0% found this document useful (0 votes)
62 views12 pages

Minera Santo Domingo PROJECT #M40405 Santo Domingo Project Basic Engineering - Lntp3 - 2

This document provides a summary of comments on a calculation report for the foundations of the Cooper concentrate filtration air and water services at the Santo Domingo Project in Chile. It includes three reviewers' comments on different dates requesting verification of the revision number, project code, and reference to a geotechnical report. The calculation report was approved by the engineering manager and project manager.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
62 views12 pages

Minera Santo Domingo PROJECT #M40405 Santo Domingo Project Basic Engineering - Lntp3 - 2

This document provides a summary of comments on a calculation report for the foundations of the Cooper concentrate filtration air and water services at the Santo Domingo Project in Chile. It includes three reviewers' comments on different dates requesting verification of the revision number, project code, and reference to a geotechnical report. The calculation report was approved by the engineering manager and project manager.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 12

Comments summary on <MSD-SD005-2170-HO-CAL-0105-B-AWC.

pdf>
Created on 11/5/2020 at 12:4:12 Page 1
1 cristian.prado 06/05/2020 18:35:51
06-May-2020 // TTLS-0596
2 145966 10/05/2020 16:12:35
Eric
3 145966 10/05/2020 16:13:04
10/05/20

MINERA SANTO DOMINGO

PROJECT Nº M40405

SANTO DOMINGO PROJECT


07.05.2020

BASIC ENGINEERING – LNTP3 - 2


0D\77/6
1

CALCULATION REPORT
COOPER CONCENTRATE FILTRATION AIR AND WATER
SERVICES - FOUNDATIONS
Nº M40405-2170-DD20-CAL-0105

CLIENT N° MSD-SD005-2170-HO-CAL-0105
Prepared by

Wood

(ULF  Approved by


2 3
Discipline Leader Rodrigo García (RG)
Project Engineer
Engineering Manager Rodrigo Nicólas (RN) /2*
Project Manager Rodrigo Nicólas (RN) 0$<
Client Arnold Hur (AH) 7

Rev. Date Purpose of Revision Prepared Checked Approved


A 27/03/20 INTERNAL COORDINATION JH RG RN
B 05/05/20 CUSTOMER APPROVAL JH RG RN

Comments

MSD-SD005-2170-HO-CAL-0105

Notes
Comments summary on <MSD-SD005-2170-HO-CAL-0105-B-AWC.pdf>
Created on 11/5/2020 at 12:4:12 Page 5
1 leonardo.delahoz 07/05/2020 10:54:11
MSD code
2 leonardo.delahoz 07/05/2020 10:54:40
Verify Revision
3 leonardo.delahoz 07/05/2020 10:56:34
Geotechnical report

1.0 INTRODUCTION

Wood is developing for POSCO E&C the engineering service which includes the review
of Definitive Feasibility Study of part of the Wet Area, and the development of Basic
Engineering for these areas of the Santo Domingo Project.

The project comprises the implementation of a copper-iron-gold concentrator plant with


a nominal processing capacity of 60.000 tpd, a concentrate pipeline, a water pipeline, a
concentrate filtration plant and shiploading facilities, at the Third Region of Chile.

The mine and plant site are located 50 km west from El Salvador, 60 km east from
Chañaral and 130 km north from Copiapó, at an elevation ranging from 1.000 to 1.280
m.a.s.l, in the municipality of Diego de Almagro.

The magnetite concentrates filtration plant and the ship loading facilities are located at
Punta Roca Blanca area, in the municipality of Caldera.

2.0 SCOPE

This report covers the design, at a basic engineer level, of the air and water service
equipment and pumps, in accord to the design loads and the structural design criteria
M40405-0000-DD20-DSC-0001.

MSD code
1
3.0 REFERENCES Verify Revision

The following references were used to prepare this report.

Table 3-1: Reference documents

N° Document Description Rev.


Santo Domingo project - Design criteria 2
1 MSD-SD005-0000-GE-DSC-0001 O
for structures

Geotechnical report

3
MSD-SD005-2170-HO-CAL-0105 PAGE 5 of 16

Notes
Comments summary on <MSD-SD005-2170-HO-CAL-0105-B-AWC.pdf>
Created on 11/5/2020 at 12:4:12 Page 6
1 leonardo.delahoz 07/05/2020 10:59:42
Not a drawing

Drawings

Table 3-2: Reference drawings

N° Drawing Description Rev.

