0% found this document useful (0 votes)
229 views

Project: EXPO 2020 - OV016 - USA PAVILION Inspection and Test Plan (Itp)

This document provides an inspection and test plan (ITP) for structural steel installation work on the EXPO 2020 USA Pavilion project. The ITP outlines inspection requirements and acceptance criteria for various stages of work including: document approval, equipment calibration, welding procedures, material inspection, fabrication activities like fitting, welding and non-destructive testing, and surface preparation work like abrasive blasting and painting. Inspections will be carried out by personnel from German Steel Contracting and subcontractors, and include visual and dimensional checks, review of test reports and certification documents.

Uploaded by

qc_531040655
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
229 views

Project: EXPO 2020 - OV016 - USA PAVILION Inspection and Test Plan (Itp)

This document provides an inspection and test plan (ITP) for structural steel installation work on the EXPO 2020 USA Pavilion project. The ITP outlines inspection requirements and acceptance criteria for various stages of work including: document approval, equipment calibration, welding procedures, material inspection, fabrication activities like fitting, welding and non-destructive testing, and surface preparation work like abrasive blasting and painting. Inspections will be carried out by personnel from German Steel Contracting and subcontractors, and include visual and dimensional checks, review of test reports and certification documents.

Uploaded by

qc_531040655
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Document No: GSC/EUS/ITP-2020-001

Revision: 00
Project: EXPO 2020 – OV016 – USA PAVILION
Date: 04/04/2020
Sheet No:
INSPECTION AND TEST PLAN (ITP) Discipline: Structural Steel 1

ITP Particular Details: Installation of Structural Steel Works


German Steel Contracting LLC

Record / Verifying Inspection By


S.I Stage / Activity Specification / Acceptance Criteria Test Frequency Required Test
Documents GSC ELEC TPI KAA

1.0 Documents:

Approval of controlling
documents (Method
Statement, QC process,
Prior to starting
1.1 Material Approval, Contract Documents / Project Specifications. Submittal Record review H H --- R
works
Supplier Approval, Shop
Drawings and
calculations)

Prior to starting Calibration


1.2 Calibration of equipment. Contractor Quality Plan (CQP). Record review R R --- R
works. certification and log.

Once Before work


1.3 Welding Procedure Approved WPS/PQR PQR/WPS Record review H R --- R
commencement

Approved WPS/PQR Once Before work


1.4 Welder Qualifications Welders Certificates Record review H R --- R
Approved welder certification commencement

2.0 Pre-works:
Material Inspection request
Inspection of incoming 100% Each Material Inspection
2.1 Visual Inspection I R --- R
materials Delivery reports

100% Each
2.2 Conformity of materials Mill Test Certificates MTCs Review Documents I R --- R
delivery

3.0 Fabrication Activities:


Document No: GSC/EUS/ITP-2020-001
Revision: 00
Project: EXPO 2020 – OV016 – USA PAVILION
Date: 04/04/2020
Sheet No:
INSPECTION AND TEST PLAN (ITP) Discipline: Structural Steel 2

ITP Particular Details: Installation of Structural Steel Works


German Steel Contracting LLC

Record / Verifying Inspection By


S.I Stage / Activity Specification / Acceptance Criteria Test Frequency Required Test
Documents GSC ELEC TPI KAA

Fit-up & Dimension


3.1 Fit-up/Dimensions check Fabrication Drawings, AWS D1.1 & AISC 303 All Dimension I/H R --- R
Inspection Reports

Qualified Welder Record review


3.2 AWS D1.1 All Welder Certificate R R --- R
Certificate

Monitoring
Welding Operation Visual Inspection
3.3 AWS D1.1 All I R --- R
Report

100% for Full


Ultrasonic Testing
NDT Test Penetration welds
NDT Reports from
3.4 NDT - Non Destructive AWS D1.1 and NDT Procedures I/H R I R
third party Magnetic Particle
Testing 10% for Fillet
Testing
Welds
Final Inspection after Visual Inspection
3.5 Completion of all fabrication stages, AWS D1.1 All Visual Inspection I R --- R
Welding Report

