01 Bangunan Intake Pengambilan Bendungan Jlantah-Model - PDF 2

Uploaded by

Ilham Pratama
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
138 views1 page

01 Bangunan Intake Pengambilan Bendungan Jlantah-Model - PDF 2

Uploaded by

Ilham Pratama
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

As Menara Intake As Saluran

D
Pipa D.2000

0,75
690.00
B C HOIST
HOIST

E F G H I
0
1.0
R=

2,00
680.00 A
.X.

. .
C
As Bendungan
.X. . EL.667.50 Timbunan Tubuh

.
670.00 B Bendungan
.X. Contr. Joint EL.663.00

0,75
. .
0
EL.665.50 1:2. EL.666.50 ( As Pipa )
Aliran

1:0.3
EL.667.00 EL.667.00

EL.661.50
660.00
B 95. Beton Bertulang K.225

EL.661.50
EL.662.00
70 Galian Bendungan Lantai akaerja t=10 cm
ELEVASI ( m )

As Saluran Pengelak
83. As Saluran Pengambilan
Beton Bertulang K.225 6.0 92
Lantai akaerja t=10 cm 0 0.30 0,75 2,00 0,75
650.00 6.0
0
6.0 3,72
B 1:2.
0
0
R
I = 26.00°
= 25.00
47.75 17.95 7.22 6.55 27.20
640.00 ( CL ) Pipa Pesat Contr. Joint CL
TL
= 11.55
= 5.88
POTONGAN B - B
D.2000 2.00 4.20 S,B
KETERANGAN: I = 27.00° ( Transisi )
EL.620.20
.X. A : Trashrack (3.00x3.25) Bentang Bersih R = 25.00 C D

. . . . . .
630.00 Beton Bertulang K.225 ( As Pipa )
CL = 11.59 Lantai akaerja t=10 cm Pipa Pesat Diletisi Steenlis Contr. Joint Pengelak Tunnel As Pipa Pesat D.1400
.X. B : Pintu Pengaman Pemeliharaan (2.00x2.00) Bentang Bersih
TL = 5.90 D.2000 Keliling Ø 4.20
.X. C : Pintu Pengaman Layan (2.00x2.00) Bentang Bersih As Pipa Pesat D.2000
620.00 i=0.0017 Aliran As Bangunan Pengelak

( Dasar Tunnel )
0,30 0,30

EL.618.40
Pengelak Tunnel Main Plugng Beton Bertulang K.225 Beton Tak Bertulang Pipa Pesat
Ø 4.20 0.50 0.50 D.1400 Pipa Pesat D.2000
Lantai akaerja t=10 cm Main Pluging
t =10 mm
85.60 C D

0,70
( Slop ) 15.95 50.00 Pipa Pesat D.1400
(Primary Pluging) (Main Pluging) t =10 mm

POTONGAN A - A 0
S,A 2.1 l )
R= unne
0,80 (T
0
0.7

4,20
0,30

5,90
R=
R
( Pip =1.00
aP
esa

1,00
t )
Y=9147750

655.0

Y=9147600

1,80
Y=9147650

Y=9147550
Y=9147700
0 Pipa Drainase Ø200

A
EL.633.00

0,80
EL.638.00

1,00

1,00
660.00 Sal. Irigasi Existing EL.643.00 Pipa Keluaran Ø400
X=508950
Contr. Joint
I = 28.00° Beton Bertulang K.225
R = 50.00 Lantai Kerja t =10 cm
CL = 24.23
665 TL = 12.36 0,70 4,20 0,70
.00 Ali
ran

1:3.2
EL
.66
5.5 Pengelak Tunnel 5,60
EL 0
Ditimbun Kembali
.66 Ø 4.20
1.5 X. .
Sampai EL.667.50
POTONGAN C - C
. .