1 M40405-STD_2020-04-24 PDMS model 06/05/2020


MSD-SD005-0000-ME-LST-
2 Mechanical equipment list P
0101-A

3.2 Standards and design codes Not a drawing


1
In the preparation of this document the following designing codes were used:

Table 3-3: Standards for load estimation and design requirements

N° Drawing Description

1 NCh2369:2003 Seismic Design of Industrial Structures and Installations.

2 NCh432:2010 Structural Design - Wind loads.

3 NCh1537:2009 Structural Design - Permanent loads and use loads.


Structural Design - General design and load
4 NCh3171:2010
combinations.
5 API650:2007 Storage tanks design and construction

Table 3-4: Standards for concrete design

N° Document Description

1 ACI 318-08 Building Code Requirements for Structural Concrete

2 NCh 430:2008 Hormigón Armado – Requisitos de diseño y cálculo

MSD-SD005-2170-HO-CAL-0105 PAGE 6 of 16

Notes
Comments summary on <MSD-SD005-2170-HO-CAL-0105-B-AWC.pdf>
Created on 11/5/2020 at 12:4:12 Page 9
1 leonardo.delahoz 07/05/2020 17:27:43
Why is not considered this indication for
calculations?
2 leonardo.delahoz 07/05/2020 11:38:37
Verify
3 leonardo.delahoz 07/05/2020 17:31:57
Iindicate Self weights in this section

Bearing soil material

Geotechnical report states that the structural fill will have a unit weight higher than 2,0
tonf/m3.

The following structural fill properties are used for analysis:

 Soil type, NCh2369:2003 : II


 Unit weight :  = 1,7 tonf/m3 Why is not
considered this
 Internal friction angle :  = 30 °
indication for
 Dynamic modulus of elasticity : Ed = 850 MPa
calculations?
 Dynamic shear modulus : Gd = 40 MPa
1
 Dynamic Poisson ratio :  = 0,22
 Internal damping : Di = 0,04
 Allowable static bearing pressure : s = 0,12 MPa ~= 1,2 kgf/cm2

Allowable dynamic bearing pressure : d = 0,18 MPa ~= 1,8 kgf/cm2

Verify
5.0 LOADS 2

5.1 Dead loads (DL)

Self weight

Obtained multiplying the concrete unit weight (2,5 tonf/m3) by the total foundation
volume.

Iindicate Self weights in this


section
3

MSD-SD005-2170-HO-CAL-0105 PAGE 9 of 16

Notes
Comments summary on <MSD-SD005-2170-HO-CAL-0105-B-AWC.pdf>
Created on 11/5/2020 at 12:4:12 Page 10
1 leonardo.delahoz 10/05/2020 14:52:46
Indicate references for density. Verify with
liquid height on annexes.
2 leonardo.delahoz 07/05/2020 21:08:08
Ok, but why is not used the same criteria for
pumps?
I agree with 1,0 for pumps and 1,2 for tanks
but it is important a backup.
Indicate references
for density. Verify 3 leonardo.delahoz 07/05/2020 17:54:10
with liquid height on No reference, Standard for load estimation.
Tank and pump contents load according to table 3-3
annexes.
The weight of the tank contents is considered and calculated by multiplying the total
volume of the tank with the density of the content. The densities and volume are show
in the following Table 5-1.

Table 5-1: Equipment and density


1
Active Total Load Content
Density
Equipment Volume Volume [ton] Load
[ton/m3]
[m3] [m3] [ton]
Process water 30 49,9 1 5,9 49,9
Desalinated water 30 49,9 1,05 5,9 52,4
Recovered water 10 21,6 1,05 2,9 22,7
Recovered cooper 30 65,1 1,8 6,5 117,2

5.2 Live loads (LL)

Live loads are part of the pump loads. See pump loads for live loads. No additional live
loads are considered.

5.3 Earthquake loads (EL)

Foundation seismic loads are obtained through a static analysis, considering the
following NCh2369:2003 parameters:

 Soil type : II Ok, but why is not used the


 Elastic response reduction factor : R=4 same criteria for pumps?
I agree with 1,0 for pumps
 Damping ratio : =0,05 and 1,2 for tanks but it is
 Seismic importance : I = 1,2 important a backup.

 Max. horizontal seismic coeff. : Ch max = 0,264 2

 Vertical seismic coefficient : Cv = 0,267


The effect of the earthquake over the tank content is evaluated using the equations
present in the reference 5 for impulsive and convective coefficients and loads.

