Up DN: GV Lav Lav Lav WC WC
Up DN: GV Lav Lav Lav WC WC
A WC
GV
LAV WC
LAV GV
WC
LAV
HE
LAV
CLASSROOM 3 CLASSROOM 4
B DN UP
1 2 3 4 5 6
A
GV
REVIEWED AS TO
DESIGNED: SUBMITTED: RECOMMENDING APPROVAL APPROVED:(FOR ISSUANCE) PROJECT & LOCATION / BARANGAY: SHEET CONTENTS: SET NO. SHEET NO.
DESIGN CONCEPT:
VARIOUS DPWH
PROPOSED PROJECTS
ROMEO C. OCAMPO PABLO G. RACINES (SEE COVER SHEET) (SEE COVER SHEET) SECOND & THIRD FLOOR WATERLINE LAYOUT, BOD 33
STANDARD THREE-STOREY
PLUMBING DESIGN MANAGING PARTNER JOSEPHINE P. ISTURIS DANTE B. POTANTE RAUL C. ASIS SCHOOL BUILDING
ROOF WATERLINE LAYOUT, P-3
POSITION: SANITARY ENGINEER WATERLINE ISOMETRIC VIEW 44
PRC No.: 000697 TIN No.: 131-678-239 CHIEF, DIRECTOR IV, BOD UNDERSECRETARY ( 6-CLASSROOMS )
PTR No.: 2181627 BUILDINGS DIVISION, BOD (REVISED 3-24-17)