4.0 Abrasive Blasting/Galvanizing/Painting

SA 2.5 SSPC10
Surface Preparation
4.1 Abrasive Blasting All Area Visual Inspection I R --- R
& Painting Reports
Profile 45-70µm and manufacture’s requirements
Daily Temperature
4.2 Ambient conditions Project Specifications Daily Record
Record review R R --- R

Galvanizing Coating (If


4.3 ASTM A123 or BS EN ISO 4606 All Area Galvanizing Report Visual Inspection I I --- I
applicable)
Document No: GSC/EUS/ITP-2020-001
Revision: 00
Project: EXPO 2020 – OV016 – USA PAVILION
Date: 04/04/2020
Sheet No:
INSPECTION AND TEST PLAN (ITP) Discipline: Structural Steel 3

ITP Particular Details: Installation of Structural Steel Works


German Steel Contracting LLC

Record / Verifying Inspection By


S.I Stage / Activity Specification / Acceptance Criteria Test Frequency Required Test
Documents GSC ELEC TPI KAA

Surface Preparation
4.4 Paint Application Approved Paint system All Area Visual Inspection I R --- R
& Painting Reports
Surface Preparation
4.5 DFT Measurement As per Paint Data Sheet Spot Physical inspection I/H R --- R
& Painting Reports

5.0 Installation of Steel Structures

Incoming fabricated
material on Site and
Material Inspection
Installation of Steel Erection Drawings GA / Shop Drawings All Area Visual Record H S
5.1 Request MIR --- S
Structure members Review

Final fit up ,
All Area
5.2 Erection of structural steel Must achieve Project requirements Approved IR Visual Inspection H S --- S
members
Bolt fixing
Site welding for Visual Inspection/
All Area
5.3 Adjustment of the steel Must achieve Project requirements Approved IR Dimensional I R --- R
members. inspection
15 Degree Bend
Test for 5% of the
studs, selected at
5.4 Bend test of Shear Studs Must achieve Project requirements Approved IR Physical test H S --- R
random, minimum
2studs per erected
member.
Document No: GSC/EUS/ITP-2020-001
Revision: 00
Project: EXPO 2020 – OV016 – USA PAVILION
Date: 04/04/2020
Sheet No:
INSPECTION AND TEST PLAN (ITP) Discipline: Structural Steel 4

ITP Particular Details: Installation of Structural Steel Works


German Steel Contracting LLC

Record / Verifying Inspection By


S.I Stage / Activity Specification / Acceptance Criteria Test Frequency Required Test
Documents GSC ELEC TPI KAA

100% for Full Ultrasonic Testing


NDT Test
Penetration welds
5.4 NDT - Non Destructive NDT Reports from I/H W I W
AWS D1.1 and NDT Procedures 10% for Fillet Magnetic Particle
Testing third party
Welds Testing

Final Alignment and Bolt Approved Method Statement & AISC – RCSC - 2014 (includes
Torque tightening Approved IR Bolt Torque
5.5 April 2015 Errata) Specification for Structural Joints using All I/H W --- W
Tightening Report
ASTM A325 or A490 Bolts and ASTM F3125

Involvements Inspection Codes

GSC: Sub contractor (German steel) TPI – Third Party Inspection / Laboratory Inspection W – Witness : Notification required (IR) Presence not mandatory I - Inspection.
ELEC: Main contractor (Electra Solutions) KAA – Engineer (Khatib & Alami) H – Hold Point: Notification required (IR) Presence mandatory R – Review S - Surveillance –
Surveillance –
Surveillance

NAME POSITION SIGNATURE DATE

Prepared by: IHSAN NASWEEF TECHNICAL ENGINEER 04/04/2020

Reviewed by: SUMIT PROJECT MANAGER 04/04/2020

Approved by: SHAIK IBRAHIM QC MANAGER 04/04/2020


Document No: GSC/EUS/ITP-2020-001
Revision: 00
Project: EXPO 2020 – OV016 – USA PAVILION
Date: 04/04/2020
Sheet No:
INSPECTION AND TEST PLAN (ITP) Discipline: Structural Steel 5

ITP Particular Details: Installation of Structural Steel Works


German Steel Contracting LLC

Record / Verifying Inspection By


S.I Stage / Activity Specification / Acceptance Criteria Test Frequency Required Test
Documents GSC ELEC TPI KAA

Approved by: