03-Plumbing Code List
03-Plumbing Code List
ﺗﺠﺎري
Commercial
ً
ﺸﺮ ﻌﺎت اﻟﺒﻠﺪﻳﺔ وﻧﻈﻤ ﺎ اﻟﺼﺎدرة ﺳﺎﺑﻘﺎ اﻟﻜﻮد اﻟﺼﺎدر ﻻ ﻳﻠ:ﺗﻨ ﻴ ــﮫ
Attention: the Code does not supersede Municipality laws and regulations previously issued
اﻟﻘﺎﺋﻤﺔ ا ﺘﺼﺮة ﻷﻋﻤﺎل ﻛﻮد أﺑﻮﻇ اﻟﺪو ﻟﻠﺼﺮف اﻟﺼ ا ﺎص وﻛﻮد اﺑﻮﻇ اﳌﻮﺣﺪ
ﻟﻠﺼﺮف اﻟﺼ
Brief list of Abu Dhabi International Plumbing Code
The code aims to regulate the design, installation, ، اﻟﺼﻴﺎﻧﺔ، اﻟ ﻛﻴﺐ،ﺪف اﻟ ﻮد ﻟﺘﻨﻈﻴﻢ أﻋﻤﺎل اﻟﺘﺼﻤﻴﻢ
maintenance and inspection of drainage, water supply واﻟﺘﻔﺘ ﺶ ﻷﻋﻤﺎل اﻟﺼﺮف اﻟﺼ وﺷﺒ ﺎت اﳌﻴﺎﻩ و ﺻﺮف
and stormwater drain networks inside buildings. . اﻻﻣﻄﺎر داﺧﻞ اﳌﺒﺎ ﻲ
2 | P a g e Jan.‐2017
اﳌﺮﺟﻊ اﻟﺒﻨﺪ اﻟﺘﻔﺼﻴ اﻟﺒﻨﺪ اﻟﺮﺋ
Reference Detailed Article Main Article م
UPC TABLE 6- ﻳﺠﺐ ان ﺗ ﻮن اﻗﻄﺎر ﺎ ﻣﺤﺴﻮ ﺔ ﺣﺴﺐ اﻟ ﻮد و ﻤﻨﻊ اﺳﺘﺨﺪام ﻣﻮاﺳ ﻣﻌﺪﻧﻴﺔ و ان اﻗ ﺷﺒ ﺎت ﺗﻮز ﻊ اﳌﻴﺎﻩ اﻟﺪاﺧﻠﻴﺔ 2
7,6-9,CHART A5 ث/ م2.4 ﺳﺮﻋﺔ ﻟﻠﻤﻴﺎﻩ Internal water supply
Diameters shall be calculated as per the code. Use of metal pipes is networks
prohibited. Maximum water speeded shall be 2.4m/s
UPC CHAPTER ﺑﺤﻴﺚ ﺸﺒﻚ ﻋ ﺷﺒ ﺎت ﺗﺼﺮ ﻒ اﻻﻣﻄﺎر او ﺸ ﻞrain water gutter ﻳﺠﺐ ﺗﻮﻓﺮ ﻣﺰار ﺐ ﺷﺒﻜﺔ ﺗﺼﺮ ﻒ اﻻﻣﻄﺎراﻟﺪاﺧﻠﻴﺔ 3
11,1101.2,table ﺗﺼﺮ ﻒ ﺣﺮ و ﻤﻨﻊ ﺷﺒﻜ ﺎ ﻋ ﺷﺒﻜﺔ اﻟﺼﺮف اﻟﺼ وا ﺎرﺟﻴﺔ
11.3 Rainwater gutters shall be provided and shall be connected to the External and Internal
stormwater drain network or allow free flow discharge. Connection to the stormwater drain network
sewage network is prohibited
ADIPSDC ﺣﺎل ﻋﺪم وﺟﻮد ﺧﺪﻣﺎت ﺻﺮف ﺻ ﻳﺘﻢ اﻟﺮﺟﻮع ا ﻮد اﺑﻮﻇ اﻟﺪو ﻟﻠﺼﺮف اﻟﺼ ﻛﻮد اﺑﻮﻇ اﻟﺪو ﻟﻠﺼﺮف 4
