Thesis Topic Selection
Thesis Topic Selection
Thesis Topics
Suman Saurabh
SPA/NS/LA/665
EGL HAL
Business Airport
Park
30 MLD
Divyashri STP
HAL Airport
Technopark
DRDO Yelameru
NAL Wind
Tunnel
60 MLD
STP
SITE
Kadubeesanhali
Techno Park
Army Service
Corps
Bellandur
New Horizon
Lake
College of Eng.
Orchid Lake
View
Bellandur
1st Block
Kormangala Ilbur Firing Embassy Outer Ring Road
Adarsh Palm
Range Prestige Suncity Retreat
Apartments Apartments
Phase 3
Agara
Lake
Saul
HSR Layout Kaikondharali
Kere
Kemapura
SITE AREA:
120 acres
60 MLD
STP
12 M
WIDE
ROAD
Bellandur
Lake
(797 acres)
Bellandur
Outer Ring
Road
Green Glen Adarsh
layout Palm
Outer Ring Retreat
HSR
Layout Road
Purpose of Rejuvenation BDA’s Rejuvenation Plan
• Bellandur Lake is one of the oldest and largest lake of • De-watering & De-silting of Lake
Bengaluru that was the lifeline for the surrounding • Formation of bunds adjacent to the main bund
villages a few decades ago. Farmers used to cultivate • Formation of Walkway Bund
paddy and vegetables on the fertile land next to the lake. • Construction of Wetlands
• Children’s Play Area & Gym
• Bellandur lake is a part of Varthur lake series and is now • Amphitheatre
one of the most polluted lakes in Bengaluru. • Gazebos
• Water Sports
• Due to untreated sewage disposal and lack of effluent • Landscaping
treatment of industrial wastes the lake has now been • Bio-Diversity Park (NGT)
converted from a bountiful lake to a sewage tank. • Construction of Kalyani
Apart from the above program, the silt from the lake will be given
• The degradation of the lake was evident since the late 20th to farmers for free and will be used in the proposed Bio-Diversity
century, however, it came under global attention after the Parks.
excess foam formation and lake fire in the year 2015 &
2018.
Site Justification & Alternate Rejuvenation
• NGT demanded the BDA and BWSSB to formalize a
rejuvenation plan for the lake in 2018 urgently. Plan
• The lake is in utmost need for rejuvenation from the
conditions if the lake. While other lakes in Bengaluru have
been revived and made a part of the city’s resource, Bellandur
Lake has been ignored for decades.
Prestige
Lakeside
Vista Prestige
Lake Ozone Agricultural Area
Patel
Narayanswamy
layout
UKN SITE
Espreanta Valepura
Apartments
Varthur Road
VIBGYOR
High School Sorahunase
Varthur
Lake
Bellandur
Amankere
Chinappa
Layout
Kaveri Nagar
Balagere
Prestige
Lakeside
Habitat
Whitefield Apartments
Land Use Plan
Master Plan 2015 (Existing) Master Plan 2031 (Proposed)
Valepura
30 M
WIDE
ROAD
Varthur
Lake
(445 acres)
Bellandur
Amankere
Madhurangara
KSM
Balagare LAYOUT
Road
Purpose of Rejuvenation Rejuvenation Proposals & Steps
• Varthur Lake is a downstream lake in the Varthur lake • Watershed/catchment treatment
series and receives water from the Bellandur Lake nad • Improvement of inlet points & Silt traps
surrounding areas. It is second largest lake of the city and • Construction of Wetlands
receives 40% of the city’s sewage. • Dredging & De-silting
• Shoreline Treatment, 30M Buffer
• Due to rapid urbanisation of nearby area with residential • Green Buffers
apartments and IT companies the lake has degraded due • Functioning of STPs
to sewage and industrial wastes being dumped in the lake • Promote Eco-tourism
and the upstream lake. • Water Boat Jetty
• Food Court, Children’s Park
• Due to lack of dependence on the lake as source of water • Community Participation
and reduced supervision the lake has degraded over time • Bio-Diversity Park (NGT)
along with reduction in capacity of the lake from 6.10 Mm3
to 1.61 Mm3. Site Justification & Alternate Rejuvenation
• Varthur lake being the downstream lake also caught fire Plan
and was filled with foam in 2015.
• The lake is in need for rejuvenation due its increasingly
• NGT demanded the BDA and BWSSB to formalize a deteriorating conditions. The untreated water from Bellandur
rejuvenation plan for the lake in 2018 urgently. lake directly ends up in the lake further polluting the Pinakani
River Basin.
• With the ecological services of the park the water from the
lake can further be treated naturally and would be beneficial
at regional level.
Context & Site Images
03
Ecological Restoration &
Eco-recreational Park,
Pashan Lake
Pune, MH
ShivNagar Jai
Bhawa
ni Park DRDO
Dargah Shopping
Complex
SITE
Shiv Nagar
Sunarwadi
High Energy Pashan
Materials Lake DRDO Colony
Research Lab
Necklace
Garden
Ramnagar
Prestige
Lakeside
Habitat
HEM Research Lab
Land Use
Master Plan
Pashan
SITE AREA: Lake
60 acres
(135 acres)
DRDO
Colony
HEM
Research
Lab
SITE AREA:
70 acres
Sunarwadi
Mum-Pune BEL
Bypass Rd
Ramnagar
Purpose of Restoration Existing Program
• The ESR by PMC in 2017 shows the rise in BOD & COD
levels, despite an ecological restoration of the lake • Mass Plantation along highway
that occurred in 2015. • Shopping Street
• Nursery
• The basic works of beautification instead of saving • Food Court
the lake has destroyed the shoreline habitats and • Restaurant
habitation of migratory birds. • Jogging tracks
• Ghats
• Pashan Lake being a wetland used to have its own • Crematorium
ecosystem with dense vegetation and rare aquatic • Musical Fountain
plants. Such an ecosystem was habitat for migratory • Island
birds. • Littoral Zone
• Due to the creation of gabion walls and concrete Site Justification & Restoration Plan
walls on the shoreline the edge ecology has been
destroyed which has resulted in less birds and • The lake is in need for a proper ecological restoration. There
further increase in water hyacinths. is an opportunity to revive the ecological character of the lake
that previously existed.
• The untreated water from Ramnadi river enters the
lake directly. • Natural Shoreline treatment along with reviving wetlands will
bring back the migratory birds.