or adoptable public sewers.
NB: Size of protection strip stipulated in SFA6.

Other
Y/N Y/N

SFA6 Compliant
Manholes Foul Surface Comments
2.4.2 - Requirement
Manholes are required at all changes in direction, pipe
diameter, gradient and where 2 or more sewers Y/N Y/N
connect. Distance between manholes should not
exceed 100m.
2.9 - Types
Appropriate MH Types have been used and detailed? Y/N Y/N
NB: MH Types’ A, B, C & E permitted. Where manhole
depth >6m a ‘special’ manhole detail will be required.
2.9.3 - Diameters
Manhole diameters (Type A & B only) are in Y/N Y/N
accordance with Table 2.2 of SFA6 and take into
account minimum benching requirements.
2.9.7 - Covers & Frames
Manhole covers and frames are in accordance with Y/N Y/N
Clause 5.2.32 of SFA6 and badged 'FW' or 'SW'.
2.9.11 - Rocker Pipes
Rocker pipes lengths are in accordance with Table 5.14 Y/N Y/N
of SFA6.
2.9.12 - Backdrops
Steeper gradients are preferred to the use of
backdrops. If required then they should be constructed Y/N Y/N
as external ramped backdrops as per Figure 2.10 in
SFA6.
2.9.15 - Access / Fittings
Minimum access opening sizes and fitting requirements Y/N Y/N
are in accordance with Table 2.3 of SFA6.
Other
Y/N Y/N
SFA6 Compliant
Sewers Foul Surface Comments
2.10.1 - Depths
Do the adoptable sewers have 1.2m cover and if
not are the measures taken to protect them in
Y/N Y/N
accordance with Table 2.4 of SFA6.

2.12 - Hydraulic Design - Foul


Do sewers achieve a velocity of 0.75m/s at 1/3
design flow? If not, do the gradients satisfy criteria
in SFA6? i.e. 100mm dia’ 2-9 properties connected Y/N
at 1/80 or 150mm dia’ >10 properties connected
at 1/150. (150mm dia’ 2-9 properties connected
at 1/60 also acceptable).

2.14.1 - Hydraulic Design - Surface


The system does not flood any part of the site in a Y/N
1in30 year return period.

2.14.2 - Attenuation
Storage for the 1in30 year event is wholly
contained within the adoptable system. Storage Y/N
above the 1in30 year event is private or flood
routing provided.
2.14.3 - Surcharging
All sewers are designed to run pipe full in a 1in30 Y/N
year event.

5.5.2 - Bedding
The appropriate pipe bedding details have been
provided which in most cases would be a Class 'S'
Y/N Y/N
bed and surround.

Other
Y/N Y/N
SFA6 Compliant
General Foul Surface Comments
Colouring
Drawings are coloured as per Appendix VI of SFA6 Y/N Y/N
with highway drains and private laterals
uncoloured.
Inconsistencies
Pipe lengths, gradients and sizes are consistent on Y/N Y/N
layout plans, long sections and design calculations.

Long Sections
Long section drawings also include bedding
details, concrete protection (where applicable),
Y/N Y/N
manhole types and manhole diameters.

2.4.7 - Outfalls/Headwalls
A detail of the outfall/headwall has been provided
and is in accordance with Fig 2.1 and 2.2 of SFA6
Y/N
which includes water levels.

2.4.8 - Flow control device


The relevant head/flow characteristics curve and Y/N
installation details been provided?

Impermeable Area Plan


A coloured impermeable area plan has been Y/N
provided identifying areas discharging to each pipe
line.
Private Connections
Private connections to the adoptable sewers are a Y/N Y/N
minimum 100mm diameter and laid soffit to soffit.

2.7.4 - Connection to the Public Sewer


The existing levels of the public sewer and Y/N Y/N
positions of other utility apparatus have been
established.

Other
Y/N Y/N

No works should commence on the


adoptable sewerage system until
SFA6 Compliance Met: Y / N
Anglian Water has confirmed
compliance with SFA6. Date: ___ / ___ / ____