Exercise 1: Piping Fittings: Procedure

The document provides instructions for an exercise involving adding pipe fittings to an existing assembly and checking for clearances in SOLIDWORKS. Students are asked to create four new routes, add fittings like flanges, pipes, tees and valves to one route, and use the clearance verification tool to check for at least 1 inch of clearance between pipes. A second exercise involves creating an assembly of piping on a frame, making flange to flange connections using fittings like pipes, elbows and tees according to the diagram and component details provided.

Uploaded by

Chokri Atef
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
422 views3 pages

Exercise 1: Piping Fittings: Procedure

The document provides instructions for an exercise involving adding pipe fittings to an existing assembly and checking for clearances in SOLIDWORKS. Students are asked to create four new routes, add fittings like flanges, pipes, tees and valves to one route, and use the clearance verification tool to check for at least 1 inch of clearance between pipes. A second exercise involves creating an assembly of piping on a frame, making flange to flange connections using fittings like pipes, elbows and tees according to the diagram and component details provided.

Uploaded by

Chokri Atef
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Exercise 1 SOLIDWORKS

Piping Fittings

Exercise 1: Add pipe fittings, remove pipes and


Piping Fittings check clearances.
This lab uses the following skills:
 Drag and Drop a Fitting
 Split Route to Add Fittings
 Adding Tees at Junctions
 Clearance Verification
Units: inches
Procedure Open the existing assembly Adding Fittings from the
Adding Fittings folder. Create four new routes and add fittings.
Routes Create the four new routes as shown.

1
SOLIDWORKS Exercise 1
Piping Fittings

Add Fittings Edit the route above the Holding Tank and add the flange, pipe, tee
(straight tee inch configuration Tee Inch 2 Sch 40) and valve
(globe valve (asme b16.34) fl -150-2500 configuration
Globe Valve (ASME B16.34) Flanged End, Class 150, NPS 2,
RF as shown.

Interference and Check the clearance between these pipes using Clearance
Clearance Verification. Make sure that there is at least 1” of clearance.

2
Exercise 2 SOLIDWORKS
Piping on a Frame

Exercise 2: Create this assembly for flange to flange


Piping on a connections and associated pipe fittings.
Frame Optionally, add post-route hangers to the
routes.
This lab uses the following skills:
 Drag and Drop a Fitting
 Split Route to Add Fittings
 Adding Tees at Junctions
Units: inches
Procedure Open the assembly Steel Frame from the folder Steel Frame.
Frame Pipe Select from the following files and configurations for the route.
Components

File Configuration
Flange slip on weld flange Slip On Flange 150-NPS 2
Pipe pipe pipe 2 in, Sch 40
Elbows 90deg lr inch elbow 90L LR Inch 2 Sch40
45deg lr inch elbow 45L LR Inch 2 Sch40
Tee straight tee inch Tee Inch 2 Sch 40

Routes Create the routes shown below, using the details that follow.