Sl. No. Description Previous Day Present Day Cumulative Quantity Plate Thickness
The document provides a daily progress report for the fabrication yard and laying site from a pipeline project. It summarizes the quantities completed for various fabrication activities like edge cutting, rolling, fitting, welding, testing, coating, and laying. It also provides details of the chainage and quantities laid by different contractors working on the laying site with a total of 132 meters laid so far.
Download as XLSX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
44 views
Sl. No. Description Previous Day Present Day Cumulative Quantity Plate Thickness
The document provides a daily progress report for the fabrication yard and laying site from a pipeline project. It summarizes the quantities completed for various fabrication activities like edge cutting, rolling, fitting, welding, testing, coating, and laying. It also provides details of the chainage and quantities laid by different contractors working on the laying site with a total of 132 meters laid so far.
DAILY PROGRESS REPORT ON LAYING SITE DATE :13-02-2021
MS PIPELINE LAYING DETAILS CHAINAGE IN MTRS LAYING DETAILS ( IN NOS) SL.NO CONTRACTOR NAME TOTAL MTRS AS ON REMARKS FROM TO TODAY TOTAL YESTRDAY 1 UBEN PROJECTS 585 952.5 367.5 49 0 49 Work in Progress 2 MAHENDRA REDDY KOKU 1300 1577.5 277.5 37 0 37 Work in Progress 3 JITEESH INFRASTRUCTURE 2300 2315 15 2 0 2 Work in Progress 4 BEM ENTERPRISES 4830 4935 105 14 0 14 Work in Progress 5 RGN ENTERPRISES 5800 6025 225 30 0 30 Work in Progress