75% found this document useful (4 votes)
5K views

CHECKLIST For Installation & Testing of Fire Fighting Pipe Work

The checklist ensures that the firefighting pipe work installation meets specifications by verifying that: 1) Materials and piping matches approved submittals; 2) Hangers, supports, joints, and valves are installed correctly according to drawings; 3) The installation coordinates with other services and allows for maintenance access.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
75% found this document useful (4 votes)
5K views

CHECKLIST For Installation & Testing of Fire Fighting Pipe Work

The checklist ensures that the firefighting pipe work installation meets specifications by verifying that: 1) Materials and piping matches approved submittals; 2) Hangers, supports, joints, and valves are installed correctly according to drawings; 3) The installation coordinates with other services and allows for maintenance access.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

CHECK LIST FOR INSTALLATION &

TESTING OF FIRE FIGHTING PIPE WORK

S.No. Description Yes No Remarks

Check that the materials are in accordance


1.
with the approved material submittal
Check the type, size and routing of fire fighting
2. pipes.

Check hangers and supports are provided at


3. specified intervals and as per approved drawing.
Check the joints & flanges are correctly made,
4. joined and sealed with approved method and as
per manufacturer's instructions as applicable.
Check whether the installation is coordinated with
5. other services.

Check the valves, gauges & strainers etc. are


6. installed as per approved drawing.
Check the sleeves are installed at wall crossing
7. and fire stopping provided where required.
Ensure adequate space is available for
8. maintenance and removal of valves, gauges,
strainers as applicable.
Check identification, valve tags, flow direction are
9. provided as per specification.
10. Check whether pressure test is conducted

Comments: