This risk assessment form summarizes potential hazards for a manual excavation activity. It identifies 3 main risks: 1) fall into the excavated pit, which could result in serious injury or death; 2) damage to underground pipelines or cables, which could result in injury, loss of production, or serious injury; and 3) collapse of adjoining structures, which could result in injury or death. Current control measures to mitigate these risks include barricading the work area, only allowing authorized personnel, following a permit to work system, proper sloping and shoring of excavations. Additional controls are also identified such as proper access for ascending/descending and not stacking materials at excavation edges.

Uploaded by

Jack P
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
252 views

Excavation Manually

This risk assessment form summarizes potential hazards for a manual excavation activity. It identifies 3 main risks: 1) fall into the excavated pit, which could result in serious injury or death; 2) damage to underground pipelines or cables, which could result in injury, loss of production, or serious injury; and 3) collapse of adjoining structures, which could result in injury or death. Current control measures to mitigate these risks include barricading the work area, only allowing authorized personnel, following a permit to work system, proper sloping and shoring of excavations. Additional controls are also identified such as proper access for ascending/descending and not stacking materials at excavation edges.

Uploaded by

Jack P
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

Risk Assessment/Management Form

Ref:
Section / Dept: civil Name Activity: Risk Assessment for Manual Location/Area:-
of Contractor:- Excavation

Proba
Risk rating

bility

bility
Sl Basic Job Potential Consequence Current control measure Initial Additi Ri

ual
Proba

risk
Resid
No. Steps Hazard Risk onal s
contro k
l ra
P E A R P E A R
measu ti
n
re
g
Barricading of the area
Fall in Serious
2 0 0 1 2 4
excavated pit Injury/Fatality
Allow only authorised person inside the
barricading

Damaged to
Injury and loss Excavation only done through permit to
Manual underground 0 1 2 1 2 4
of production work
1
Excavation pipeline

Underground Serious
Follw the permit to work system 1 0 1 1 2 2
cables Injury/Fatality

Collaps of
building and Get Excavation shall be done with proper 1 0 2 1 2 4
adjoining Injury/Fatality sloping and it should be properly shored
structure

Additional Control Measure

Slip of Man/ Materials during ascending and descending in the excavated pit ------- Proper access to be
1
provided for ascending and descending

2 Material or any equipement should not be stacked at the edge of excavated pit

3 Excavated materials should not be stacked at the edge of excavated pit


Prepared By Approved By Reviwed By