N C (1-P) / A P: N No. of Observations To Be Collected
N C (1-P) / A P: N No. of Observations To Be Collected
Whichever is lower
tr = time between the rounds = time per day / rounds per day = 8 x 60 / 16 = 30 mins.
9:00 –
9:30 –
10:00 –
10:30 –
1/3 tr ≤ t ≤ 1/2tr
1/3 X 30 ≤ t ≤ 1/2 X 30
10 Mins. ≤ t ≤ 15 Mins.
9:30 – 9:41
10:00 – 10:11
10:30 – 10:41
Ni = Idle Observations = 2 + 1+ 1+ 1= 5
Np = productive observations = Nm + Nh = 95
t = time per unit = total study time / total work done = 10 x 8 x 60 /480 = 10 mins.
The study was conducted for 5 days of 8 hours each and during this time 48 units were produced by
working group having performance rating of 110 % and management has decided to give allowances
of 10%, calculate the standard time.