0% found this document useful (0 votes)
603 views

Time Sheet Coal Hauling: Integrated Mining Services

This document is a time sheet for coal hauling that records information about a shift for a coal hauling operator, including start and end times, routes taken between loading and dumping areas, numbers of trips completed, and reasons for any delays or idle time experienced. It collects details like vehicle and operator identification numbers, materials hauled, distances traveled, and notes from the operator. The purpose is to track the hauling production and efficiency on a given shift.

Uploaded by

PujaPriyambada
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
603 views

Time Sheet Coal Hauling: Integrated Mining Services

This document is a time sheet for coal hauling that records information about a shift for a coal hauling operator, including start and end times, routes taken between loading and dumping areas, numbers of trips completed, and reasons for any delays or idle time experienced. It collects details like vehicle and operator identification numbers, materials hauled, distances traveled, and notes from the operator. The purpose is to track the hauling production and efficiency on a given shift.

Uploaded by

PujaPriyambada
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PT.

KALIMANTAN PRIMA PERSADA


Integrated Mining Services TIME SHEET COAL HAULING
Nama : Tanggal : HM Awal : HM Manual Awal : KM Manual Awal :
NRP : Shift : HM Akhir : HM Manual Akhir : KM Manual Akhir :
Jam Start Unit : Tipe & C/N Unit : Produksi :
Jam Kerja Operator
Jam Stop Unit : Total Ritase : Non Produksi :
RUTE TRANSPORTASI
Area Loading Area Dumping
Trip Alat Loading Time (Waktu) Time (Waktu) Jarak Hauling
Kode Material
Tiba Tes Dumping Start Loading Stop Loading Tiba Start Stop
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
PRODUCTION SHEET
Keterangan Delay & Idle Mulai Selesai Keterangan Delay & Idle Mulai Selesai
ROAD MAINTENANCE (PERBAIKAN
D01. P5M, SAFETY TALK D12.
JALAN)
D02. P2H (PRE USE CHECK ) D13. SHIFT CHANGE (PINDAH SHIFT)
FUEL AND LUBRICATION (ISI FUEL & D14. DUSTY (DEBU)
D03.
LUBE PLUS ANTRI) D15. CLEANING EQP. (CUCI UNIT)
D04. DAILY CHECK D16. FATIQUE CHECK (CEK FATIQUE)
D05. TYRE CHECK (CEK BAN) D17. FATIQUE
D18. NO OPT (TIDAK ADA OPERATOR)
WAITING OPERATOR (TUNGGU
QUEUING at ROM (ANTRIAN DI D19.
D06. OPERATOR)
STOCKPILE)

I01. RAIN (HUJAN)

QUEUING at PORT (ANTRIAN DI


D07.
PELABUHAN)
I02. SLIPPERY (JALAN LICIN)

I03. STRIKE (DEMO)


QUEUING at WEIGHT BRIDGE I04. CUSTOMER PROBLEM
D08.
(ANTRIAN DI TIMBANGAN) KABUT
FORCE ANGIN RIBUT
I05.
D09. REST & MEAL (ISTIRAHAT & MAKAN) MAJEURE POHON TUMBANG
DLL
D10. PRAYING (IBADAH, SHOLAT) ( )
( )
B/D. BREAKDOWN
( )
D11. STOPPAGE (STANDBY BY REQUEST)
( )
KODE MATERIAL CATATAN OPERATOR
OB (OVERBURDEN) CC (COAL CLEAN) HM unit saat pengisian fuel = _________
TS (TANAH MERAH) BT (BATU) Fuel = ________ liter

Dibuat Oleh, Diperiksa Oleh,

(_____________) (_______________)
(Operator) (GL Hauling)