Format Progress Report Sumbawa
Format Progress Report Sumbawa
For
0
Proposal
DI BUAT DI PERIKSA DI SETUJUI DI PERIKSA DI SETUJUI
REV. TGL STATUS
PT. BARATA INDONESIA Perum BULOG
Pekerjaan Engineering Procurement And Construction
(EPC) Infrastruktur Pasca Panen Modern Rice Milling
Plant (MRMP)
Document No.: Manajemen Pelaksanaan Rev. : 0
Page No
MRMP-SB-GEN-DOC-009 Format Progress Report 2 OF 10
MONTHLY REPORT
EPCC
(BULAN TAHUN )
PURCHASE ORDER NO :
PROJECT NAME : PEMBANGUNAN INFRASTRUKTUR PASCA
PANEN MODERN RICE MILLING PLANT
(MRMP)
DATE :
Pekerjaan Engineering Procurement And Construction
(EPC) Infrastruktur Pasca Panen Modern Rice Milling
Plant (MRMP)
Document No.: Manajemen Pelaksanaan Rev. : 0
Page No
MRMP-SB-GEN-DOC-009 Format Progress Report 3 OF 10
Table of Contents
1. EXECUTIVE SUMMARY............................................................................................... 4
2. OBJECTIVES FOR THIS WEEK ...................................................................................... 5
2.1. ENGINEERING 5
2.2. CONSTRUCTION 5
2.3. PROCUREMENT 5
3. OBJECTIVES ACHIEVED NEXT WEEK ............................................................................ 5
3.1. DESIGN ENGINEERING & PROJECT MANAGEMENT 5
3.2. PROCUREMENT 5
3.3. CONSTRUCTION 5
4. ATTACHMENT ........................................................................................................... 6
4.1. WEEK S-CURVE 6
4.2. MONTHLY S – CURVE 6
4.3. DETAIL ENGINEERING PROGRESS 7
4.4. DETAIL PROCUREMENT PROGRESS 7
4.5. DETAIL CONSTRUCTION PROGRESS 8
4.6. DETAIL COMMISIONING PROGRESS 8
4.7. MANPOWER STATUS 9
5. OBSTACLE AND ACTION PLAN .................................................................................. 10
6. PROJECT PHOTOGRAPHY ......................................................................................... 10
Pekerjaan Engineering Procurement And Construction
(EPC) Infrastruktur Pasca Panen Modern Rice Milling
Plant (MRMP)
Document No.: Manajemen Pelaksanaan Rev. : 0
Page No
MRMP-SB-GEN-DOC-009 Format Progress Report 4 OF 10
1. Executive Summary
Activity until this month for Engineering activity at Gresik are Approval & Approved
Documents, Drawing detail to House Repairing Work, Drawing detail to Settiling Pond
Repairing Work and Document and Image Revision. Construction activity are house
repairing work and repairing or demolition settling pond.
2.2. Construction
•
2.3. Procurement
•
3.2. Procurement
•
3.3. Construction
•
Pekerjaan Engineering Procurement And Construction
(EPC) Infrastruktur Pasca Panen Modern Rice Milling
Plant (MRMP)
Document No.: Manajemen Pelaksanaan Rev. : 0
Page No
MRMP-SB-GEN-DOC-009 Format Progress Report 6 OF 10
4. ATTACHMENT
4.1. Week S-Curve
14 Piping Engineer
15 Civil Engineer
17 Process Engineer
18 Civil Supervisor
19 Field Engineer
20 HSE Officer
21 Piping Drafter
22 Warehouse Man
23 Surveyor
24 Surveyor Assistant