Report For: PAX-40919-01 LP Compressor After Cooler - HBH
Report For: PAX-40919-01 LP Compressor After Cooler - HBH
REPORT FOR
PAX-40919-01 LP Compressor After Cooler - HBH
Page 1 of 36
Company: SONATRACH Date
SOUTH WEST GAS FIELD DEVELOPMENT
PROJECT: PROJECT, ALGERIA. REALIZATION OF GAS 19/01/2020
TREATMENT UNIT (EPC 2 – PHASE 1)
DESIGN CALCULATION & ANALYSIS REPORT
Doc.Title FOR AIR COOLER SUPPORTING STRUCTURE Revision: 0
40919-01 LP Compressor After Cooler - HBH
Doc. No. PAX-40919-01
Table of Contents
2. Design Input................................................................................................................................. 3
4. Geometry of Structure.................................................................................................................. 4
5. Calculations............................................................................................................................... 12
5.1. Dead Load:......................................................................................................................... 12
5.2. Live Load :......................................................................................................................... 14
5.3. Equipment Empty Load Calculations:................................................................................15
5.4. Equipment Testing Load Calculations:-.............................................................................16
5.5. Equipment Operating Load Calculations:-..........................................................................18
5.6 Nozzle Load:........................................................................................................................ 19
5.7 Wind Load:.......................................................................................................................... 20
5.8 Seismic Load:...................................................................................................................... 25
7. STAAD INPUT/ANALYSIS.........................................................................................................29
7.1 SECTION PROPERTIES.....................................................................................................29
7.2 MATERIAL PROPERTIES.................................................................................................29
7.3 SUPPORTS........................................................................................................................ 29
7.4 Basic Load Cases............................................................................................................... 30
7.5 Combination Load Cases (As Per BS5950).......................................................................30
Page 2 of 36
Company: SONATRACH Date
SOUTH WEST GAS FIELD DEVELOPMENT
PROJECT: PROJECT, ALGERIA. REALIZATION OF GAS 19/01/2020
TREATMENT UNIT (EPC 2 – PHASE 1)
DESIGN CALCULATION & ANALYSIS REPORT
Doc.Title FOR AIR COOLER SUPPORTING STRUCTURE Revision: 0
40919-01 LP Compressor After Cooler - HBH
Doc. No. PAX-40919-01
2. Design Input
GENERAL ARRANGEMENT - GA 41917-01-08
Job Specification for Air cooled heat exchangers – 11.Job spec. (Eqpt. Div.) B016-501-80-
43-SP-9502
ENGINEERING DESIGN BASIS 73. B015-999-81-41-EDB-1001, Rev 0
Page 3 of 36
Company: SONATRACH Date
SOUTH WEST GAS FIELD DEVELOPMENT
PROJECT: PROJECT, ALGERIA. REALIZATION OF GAS 19/01/2020
TREATMENT UNIT (EPC 2 – PHASE 1)
DESIGN CALCULATION & ANALYSIS REPORT
Doc.Title FOR AIR COOLER SUPPORTING STRUCTURE Revision: 0
40919-01 LP Compressor After Cooler - HBH
Doc. No. PAX-40919-01
4. Geometry of Structure
Page 4 of 36
Company: SONATRACH Date
SOUTH WEST GAS FIELD DEVELOPMENT
PROJECT: PROJECT, ALGERIA. REALIZATION OF GAS 19/01/2020
TREATMENT UNIT (EPC 2 – PHASE 1)
DESIGN CALCULATION & ANALYSIS REPORT