TABLE 805.2 ﺣﻴﺚ ﻳﺠﺐ ﺗﻘﺪﻳﻢ805.2 ا ﺎص ﻟﻌﻤﻞ ﺧﺰان ﺗﺠﻤﻴﻊ ﻟﻠﻤﻴﺎﻩ اﻟﻌﺎدﻣﺔ ﺑ ﻢ ﺣﺴﺐ ا ﺪول اﻟﺼ ا ﺎص
ﻌ ﺪ ﻣﻦ اﳌﺎﻟﻚ ﺑﺎﻟﺼﻴﺎﻧﺔ وﻣﻮاﻓﻘﺔ ﻣﻦ ﺷﺮﻛﺔ اﺑﻮﻇ ﺪﻣﺎت اﻟﺼﺮف اﻟﺼ The Abu Dhabi
In case of absence of sewage disposal services, reference shall be made to International Private
The Abu Dhabi International Private Sewage Disposal Code to make a Sewage Disposal Code
waste water collection tank as per Table 805.2 where an undertaking
letter from the owner and an approval form the Abu Dhabi Sewerage
Services company (ADSSC) shall be provided
Upc part2 page ﺳﻢ وﻋﻤﻖ ﻻ ﻳﻘﻞ ﻋﻦ60*60 ﺣﻴﺚ ﻻ ﺗﻘﻞ اﻻ ﻌﺎد ﻋﻦ:Inspection chamberﻏﺮﻓﺔ اﻟﺘﻔﺘ ﺶ 5
86 ﻣﻠﻢ وﻟ ﺎ ﻏﻄﺎء ﻣﺤﻜﻢ ﻳﻜﺘﺐ ﻋﻠﻴﮫ ﺻﺮف4 ﺳﻢ ﻣﻌﺰوﻟﺔ ﻣﻦ اﻟﺪاﺧﻞ ﺑﻄﺒﻘﺔ اﻟﻔﺎﻳ ﺟﻼس45 اﻟﺸﺒ ﺎت ا ﺎرﺟﻴﺔ )داﺧﻞ ﺣﺪود
ﺻ اﻟﻘﺴﻴﻤﺔ(ﺻﺮف ﺻ
Inspection chambers: Dimensions shall be no less than 60*60 cm and Internal networks
depth no less than 45 cm, it shall be internally insulated with a 4mm (within the plot limits)
fiberglass coating , and have a tightly sealed cover marked (Drainage) Drainage
upc ﺣﺎل وﺟﻮد ز ﻮت و د ﻮن ﻧﺎﺗﺠﺔ ﻋﻦ اﳌﻄﺎﻋﻢ واﻟﺘﺎﻛﺪ ﻣﻦgrease traps اﻟﺘﺄﻛﺪ ﻣﻦ وﺟﻮد
1014,table10-2 .ا ﺎﻣ ﺎ و ﻣﻮاﺻﻔﺎ ﺎ ﺣﺴﺐ اﻟ ﻮد
In the case of oils and grease leading from restaurants, a grease trap shall
be provided, sizes and specifications shall be as per the code
Upc table 7-3 ﺑﺤﻴﺚ ﺴﺘﻘﺒﻞ ﺧﻂ اﳌﻴﺎﻩ اﻟﻌﺎدﻣﺔ وﻗﺒﻞ ﻏﺮف اﻟﺘﻔﺘ ﺶ و ﻮن اﺗﺠﺎﻩ: gully trapا ﺗﺮاب
ﻣﻢ و ﻌﺰل ﺑﻤﺎدة اﻻﻳﺒﻮﻛ160/100 اﻟﺼﺮف ﺑﺎﺗﺠﺎﻩ ﻣﻴﻮل اﻟﺸﺒﻜﺔ وﻗﻄﺮ ﺎ
Gully traps: shall receive wastewater before the inspection chambers. The
drainage direction shall be in the same slope direction of the network.
