Excavation Manually
Excavation Manually
Ref:
Section / Dept: civil Name Activity: Risk Assessment for Manual Location/Area:-
of Contractor:- Excavation
Proba
Risk rating
bility
bility
Sl Basic Job Potential Consequence Current control measure Initial Additi Ri
ual
Proba
risk
Resid
No. Steps Hazard Risk onal s
contro k
l ra
P E A R P E A R
measu ti
n
re
g
Barricading of the area
Fall in Serious
2 0 0 1 2 4
excavated pit Injury/Fatality
Allow only authorised person inside the
barricading
Damaged to
Injury and loss Excavation only done through permit to
Manual underground 0 1 2 1 2 4
of production work
1
Excavation pipeline
Underground Serious
Follw the permit to work system 1 0 1 1 2 2
cables Injury/Fatality
Collaps of
building and Get Excavation shall be done with proper 1 0 2 1 2 4
adjoining Injury/Fatality sloping and it should be properly shored
structure
Slip of Man/ Materials during ascending and descending in the excavated pit ------- Proper access to be
1
provided for ascending and descending
2 Material or any equipement should not be stacked at the edge of excavated pit