Doc.Title FOR AIR COOLER SUPPORTING STRUCTURE Revision: 0
40919-01 LP Compressor After Cooler - HBH
Doc. No. PAX-40919-01
Page 5 of 36
Company: SONATRACH Date
SOUTH WEST GAS FIELD DEVELOPMENT
PROJECT: PROJECT, ALGERIA. REALIZATION OF GAS 19/01/2020
TREATMENT UNIT (EPC 2 – PHASE 1)
DESIGN CALCULATION & ANALYSIS REPORT
Doc.Title FOR AIR COOLER SUPPORTING STRUCTURE Revision: 0
40919-01 LP Compressor After Cooler - HBH
Doc. No. PAX-40919-01
Page 6 of 36
Company: SONATRACH Date
SOUTH WEST GAS FIELD DEVELOPMENT
PROJECT: PROJECT, ALGERIA. REALIZATION OF GAS 19/01/2020
TREATMENT UNIT (EPC 2 – PHASE 1)
DESIGN CALCULATION & ANALYSIS REPORT
Doc.Title FOR AIR COOLER SUPPORTING STRUCTURE Revision: 0
40919-01 LP Compressor After Cooler - HBH
Doc. No. PAX-40919-01
Page 7 of 36
Company: SONATRACH Date
SOUTH WEST GAS FIELD DEVELOPMENT
PROJECT: PROJECT, ALGERIA. REALIZATION OF GAS 19/01/2020
TREATMENT UNIT (EPC 2 – PHASE 1)
DESIGN CALCULATION & ANALYSIS REPORT
Doc.Title FOR AIR COOLER SUPPORTING STRUCTURE Revision: 0
40919-01 LP Compressor After Cooler - HBH
Doc. No. PAX-40919-01
Page 8 of 36
Company: SONATRACH Date
SOUTH WEST GAS FIELD DEVELOPMENT
PROJECT: PROJECT, ALGERIA. REALIZATION OF GAS 19/01/2020
TREATMENT UNIT (EPC 2 – PHASE 1)
DESIGN CALCULATION & ANALYSIS REPORT
Doc.Title FOR AIR COOLER SUPPORTING STRUCTURE Revision: 0
40919-01 LP Compressor After Cooler - HBH
Doc. No. PAX-40919-01
Page 9 of 36
Company: SONATRACH Date
SOUTH WEST GAS FIELD DEVELOPMENT
PROJECT: PROJECT, ALGERIA. REALIZATION OF GAS 19/01/2020
TREATMENT UNIT (EPC 2 – PHASE 1)
DESIGN CALCULATION & ANALYSIS REPORT
Doc.Title FOR AIR COOLER SUPPORTING STRUCTURE Revision: 0
40919-01 LP Compressor After Cooler - HBH
Doc. No. PAX-40919-01
Page 10 of 36
Company: SONATRACH Date
SOUTH WEST GAS FIELD DEVELOPMENT
PROJECT: PROJECT, ALGERIA. REALIZATION OF GAS 19/01/2020
TREATMENT UNIT (EPC 2 – PHASE 1)
DESIGN CALCULATION & ANALYSIS REPORT
Doc.Title FOR AIR COOLER SUPPORTING STRUCTURE Revision: 0
40919-01 LP Compressor After Cooler - HBH
Doc. No. PAX-40919-01
Operating Platform
Page 11 of 36
Company: SONATRACH Date
SOUTH WEST GAS FIELD DEVELOPMENT
PROJECT: PROJECT, ALGERIA. REALIZATION OF GAS 19/01/2020
TREATMENT UNIT (EPC 2 – PHASE 1)
DESIGN CALCULATION & ANALYSIS REPORT
Doc.Title FOR AIR COOLER SUPPORTING STRUCTURE Revision: 0
40919-01 LP Compressor After Cooler - HBH
Doc. No. PAX-40919-01
5. Calculations
In this Load case, STAAD Pro command “Self Weight Y ‐1”, is defined to take care of the
self weight of the supporting steel structure. Dead Load due to a) Service Operating Plat
form with Gratings b) Steel Stair Case Dead Loads Calculations are Shown Below .
Page 12 of 36
Company: SONATRACH Date
SOUTH WEST GAS FIELD DEVELOPMENT
PROJECT: PROJECT, ALGERIA. REALIZATION OF GAS 19/01/2020
TREATMENT UNIT (EPC 2 – PHASE 1)
DESIGN CALCULATION & ANALYSIS REPORT
Doc.Title FOR AIR COOLER SUPPORTING STRUCTURE Revision: 0
40919-01 LP Compressor After Cooler - HBH
Doc. No. PAX-40919-01
Page 13 of 36
Company: SONATRACH Date
SOUTH WEST GAS FIELD DEVELOPMENT
PROJECT: PROJECT, ALGERIA. REALIZATION OF GAS 19/01/2020
TREATMENT UNIT (EPC 2 – PHASE 1)
DESIGN CALCULATION & ANALYSIS REPORT
Doc.Title FOR AIR COOLER SUPPORTING STRUCTURE Revision: 0
40919-01 LP Compressor After Cooler - HBH
Doc. No. PAX-40919-01
Page 14 of 36
Company: SONATRACH Date
SOUTH WEST GAS FIELD DEVELOPMENT
PROJECT: PROJECT, ALGERIA. REALIZATION OF GAS 19/01/2020
TREATMENT UNIT (EPC 2 – PHASE 1)
DESIGN CALCULATION & ANALYSIS REPORT
Doc.Title FOR AIR COOLER SUPPORTING STRUCTURE Revision: 0
40919-01 LP Compressor After Cooler - HBH
Doc. No. PAX-40919-01
Dead Load from Equipment Consists of weight of tubes and Headers, plenums, fans ,
structural members, Nozzles and C frames
Weight of Tube Bundles per Bay with frames per Bay is 3950+1600=5550X2 = 11100 Kgs.