Diameter shall be 100/160 mm and epoxy insulated.
Upc table 7- %1 ﻣﻢ واﳌﻴﻮل160 اﻗﻄﺎر وﻣﻴﻮل واﻧﻮاع ﻣﻮاﺳ اﻟﺼﺮف ﺑ ن ﻏﺮف اﻟﺘﻔﺘ ﺶ ﺣﻴﺚ اﻟﻘﻄﺮ
3AND 7-1 upvc cl-16 واﻻﻧﻮاع
Diameters, slopes and types of pipes between inspection chambers shall be
of 160mm diameter, 1% slope and upvc cl-16 types
Adm SD306 . (وﺻﻠﺔ اﻟﺴﻘﻮط ﻳﺠﺐ ان ﻳ ﻮن ﻓﺘﺤﺔ ﻟﻠﺘﻨﻈﻴﻒ ﻣﻦ اﻋ اﳌ ﻮلback drop)
Back drop pipe shall have cleanout opening from manhole top
3 | P a g e Jan.‐2017
Upc 1002.2 ﻳﺠﺐ ﻮ ﺔ اول ﻏﺮﻓﺔ ﺗﻔﺘ ﺶ اﻟﺸﺒﻜﺔ ا اﻟﺴﻄﺢ ﻣﺒﺎﺷﺮة و ﻤﻨﻊ رﻄ ﺎ ﺑﺎي: (vent)اﻟ ﻮ ﺔ
ﺗﻮﺻﻴﻼت داﺧﻠﻴﺔ ﻛﺬﻟﻚ ﻳﺠﺐ ﻮ ﺔ ﻣﺼﺎﺋﺪ اﻟﺪ ﻮن و ﻏﺮف ﻣ ﺎت اﻟﺮﻓﻊ اﻟﻘﺒﻮ
Vent: first inspection chamber shall be vented from the surface directly.
Connection to any internal connections is prohibited. Grease traps and
basement sump rooms shall be vented.
Adm SD310 وﻟﮫ، ﺳﻢ200 ﺳﻢ و ﻳﺒﺪأ ﻌﻤﻖ120 ﻳ ﻮن ﻗﻄﺮة اﻟﺪاﺧ ﺑﺪأ ﻣﻦ:(manhole)اﳌﺎ ﻮل
ﻳﺒﻄﻦ، وﻟﮫ ﻏﻄﺎء ﻣﻦ ا ﺪﻳﺪ، ﺸﻜﻴﻞ داﺧ ﻟﻠﻘﺎﻋﺪة ﻣﻦ ﻗﻨﺎة ﻧﺼﻒ داﺋﺮ ﺔ وﻣﻴﻮل ﺟﺎﻧ ﻴﺔ
. ﻣﻠﻠﻴﻤ4 ﻣﻦ اﻟﺪاﺧﻞ ﺑﻤﺎدة اﻟﻔﺎﻳ ﺟﻼس ﺴﻤﻚ
Manholes: Internal dimensions of the manhole shall be starting from 120
cm diameter and200 cm depth. The internal shape of the base shall be of a
semicircular channel and side slopes. It shall have a cast-iron cover, and
4mm thick fiberglass lining
ﻣﺨﻄﻄﺎت ﻣﻠﻮﻧﺔ ﻣﻴﺎﻩ اﻟﺘﻮز ﻊ ﻤﻴﻊ اﻟﻄﻮاﺑﻖ واﳌﺴﺎﻗﻂ اﻟﺮاﺳﻴﺔ واﻟﺘﻔﺎﺻﻴﻞ ﻣﻘﻴﺎس رﺳﻢ ﻣﺘﻄﻠﺒﺎت ﺗﻘﺪﻳﻢ ا ﻄﻄﺎت 6
DWF ﻟﻠﺘﻔﺎﺻﻴﻞ ﺟﻤﻴﻌ ﺎ ﺑﺼﻴﻐﺔ1:50 ﻟﻠﻤﺨﻄﻄﺎت و1:100 Requirements for drawing
Colored drawings for water supply for all floors, sections, and details. submission
Drawings shall be scale 1:100 , Details shall be scale 1:50 .
