WPS & PQR Flow Chart For Code Construction

The document outlines the process for code construction involving welding procedure specifications (WPS) and procedure qualification records (PQR). It involves first checking material specifications and welding processes, then preparing preliminary WPS and PQR documents. If the PQR specimen is not accepted, the WPS and PQR must be revised. If accepted, the WPS can be used for code construction and the PQR is certified.

Uploaded by

saka margaredi
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
603 views

WPS & PQR Flow Chart For Code Construction

The document outlines the process for code construction involving welding procedure specifications (WPS) and procedure qualification records (PQR). It involves first checking material specifications and welding processes, then preparing preliminary WPS and PQR documents. If the PQR specimen is not accepted, the WPS and PQR must be revised. If accepted, the WPS can be used for code construction and the PQR is certified.

Uploaded by

saka margaredi
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

WPS & PQR Flow Chart

For Code Construction


Code Construction

Check Material Spec. &


Welding process to be
used for Code
Construction

Prepare
NO Preliminary
Check available of WPS and
Qualified PQR PQR
Specimen
Yes

Review &
Check all
essential
Record all
Variable of
essential
PQR
variable and
actual value of
test

NO NO
Accepted Accepted

Prepare WPS Prepare WPS and


and Certified of
Revise it (if necessary) PQR

Use for Code


Construction