Page 15 of 36
Company: SONATRACH Date
SOUTH WEST GAS FIELD DEVELOPMENT
PROJECT: PROJECT, ALGERIA. REALIZATION OF GAS 19/01/2020
TREATMENT UNIT (EPC 2 – PHASE 1)
DESIGN CALCULATION & ANALYSIS REPORT
Doc.Title FOR AIR COOLER SUPPORTING STRUCTURE Revision: 0
40919-01 LP Compressor After Cooler - HBH
Doc. No. PAX-40919-01
Fig. Isometric Views Showing Equipment Empty Load Acting on the Members
Page 16 of 36
Company: SONATRACH Date
SOUTH WEST GAS FIELD DEVELOPMENT
PROJECT: PROJECT, ALGERIA. REALIZATION OF GAS 19/01/2020
TREATMENT UNIT (EPC 2 – PHASE 1)
DESIGN CALCULATION & ANALYSIS REPORT
Doc.Title FOR AIR COOLER SUPPORTING STRUCTURE Revision: 0
40919-01 LP Compressor After Cooler - HBH
Doc. No. PAX-40919-01
Fig. Isometric Views Showing Equipment Testing Load Acting on the Members
Page 17 of 36
Company: SONATRACH Date
SOUTH WEST GAS FIELD DEVELOPMENT
PROJECT: PROJECT, ALGERIA. REALIZATION OF GAS 19/01/2020
TREATMENT UNIT (EPC 2 – PHASE 1)
DESIGN CALCULATION & ANALYSIS REPORT
Doc.Title FOR AIR COOLER SUPPORTING STRUCTURE Revision: 0
40919-01 LP Compressor After Cooler - HBH
Doc. No. PAX-40919-01
Page 18 of 36
Company: SONATRACH Date
SOUTH WEST GAS FIELD DEVELOPMENT
PROJECT: PROJECT, ALGERIA. REALIZATION OF GAS 19/01/2020
TREATMENT UNIT (EPC 2 – PHASE 1)
DESIGN CALCULATION & ANALYSIS REPORT
Doc.Title FOR AIR COOLER SUPPORTING STRUCTURE Revision: 0
40919-01 LP Compressor After Cooler - HBH
Doc. No. PAX-40919-01
Fig. Isometric Views Showing Equipment Operating Load Acting on the Members
Page 19 of 36
Company: SONATRACH Date
SOUTH WEST GAS FIELD DEVELOPMENT
PROJECT: PROJECT, ALGERIA. REALIZATION OF GAS 19/01/2020
TREATMENT UNIT (EPC 2 – PHASE 1)
DESIGN CALCULATION & ANALYSIS REPORT
Doc.Title FOR AIR COOLER SUPPORTING STRUCTURE Revision: 0
40919-01 LP Compressor After Cooler - HBH
Doc. No. PAX-40919-01
And 1.5 inch Nozzle load 3 times of API Allowable load applied
Page 20 of 36
Company: SONATRACH Date
SOUTH WEST GAS FIELD DEVELOPMENT
PROJECT: PROJECT, ALGERIA. REALIZATION OF GAS 19/01/2020
TREATMENT UNIT (EPC 2 – PHASE 1)
DESIGN CALCULATION & ANALYSIS REPORT
Doc.Title FOR AIR COOLER SUPPORTING STRUCTURE Revision: 0
40919-01 LP Compressor After Cooler - HBH
Doc. No. PAX-40919-01
Page 21 of 36
Company: SONATRACH Date
SOUTH WEST GAS FIELD DEVELOPMENT
PROJECT: PROJECT, ALGERIA. REALIZATION OF GAS 19/01/2020
TREATMENT UNIT (EPC 2 – PHASE 1)
DESIGN CALCULATION & ANALYSIS REPORT
Doc.Title FOR AIR COOLER SUPPORTING STRUCTURE Revision: 0
40919-01 LP Compressor After Cooler - HBH
Doc. No. PAX-40919-01
Page 22 of 36
Company: SONATRACH Date
SOUTH WEST GAS FIELD DEVELOPMENT
PROJECT: PROJECT, ALGERIA. REALIZATION OF GAS 19/01/2020
