0% found this document useful (0 votes)
59 views18 pages

TECHNICAL Aspect Invesment

The document discusses the technical and operational aspects of renovating a building for New Era University. It provides a detailed list of renovation materials needed, suppliers, quantities, unit prices, and total costs. The total cost of materials is estimated to be 140,837.34 PHP with an additional 150,000 PHP for labor, bringing the total renovation cost to 290,837.34 PHP. It also outlines the business hours, delivery schedules, operating schedules, employee schedules, business processes, and utilities (electricity, water, telephone, internet, waste disposal) for New Era University.

Uploaded by

Hanzo vargas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
59 views18 pages

TECHNICAL Aspect Invesment

The document discusses the technical and operational aspects of renovating a building for New Era University. It provides a detailed list of renovation materials needed, suppliers, quantities, unit prices, and total costs. The total cost of materials is estimated to be 140,837.34 PHP with an additional 150,000 PHP for labor, bringing the total renovation cost to 290,837.34 PHP. It also outlines the business hours, delivery schedules, operating schedules, employee schedules, business processes, and utilities (electricity, water, telephone, internet, waste disposal) for New Era University.

Uploaded by

Hanzo vargas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 18

TECHNICAL/OPERATIONAL ASPECT

Construction of the building, lease contract or re


New Era University
No.9 Central Avenue, New Era, Quezon City,
Tel. No. (632) 981-4227/
1107Fax No. (632) 981-4241

Floor Plan

106 | P a g e
New Era University
No.9 Central Avenue, New Era, Quezon City, 1107
Tel. No. (632) 981-4227/ Fax No. (632) 981-4241

Land, Building, facilities and Equipment needed and cost

RENOVATION MATERIALS

MATERIALS PICTURE SUPPLIER QTY. UNIT UNIT TOTAL AMOUNT


PRICE

Angular bar 2’ ABRIS 50 Pcs. 221 PHP 11,050


HARDWARE

Tubular 2x3 ABRIS 30 Pcs. 200 PHP 6,000


HARDWARE

Hard flex ABRIS 30 Pcs. 480 PHP 14,400


plywood ¼ HARDWARE

107 | P a g e
Text Screw ABRIS 4 Kg. 280 PHP 1,120
HARDWARE

Metal roof 1x10 ABRIS 12 Pcs. 475 PHP 5,700


HARDWARE

Gutter ABRIS 6 Pcs. 3,750 PHP 22,500


HARDWARE
Umbrella nail ABRIS 2 Kg. 120 PHP 240
HARDWARE

Common nail ABRIS 3 Kg. 70 PHP 210


3” HARDWARE

Common nail ABRIS 2 Kg. 70 PHP 140


1” HARDWARE

Common nail ABRIS 2 Kg. 70 PHP 140


2” HARDWARE
Concrete nail ABRIS HARD 1 Kg. 55 PHP 55
WARE

Steel bar 12” ABRIS 36 Pcs. 221 PHP 7,956


HARDWARE

Hollow blocks ABRIS 600 Pcs. 18 PHP 10,800


HARDWARE

Cement ABRIS 50 Bags 259 PHP 12,950


HARDWARE
Sand ABRIS 2 Elf. 1,435 PHP 2,870
HARDWARE

Gravel ABRIS 2 Elf. 1,310 PHP 2,620


HARDWARE

Paint roller WILCON 3 Pcs. 50 PHP 150


Paint (enamel WILCON 16 L. PHP 3,200
white) 16 L

Paint (latex WILCON 16 L PHP 2,770


Paint flat) 16 L

Latex ( Paint WILCON 16 L PHP 2,699


acrylic) 16 L
Roll up 4x9 ABRIS 2 Pcs. 7,000 PHP 14,000
HARDWARE

PVC PIPE 3” ABRIS 6 Pcs. 550 3,300


HARDWARE

PVC PIPE 2” ABRIS 3 Pcs. 438.78 PHP 1,316.34


HARDWARE
BLUE PIPE ½ ABRIS 10 Pcs. 50 PHP 500
HARDWARE

Electrical WILCON 1 roll 7,195 PHP 7,195


stranded wire
3x0

Led light WILCON 5 pcs 313 PHP 1,565


GI WIRE WILCON 10 Kg. 35 PHP 350

Plywood 3/4 for ABRIS 6 Pcs. 1,290 PHP 7,740


rice divider HARDWARE

Total PHP 140,837.34

Labor PHP 150,000.00

TOTAL PHP 290,837.34


New Era University
No.9 Central Avenue, New Era, Quezon City,
1107 Tel. No. (632) 981-4227/ Fax No. (632)
981-4241

