This document provides a quality assurance plan for a 3-phase double wound lighting transformer. It outlines testing and inspection procedures to ensure the transformer meets specifications. The plan details:
1) Manufacturer and project details
2) Transformer specifications including voltage ratings and cooling type
3) A 5-step testing and inspection procedure to check dimensions, insulation resistance, voltage withstand, routine tests, and polarity in accordance with IS standards. Inspections will be witnessed by a customer representative.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0%(2)0% found this document useful (2 votes)
2K views
Quality Assurance Plan
This document provides a quality assurance plan for a 3-phase double wound lighting transformer. It outlines testing and inspection procedures to ensure the transformer meets specifications. The plan details:
1) Manufacturer and project details
2) Transformer specifications including voltage ratings and cooling type
3) A 5-step testing and inspection procedure to check dimensions, insulation resistance, voltage withstand, routine tests, and polarity in accordance with IS standards. Inspections will be witnessed by a customer representative.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2
QUALITY ASSURANCE PLAN
3-PHASE DOUBLE WOUND LIGHTING TRANSFORMER
MANUFACTURER : SHEPHERD TRANSFORMER INDUSTRIES
CONSIGNEE : CONSULTANTS : PROJECT : PURCHASE ORDER DATE : P.O. NO. AE’S O/A NO. : I.W.O. NO. A EQUIPMENT DETAILS Description Purchase’s Quantity Identification 3-Phase Double wound Lighting Transformer 01 No. Input – 415V 3ph (ph to ph) 50Hz Delta Output – 415V 3ph(Ph to Ph) Victor group Dyn11 Type of cooling – Air natural Capacity – 300KVA
B. TEST / INSPECTION PROCEDURE
Sr. Code Test/Inspecti Details of Test / Inspection Criteria Judgment Remarks
No No. on Items 1 T-1 Visual Checking Approved drawings To be witnessed by Inspection i) Anodized name-plate and Customer’s other labels Representative ii) General arrangement and Appearance Shade-632 iii) Painting 2 T-2 Dimension Measurement of Principal As per approved -Do- Checking dimension with scale Tape Drawings 3 T-3 Measurement Measurement of Insulation As per IS:2026 to -Do- of IR Value Resistance with 500V DC have IR Better then a) Before HV Meggar between: 100 Mega Ohms Test i) Input Terminals & Earth b) After HV ii) Output Terminals & Earth Test iii) Input & \ Output Terminals 4 T-4 Separate Checking with high voltage As per IS:2026 to -Do- source Breakdown Tester the withstand 3kV for voltage withstanding capacity of One minute withstand insulation between- Test i) Input Terminals & Earth ii) Output Terminals & Earth iii) Input & Output Terminals 5 T-5 Routine 415/415V As per IS: 2026 -Do- Tests - By open Circuit Test & a) Ratio Test Voltage Measurement b) No Load By open Circuit Test - Voltage, As per IS: 2026 -Do- Test IMP – Measurement / S.C. impedance, check c) Resistance Winding resistance check As per IS: 2026 -Do- check d) Short Circuit impedance and As per IS: 2026 -Do- Measurement Load Loss of impedance Voltage e) Polarity Test, As per IS: 2026 -Do- f) Victor Group Test, g) Separate Source voltage supply, h) Induce voltage Test.