TREATMENT UNIT (EPC 2 – PHASE 1)
DESIGN CALCULATION & ANALYSIS REPORT
Doc.Title FOR AIR COOLER SUPPORTING STRUCTURE Revision: 0
40919-01 LP Compressor After Cooler - HBH
Doc. No. PAX-40919-01
Wind Load Calculation on Supports:
Wind Load Along X Direction
Exposed Projected Area = 16.43 sq.m
(Conservatively Taken)
Total Wind
Load = 22.18 kN
Tension/Compression = 9.84 kN
Compression/ Tension
Tension/ Compression per Support = 3.28 kN
Compression/ Tension
Total Wind load will go as Shear for the Base of
Equipment
Conservatively Taken only Shear will be taken by 4
Supports
Shear / Support = 3.70 kN
Bolts Shall Be checked for
3.70 kN Shear
3.28 kN Tension & Compression
Wind Load Along Z Direction
Exposed Projected Area = 4.76 sq.m
(Conservatively Taken)
Total Wind
Load = 6.42 kN
Tension/Compression = 0.82 kN
Compression/ Tension
Tension/ Compression per Support = 0.41 kN
Compression/ Tension
Total Wind load will go as Shear for the Base of Equipment/Concrete
Interface
Conservatively Taken only Shear will be taken by 4 Supports
Center
Shear / Support = 1.07 kN
Bolts Shall Be checked for
1.07 kN Shear
0.41 kN Tension & Compression
Page 23 of 36
Company: SONATRACH Date
SOUTH WEST GAS FIELD DEVELOPMENT
PROJECT: PROJECT, ALGERIA. REALIZATION OF GAS 19/01/2020
TREATMENT UNIT (EPC 2 – PHASE 1)
DESIGN CALCULATION & ANALYSIS REPORT
Doc.Title FOR AIR COOLER SUPPORTING STRUCTURE Revision: 0
40919-01 LP Compressor After Cooler - HBH
Doc. No. PAX-40919-01
Wind Load (+) X ‐ Direction Fig. Isometric Views Showing Wind Load Acting X-Direction
Page 24 of 36
Company: SONATRACH Date
SOUTH WEST GAS FIELD DEVELOPMENT
PROJECT: PROJECT, ALGERIA. REALIZATION OF GAS 19/01/2020
TREATMENT UNIT (EPC 2 – PHASE 1)
DESIGN CALCULATION & ANALYSIS REPORT
Doc.Title FOR AIR COOLER SUPPORTING STRUCTURE Revision: 0
40919-01 LP Compressor After Cooler - HBH
Doc. No. PAX-40919-01
Wind Load (+) Z ‐ Direction Fig. Isometric Views Showing Wind Load Acting Z-Direction
Seismic Load in (+) X – Direction Fig. Isometric Views Showing Seismic Load Acting X-
Direction
Page 26 of 36
Company: SONATRACH Date
SOUTH WEST GAS FIELD DEVELOPMENT
PROJECT: PROJECT, ALGERIA. REALIZATION OF GAS 19/01/2020
TREATMENT UNIT (EPC 2 – PHASE 1)
DESIGN CALCULATION & ANALYSIS REPORT
Doc.Title FOR AIR COOLER SUPPORTING STRUCTURE Revision: 0
40919-01 LP Compressor After Cooler - HBH
Doc. No. PAX-40919-01
Seismic Load in (+) Z – Direction Fig. Isometric Views Showing Seismic Load Acting Z-
Direction
Since the geometry of the structure is identical about the centre line, separate Load
cases for Seismic Load in (‐) X and (‐) Z – direction are not considered.