MSD-SD005-2170-HO-CAL-0105 PAGE 10 of 16
No reference, Standard for load estimation.
according to table 3-3
3

Notes
Comments summary on <MSD-SD005-2170-HO-CAL-0105-B-AWC.pdf>
Created on 11/5/2020 at 12:4:12 Page 14
1 leonardo.delahoz 07/05/2020 21:17:56
Verify results according comments on
annexes.

Tank foundations stability results

The following table summarizes stability results for the foundations of each tank in the copper
concentrate area. Corresponding calculations are presented on section of this document.

Table 6-2: Stability results (Tank)

Compression Maximum bearing Overturning


Tank TAG N° Sliding SF
area [%] pressure [kgf/cm2] SF

2179-TK-0072 100 1,2 2,6 2,4

2179-TK-0073 100 1,2 2,6 2,4

2173-TK-0033 80 1,3 2,1 2,5

2172-TK-0074 100 1,5 5,4 5,3

Pumps foundations dimensions Verify results according comments on annexes.


1
Table 6-3 presents the design dimensions for each pump of the copper concentrate area,
according to the scheme in Figure 6-2.

Table 6-3: Foundation dimensions

L B hf
Pump TAG N° Descripción
[m] [m] [m]
2179-PU-0407 Process water
1,4 0,8 1
2179-PU-0408 pump
2179-PU-0409 Desalinated water
1,2 0,6 1
2179-PU-0410 pump
2173-PU-0103 Recovered water
1,2 0,6 1
2173-PU-0104 pump
2172-PU-0304 Recovered copper
1,4 0,8 1
2172-PU-0305 concentrate pump
2179-PU-0412
Seal water pump 0,6 0,2 1
2179-PU-0413

MSD-SD005-2170-HO-CAL-0105 PAGE 14 of 16

Notes
Comments summary on <MSD-SD005-2170-HO-CAL-0105-B-AWC.pdf>
Created on 11/5/2020 at 12:4:12 Page 16
1 leonardo.delahoz 07/05/2020 19:36:40
Where are presented those operational
requirements?
Please add in references and specify the
section where appear.

The dimensions of these foundations are defined by operational requirements, which explains the
high safety factors.

According to the design criteria for structures, for light vibratory equipment the foundation weight
must be 2.5 times the weight of the pump it supports. Table 6-5 shows that this is complied for
each pump.
Where are
Table 6-5: Vibration verification
presented those
operational Pump Foundation
Pump/Foundation
requirements? Pump TAG N° weight weight
weight ratio
Please add in [kgf] [kgf]
references and 2179-PU-0407
209 2800 13,4
specify the section 2179-PU-0408
where appear. 2179-PU-0409
101 2500 24,7
2179-PU-0410 1
2173-PU-0103
130 2500 19,23
2173-PU-0104
2172-PU-0304
209 2800 13,4
2172-PU-0305
2179-PU-0412
16,2 300 18,52
2179-PU-0413

MSD-SD005-2170-HO-CAL-0105 PAGE 16 of 16

Notes
Comments summary on <MSD-SD005-2170-HO-CAL-0105-B-AWC.pdf>
Created on 11/5/2020 at 12:4:12 Page 18
1 leonardo.delahoz 07/05/2020 19:40:52
Tank has 4,4m of height. How was defined
this height?

Tank has 4,4m of


height. How was
defined this height?
1

Notes
Comments summary on <MSD-SD005-2170-HO-CAL-0105-B-AWC.pdf>
Created on 11/5/2020 at 12:4:12 Page 19
1 leonardo.delahoz 07/05/2020 21:11:16
verify all calculations according to the
comment made before

verify all calculations


according to the
comment made
before

Notes
Comments summary on <MSD-SD005-2170-HO-CAL-0105-B-AWC.pdf>
Created on 11/5/2020 at 12:4:12 Page 24
1 leonardo.delahoz 07/05/2020 20:45:20
Tank has 4,4m of height. How was defined
this height?

Tank has 4,4m of


height. How was
defined this height?
1

Notes
Comments summary on <MSD-SD005-2170-HO-CAL-0105-B-AWC.pdf>
Created on 11/5/2020 at 12:4:12 Page 30
1 leonardo.delahoz 07/05/2020 20:48:38
Tank has 3,3m of height. How was defined
this height?

Tank has 3,3m of


height. How was
defined this height?
1

Notes
Comments summary on <MSD-SD005-2170-HO-CAL-0105-B-AWC.pdf>
Created on 11/5/2020 at 12:4:12 Page 43
1 leonardo.delahoz 07/05/2020 20:54:48
OK with this, but need backup or a reason
for this factor assumed.

OK with this, but


need backup or a
reason for this
factor assumed.