All drawings shall be in DWF format
ﻣﺨﻄﻄﺎت اﻟﺼﺮف اﻟﺼ و ﺗﺼﺮ ﻒ اﻻﻣﻄﺎر ﻤﻴﻊ اﻟﻄﻮاﺑﻖ واﳌﺴﺎﻗﻂ اﻟﺮاﺳﻴﺔ
DWF ﻟﻠﺘﻔﺎﺻﻴﻞ ﺑﺼﻴﻐﺔ1:50 ﻟﻠﻤﺨﻄﻄﺎت و1:100 واﻟﺘﻔﺎﺻﻴﻞ ﻣﻘﻴﺎس رﺳﻢ
Sanitary drainage & stormwater drainage drawings for all floors & sections
Drawings shall be scale 1:100 , Details shall be scale 1:50 .
All drawings shall be in DWF format
WDN+ RISER DIAGRAM ﻢ ﺧﺰاﻧﺎت اﳌﻴﺎﻩ ﻣﻌﺘﻤﺪة ﻣﻦ ﺷﺮﻛﺔ اﺑﻮﻇ ﻟﻠﺘﻮز ﻊ
Tank sizes approved by Abu Dhabi distribution company
ﺪﻣﺎت اﻟﺼﺮف اﻟﺼ اﻳﻀﺎح ﺧﺪﻣﺎت ﻣﻦ ﺷﺮﻛﺔ اﺑﻮﻇ
Services of Abu Dhabi Sewerage Services Company (ADSSC) shall be
clarified /indicated
ﻧﻘﺎط ر ﻂ ﻣﻴﺎﻩ اﻻﻣﻄﺎر ﻣﻦ اﻟﺒ ﻴﺔ اﻟﺘﺤﺘﻴﺔ واﻟﻄﺮق ﺑﻠﺪﻳﺔ اﺑﻮﻇ ان وﺟﺪت
Stormwater connection points issued from the department of
transportation and infrastructure in Abu Dhabi Municipality – If available-
و ﻮد ا ﺴﺎﺑﺎت اﻟﺘﺼﻤﻴﻤﻴﺔ ﻟﺸﺒﻜﺔ ﺗﻮز ﻊ اﳌﻴﺎﻩ ﺣﺴﺐ ﻮد اﺑﻮﻇ اﳌﻮﺣﺪ ﻟﻠﺼﺮف اﻟﺼ
(اﺑﻮﻇ اﻟﺪو ﻟﻠﺼﺮف اﻟﺼ ا ﺎص )ﻟﻠﻤﺸﺎر ﻊ اﻟﻨﺎﺋﻴﺔ
Design calculations for the water distribution network as per the Abu
Dhabi unified sewerage code and the Abu Dhabi International Private
Sewage Disposal Code (Remote projects)
.ﻟ ﺸﻐﻴﻞ ﻣﺤﻄﺎت اﳌﻌﺎ ﺔ )ﻣﺮﺣﻠﺔ ﺴﻠﻴﻢ اﳌﺸﺮوع( ان وﺟﺪتRSB ﻳﻄﻠﺐ ﺗﺮﺧﻴﺺ ﻣﻦ
Permit shall be obtained from RSB to operate treatment plants (project
handover stage) if available
%100 ﻳﺠﺐ ﻋﻠﻰ ﺍﻻﺳﺘﺸﺎﺭﻱ ﺍﻻﻟﺘﺰﺍﻡ ﺑﺠﻤﻴﻊ ﺑﻨﻮﺩ ﺍﻻﺷﺘﺮﺍﻁﺎﺕ ﺍﻟﺘﺨﻄﻴﻄﻴﺔ ﺍﻟﻮﺍﺭﺩﺓ ﺃﻋﻼﻩ ﺑﻨﺴﺒﺔ: ﻣﻼﺣﻈﺔ
Note: Consultants shall comply 100% with all planning articles mentioned above.
4 | P a g e Jan.‐2017