This document provides a quality assurance plan for a 3-phase double wound lighting transformer. It outlines testing and inspection procedures to ensure the transformer meets specifications. The plan details: 1) Manufacturer and project details 2) Transformer specifications including voltage ratings and cooling type 3) A 5-step testing and inspection procedure to check dimensions, insulation resistance, voltage withstand, routine tests, and polarity in accordance with IS standards. Inspections will be witnessed by a customer representative.

Uploaded by

SAGAR
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (2 votes)
2K views

Quality Assurance Plan

This document provides a quality assurance plan for a 3-phase double wound lighting transformer. It outlines testing and inspection procedures to ensure the transformer meets specifications. The plan details: 1) Manufacturer and project details 2) Transformer specifications including voltage ratings and cooling type 3) A 5-step testing and inspection procedure to check dimensions, insulation resistance, voltage withstand, routine tests, and polarity in accordance with IS standards. Inspections will be witnessed by a customer representative.

Uploaded by

SAGAR
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

QUALITY ASSURANCE PLAN

3-PHASE DOUBLE WOUND LIGHTING TRANSFORMER

MANUFACTURER : SHEPHERD TRANSFORMER INDUSTRIES


CONSIGNEE :
CONSULTANTS :
PROJECT :
PURCHASE ORDER DATE : P.O. NO.
AE’S O/A NO. : I.W.O. NO.
A EQUIPMENT DETAILS
Description Purchase’s Quantity
Identification
3-Phase Double wound Lighting Transformer 01 No.
Input – 415V 3ph (ph to ph) 50Hz Delta
Output – 415V 3ph(Ph to Ph)
Victor group Dyn11
Type of cooling – Air natural
Capacity – 300KVA

B. TEST / INSPECTION PROCEDURE

Sr. Code Test/Inspecti Details of Test / Inspection Criteria Judgment Remarks


No No. on Items
1 T-1 Visual Checking Approved drawings To be witnessed by
Inspection i) Anodized name-plate and Customer’s
other labels Representative
ii) General arrangement and
Appearance Shade-632
iii) Painting
2 T-2 Dimension Measurement of Principal As per approved -Do-
Checking dimension with scale Tape Drawings
3 T-3 Measurement Measurement of Insulation As per IS:2026 to -Do-
of IR Value Resistance with 500V DC have IR Better then
a) Before HV Meggar between: 100 Mega Ohms
Test i) Input Terminals & Earth
b) After HV ii) Output Terminals & Earth
Test iii) Input & \ Output
Terminals
4 T-4 Separate Checking with high voltage As per IS:2026 to -Do-
source Breakdown Tester the withstand 3kV for
voltage withstanding capacity of One minute
withstand insulation between-
Test i) Input Terminals & Earth
ii) Output Terminals & Earth
iii) Input & Output Terminals
5 T-5 Routine 415/415V As per IS: 2026 -Do-
Tests - By open Circuit Test &
a) Ratio Test Voltage
Measurement
b) No Load By open Circuit Test - Voltage, As per IS: 2026 -Do-
Test IMP – Measurement / S.C.
impedance, check
c) Resistance Winding resistance check As per IS: 2026 -Do-
check
d) Short Circuit impedance and As per IS: 2026 -Do-
Measurement Load Loss
of impedance
Voltage
e) Polarity Test, As per IS: 2026 -Do-
f) Victor Group Test,
g) Separate Source voltage supply,
h) Induce voltage Test.