0 EL.
662

EL
.00

I = 25.00°
0

Menara Intake

i=0.0017
.6
65.5

X=508900 65.5
0 R = 15.00
EL.6

EL.6
CL = 6.55
As Pipa Pesat
670.0
0
T Intake Pengambilan
65.5
0
1:2.0
EL.6
70.0
0
TL = 3.33
As Bangunan Pengelak

(Primary Pluging)
EL.662.00 EL.6
0,60

30.00
EL.663.00
( As Pipa )
65.0
EL.
690
.00
0
Pipa Pengambilan Contr. Joint
Gra
ting

D.2000

0,70
1:2.0 X=508900
U EL.6
70.0
0 EL.620.20 Pipa Pesat D.1400
S 675.00 EL.6 EL.6
( As Pipa ) t =10 mm
EL.665.00

75.0 61.2
0 5
EL.675.00
EL.670.00

EL.6
65.0
0
Contr. Joint
I = 85.00°
+680.00

23.26 0,30 0
R = 6.41 2.1
.00

30.44
EL.670.00
CL = 9.52 R=

33.44
0,80
663

36.43

(Main Pluging)
TL = 5.88
B Baut Angker D.19
39.42
49.04
EL.

100.00
42.41

680.00 0.7

4,20

5,60
R=

0,30
X=508850 17.9 BM.JT-2 2,00

24.00
0
1,41
CP-1 .690.00

1,23
B.17
6.55 NDUNG EL Grating 0,30
PUNCAK BE

1,80

0,53
B.18
685.00 ( CL ) 57.65 171.20 1% Pipa Drainase Ø200

B.19
( Slope )

0,57
B.20
EL

B.21

Drainase
.68

B.22

0,70
BM.JT-8
B.23
2

0,70
X=508850 (0.20x0.30)

( Transisi )
Pipa Keluaran Ø400
.00

4.00

12.40
B.24

EL. 690.00 Beton Tak Bertulang


1:2.4

CP- 6 Diletisi Steenlis Beton Bertulang K.225


1:1

00 Lantai Kerja t =10 cm


0. Keliling
. 68
.0

EL. 690.00 Drainase 0,70 4,20 0,70


EL
5,60

Y=9147550
Y=9147650
Y=9147700

Y=9147600
Y=9147800

.00
Y=9147750

80
POTONGAN D - D
E L. 6
A S,B

S,A KEMENTERIAN PEKERJAAN UMUMDAN PERUMAHAN RAKYAT Provinsi :


DIREKTORAT JENDERAL SUMBER DAYA AIR
JAWA TENGAH
DENAH SATKER BALAI BESAR WILAYAH SUNGAI BENGAWAN SOLO
PEJABAT PEMBUAT KOMITMEN PERENCANAAN DAN PROGRAM
Jl. Solo-Kartosuro Km. 7 PO Box 267, Pabelan, Kartasuro, Sukoharjo 57162, Telp./Fax. (0271) 716248 Kabupaten : KARANGANYAR
JUDUL GAMBAR : INTAKE PENGAMBILAN Pekerjaan :
STUDI INVESTIGASI TAMBAHAN
UNTUK DD BENDUNGAN JLANTAH

0 1 2 3 4 5m DENAH POT. MEMANJANG & MELINTANG No. Register :


S,B No. Lembar :
PT. engineering
BBWS BENGAWAN SOLO ADITYA consultant No. Kontrak :
Jalan Batu Permata No. 2A Margacinta Bandung 40287 Tanggal
0 10 20 30 40 50 m PPK PERENCANAAN DAN PROGRAM Telp: 62+22-7562994.fAXCIMILE:62+22-7562994

S,A
Email: aditya engineering consultant @ yahoo.com
31 HK0203-An.
Direksi Pekerjaan Disetujui Direncana Diperiksa
Januari 02/2017-05
Dr.Yunitta Chandra Sari, SE., ST., MT
2017
Ery Suryo Kusumo, S.Pd., MT. Ir. Suwahno Ir. Hadi Santoso, MT.