Business days and hours

Store Schedules

Day Hours

Monday 8:00 am – 3:00 pm

Tuesday 1:00 pm – 10:00 pm

Wednesday – Sunday 8:00 am – 10:00 pm

Holidays 8:00 am – 7:00 pm

Delivery Schedules

Day Morning Time Afternoon Time

Monday 8:00 am – 12:00 nn X

Tuesday X 1:00 pm – 5:00pm

Wednesday 8:00 am – 12:00 nn 1:00 pm – 5:00pm

Thursday 8:00 am – 12:00 nn 1:00 pm – 5:00pm

Friday 8:00 am – 12:00 nn 1:00 pm – 5:00pm

Saturday 8:00 am – 12:00 nn 1:00 pm – 5:00pm

Sunday 8:00 am – 12:00 nn 1:00 pm – 5:00pm

No Delivery on Holidays

116 | P a g e
New Era University
No.9 Central Avenue, New Era, Quezon City,
1107 Tel. No. (632) 981-4227/ Fax No. (632)
981-4241

Operating Schedule

Operation Hours

Cleaning and organizing facilities 6:00 am – 6:30 am

Checking and maintenance of equipment 6:30 am – 7:30 am

Cleaning post 7:30 am – 8:00 am

Operating time 8:00 am

Lunch break 12:00 nn – 1:00 pm

Shifting change 2:30 pm – 3:00 pm

Coffee break 2:30 pm – 3:00 pm

Lunch break 6:00 pm – 7:00 pm

Coffee break 8:30 pm – 9:00 pm

Preparation for closing 9:30 pm – 10:00 pm

Closing time 10:00 pm

Cleaning and checking equipment and 10:00 pm – 10:30pm

facilities / Account total sales for the

whole day

117 | P a g e
Employee’s Schedules

Position Schedule Schedule Holidays Holidays

( Opening (Closing Shift) Schedule Schedule

Shift) (Opening Shift) (Closing Shift)

Manager 7:00 am – 4:00 2:30pm – 7:00 am – 1:00 12:30 pm – 7:30

pm 10:30pm pm pm

Sales Clerk 7:00 am – 4:00 2:30pm – 7:00 am – 1:00 12:30 pm – 7:30

pm 10:30pm pm pm

Cashier 7:00 am – 4:00 2:30pm – 7:00 am – 1:00 12:30 pm – 7:30

pm 10:30pm pm pm

Driver 7:00 am – 4:00 2:30pm – 7:00 am – 1:00 12:30 pm – 7:30

pm 10:30pm pm pm

Inventory 7:00 am – 4:00 X 7:00am – 1:00pm X

Clerk pm
Business Processes and Flow Chart
OPERATING CYCLE

Choose of product

Delivery and Equipment -Business


-Single customer

Purchased

This operating cycle chart this cycle is use by our business to operate a good

system and to have a good transaction and affordable service to our customers. The

first step you will go to our store to choose what product of rice or quality of rice that you

want. Second step is how many sacks of rice that you want or you want is to buy kilos of

rice only. Third step if you deal with the product you can now purchase. Fourth step we

can now deliver it at you place or business established or to your house if you buy

sacks of rice.
Utilities Electricity, Water, Telephone, Internet

Electrical Supply

Electrical supply will be provided by Meralco. The establishment already has a

pre- installed electrical connection.

Water Supply

Water supply is provided by Maynilad Water Services, Inc. It is vital to maintain

and to keep the facility clean and presentable all the time.

Communication Line

The business will subscribe to PLDT PLAN for the telephone and internet

connections.

Waste Disposal

The establishment will provide recycled and labeled garbage can to segregate its

waste to biodegradable and non-biodegradable. The garbage collector will collect it on

scheduled day.

A biodegradable material can be defined as a material which can be

decomposed by b bacteria or other natural organisms and not be adding to pollution.

Biodegradable waste can be commonly found in municipal solid waste as green waste,

food waste, paper


waste, and biodegradable plastics. Other biodegradable wastes include

human waste, manure, sewage, slaughterhouse waste.

A Non-Biodegradable material can be defined as a kind of substance which cannot be broken


down by natural organisms and acts as a source of pollution. Waste that cannot be
decomposed by the biological processes is

You might also like