Page 27 of 36
Company: SONATRACH Date
SOUTH WEST GAS FIELD DEVELOPMENT
PROJECT: PROJECT, ALGERIA. REALIZATION OF GAS 19/01/2020
TREATMENT UNIT (EPC 2 – PHASE 1)
DESIGN CALCULATION & ANALYSIS REPORT
Doc.Title FOR AIR COOLER SUPPORTING STRUCTURE Revision: 0
40919-01 LP Compressor After Cooler - HBH
Doc. No. PAX-40919-01
Page 28 of 36
Company: SONATRACH Date
SOUTH WEST GAS FIELD DEVELOPMENT
PROJECT: PROJECT, ALGERIA. REALIZATION OF GAS 19/01/2020
TREATMENT UNIT (EPC 2 – PHASE 1)
DESIGN CALCULATION & ANALYSIS REPORT
Doc.Title FOR AIR COOLER SUPPORTING STRUCTURE Revision: 0
40919-01 LP Compressor After Cooler - HBH
Doc. No. PAX-40919-01
7. STAAD INPUT/ANALYSIS
13 Taper Profile defined in Staad is ISMB 500 with 8 mm thk plate at Inside of Top and Bottom Flange.
E Density
Mat Name
(kN/m2) (kN/m3) (/°F)
7.3 SUPPORTS
Where
DL – Dead Load
LL – Live Load
NL- Nozzle Load
EQ – Earth Quake Load
WL – Wind Load
EEL - Equipment Empty Load
ETL - Equipment Testing Load
Page 30 of 36
Company: SONATRACH Date
SOUTH WEST GAS FIELD DEVELOPMENT
PROJECT: PROJECT, ALGERIA. REALIZATION OF GAS 19/01/2020
TREATMENT UNIT (EPC 2 – PHASE 1)
DESIGN CALCULATION & ANALYSIS REPORT
Doc.Title FOR AIR COOLER SUPPORTING STRUCTURE Revision: 0
40919-01 LP Compressor After Cooler - HBH
Doc. No. PAX-40919-01
FX FY FZ MX MY MZ
Node L/C
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Page 31 of 36
Company: SONATRACH Date
SOUTH WEST GAS FIELD DEVELOPMENT
PROJECT: PROJECT, ALGERIA. REALIZATION OF GAS 19/01/2020
TREATMENT UNIT (EPC 2 – PHASE 1)
DESIGN CALCULATION & ANALYSIS REPORT
Doc.Title FOR AIR COOLER SUPPORTING STRUCTURE Revision: 0
40919-01 LP Compressor After Cooler - HBH
Doc. No. PAX-40919-01
Page 32 of 36
Company: SONATRACH Date
SOUTH WEST GAS FIELD DEVELOPMENT
PROJECT: PROJECT, ALGERIA. REALIZATION OF GAS 19/01/2020
TREATMENT UNIT (EPC 2 – PHASE 1)
DESIGN CALCULATION & ANALYSIS REPORT
Doc.Title FOR AIR COOLER SUPPORTING STRUCTURE Revision: 0
40919-01 LP Compressor After Cooler - HBH
Doc. No. PAX-40919-01
Page 33 of 36
Company: SONATRACH Date
SOUTH WEST GAS FIELD DEVELOPMENT
PROJECT: PROJECT, ALGERIA. REALIZATION OF GAS 19/01/2020
TREATMENT UNIT (EPC 2 – PHASE 1)
DESIGN CALCULATION & ANALYSIS REPORT
Doc.Title FOR AIR COOLER SUPPORTING STRUCTURE Revision: 0
40919-01 LP Compressor After Cooler - HBH
Doc. No. PAX-40919-01
Page 34 of 36
Company: SONATRACH Date
SOUTH WEST GAS FIELD DEVELOPMENT
PROJECT: PROJECT, ALGERIA. REALIZATION OF GAS 19/01/2020
TREATMENT UNIT (EPC 2 – PHASE 1)
DESIGN CALCULATION & ANALYSIS REPORT
Doc.Title FOR AIR COOLER SUPPORTING STRUCTURE Revision: 0
40919-01 LP Compressor After Cooler - HBH
Doc. No. PAX-40919-01
Page 35 of 36
Company: SONATRACH Date
SOUTH WEST GAS FIELD DEVELOPMENT
PROJECT: PROJECT, ALGERIA. REALIZATION OF GAS 19/01/2020
TREATMENT UNIT (EPC 2 – PHASE 1)
DESIGN CALCULATION & ANALYSIS REPORT
Doc.Title FOR AIR COOLER SUPPORTING STRUCTURE Revision: 0
40919-01 LP Compressor After Cooler - HBH
Doc. No. PAX-40919-01
Page 36 of 36